ML16032A006

From kanterella
Revision as of 13:21, 17 November 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Diablo Canyon, Units 1 and 2 - Redacted, Issuance of Amendment Nos. 223 and 225, Revise UFSAR Section 15.4.2.2 to Incorporate Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident into Licensing Basis (CAC MF5785 and MF5786)
ML16032A006
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/19/2016
From: Lingam S P
Plant Licensing Branch IV
To: Halpin E D
Pacific Gas & Electric Co
Lingam S P
References
CAC MF5785, CAC MF5786
Download: ML16032A006 (38)