ML070990074

From kanterella
Jump to navigation Jump to search

Units, 1 and 2, Tech Spec Page for Amendments 196 and 197 Administrative Changes to the Technical Specification 5.5.8, Inservice Testing Program.
ML070990074
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/25/2007
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Wang A, NRR/DORL/LPL4, 301-415-1445
Shared Package
ML070990068 List:
References
TAC MD3975, TAC MD3976
Download: ML070990074 (1)


Text

Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.7 Reactor Coolant Pump Flywheel Inspection Program This program shall provide for the inspection of each reactor coolant pump flywheel per the recommendations of Regulatory Position c.4.b of Regulatory Guide 1.14, Revision 1,

.August 1975.

In lieu of Position c.4.b(1) and c.4.b(2), a qualified in-place UT examination over the volume from the inner-bore of the flywheel to the circle one-half of the outer radius or a surface examination (MT and/or PT) of exposed surfaces of the removed flywheels may

,be conducted at approximately ten year intervals coinciding with the Inservice Inspection schedule as required by ASME Section Xl.

5.5.8 Inservice Testina Proaram This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:

a. Testing frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda as follows:

ASME OM Code and applicable Addenda terminology for Required Frequencies for inservice testing activities performing inservice testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days

,Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days

b. The provisions of SIR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities;
c. The provisions of SIR 3.0.3 are applicable to inservice testing activities; and
d. Nothing in the ASME OM Code shall be construed to supersede the I

requirements of any TS.

(continued)

DIABLO CANYON - UNITS 1 & 2 5.0-9 Unit 1,- Amendment No. 445 196 Unit 2 - Amendment No. -3~5 197