Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23012A2179 February 2023Issuance of Amendment Nos. 244 and 245 Revision to Technical Specifications to Adopt TSTF-569, Revision 2, Revise Response Time Testing DefinitionShutdown Margin
Anticipated operational occurrence
Pressure Boundary Leakage
ML21242A21621 December 2022Issuance of Amendment Nos. 243 and 244 Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (EPID: L-2020-LLA-0261Safe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Cyber Security
Aging Management
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Safeguards Contingency Plan
Earthquake
Maintenance Rule Program
Control of Heavy Loads
Minimum staff
Recently irradiated fuel
Fire Protection Program
Unidentified leakage
DCL-22-059, License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions26 July 2022License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing DefinitionsShutdown Margin
Surveillance Frequency Control Program
Pressure Boundary Leakage
ML21188A3458 July 2021Issuance of Amendment No. 238 Revision to TS 3.7.8, Auxiliary Saltwater (Asw) System (Emergency Circumstances)Ultimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML21188A0377 July 2021Attachment 1 TS_3_7_8 (Marked Up Pages)
ML21188A0357 July 2021Attachment 2 TS_3_7_8 (Retype Pages)
ML21188A0347 July 2021Attachment 3-TS Bases Section 3_7_8 (Marked-up Pages)
DCL-19-094, License Amendment Request 19-02 to Relocate Technical Specification 5.3, Unit Staff Qualifications, to the Updated Final Safety Analysis Report5 December 2019License Amendment Request 19-02 to Relocate Technical Specification 5.3, Unit Staff Qualifications, to the Updated Final Safety Analysis ReportFuel cladding
DCL-18-100, License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology26 December 2018License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident MethodologySafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Coatings
Surveillance Frequency Control Program
Earthquake
Fuel cladding
Affidavit
ML16330A6725 January 2017Issuance of Amendment Nos. 228 and 230, Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas AccumulationSurveillance Frequency Control Program
ML16139A00821 December 2016Issuance of Amendment Nos. 227 and 229, Digital Replacement of the Process Protection System Portion of the Reactor Protection System and Engineered Safety Features Actuation SystemSafe Shutdown
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Operating Basis Earthquake
Cyber Security
Finite Element Analysis
Design basis earthquake
Operability Determination
Earthquake
Fuel cladding
Fire Protection Program
ML16035A44114 April 2016Issuance of Amendment Nos. 225 and 227, Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition)Hot Short
Safe Shutdown
Boric Acid
Mission time
Fire Barrier
Time to boil
Internal Flooding
Probabilistic Risk Assessment
Coatings
Operator Manual Action
Cyber Security
Multiple Spurious Operation
Emergency Lighting
Job Performance Measure
Thermoset
Large early release frequency
Safeguards Contingency Plan
Hemyc
Earthquake
Control of Heavy Loads
Power-Operated Valves
Power Operated Valves
Fire Protection Program
Very Early Warning Fire Detection
ML16083A56423 March 2016License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12., Low Temperature Overpressure Protection (Ltop) System.Stroke time
Surveillance Frequency Control Program
DCL-16-028, Technical Specifications B.4.17., Steam Generator (SG) Tube Integrity, LTOP Orifice-Key Design Features, and Additional Information23 March 2016Technical Specifications B.4.17., Steam Generator (SG) Tube Integrity, LTOP Orifice-Key Design Features, and Additional InformationStroke time
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
ML16055A3599 March 2016Issuance of Amendment Nos. 224 and 226, Revise Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and TS 5.6.5 (COLR) Paragon and Nexus MethodologiesBoric Acid
Hydrostatic
Pressure and Temperature Limits Report
ML16032A00619 February 2016Redacted, Issuance of Amendment Nos. 223 and 225, Revise UFSAR Section 15.4.2.2 to Incorporate Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident Into Licensing BasisLoop seal
Stroke time
Operator Manual Action
Time Critical Operator Action
ML15245A54230 September 2015Issuance of Amendment Nos. 220 and 222, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone H Full Implementation DateCyber Security
Earthquake
ML15204A22227 August 2015Issuance of Amendment Nos. 219 and 221, Adopt Technical Specifications Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294)Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Anticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Backfit
ML15162A8821 July 2015Issuance of Amendment Nos. 218 and 220, Revise Surveillance Requirements in TS 3.8.1, AC Sources, Related to Diesel Generator TestingSurveillance Frequency Control Program
Offsite Circuit
DCL-15-052, Response to NRC Request for Additional Information Regarding License Amendment Request 14-01, Revision to Technical Specification 3.8.1, AC Sources - Operating.29 April 2015Response to NRC Request for Additional Information Regarding License Amendment Request 14-01, Revision to Technical Specification 3.8.1, AC Sources - Operating.Overspeed trip
ML14042A19327 February 2014Issuance of Amendment Nos. 217 and 219, Editorial and Clarifying Changes to Technical Specification (TS) 3.7.10, Control Room Ventilation System (CRVS) and TS 5.6.5, Core Operating Limits Report (COLR) (TAC MF1959-MF1960)Shutdown Margin
Process Control Program
Recently irradiated fuel
ML13130A22510 May 2013Technical Specification 3.5.2 Safety Injection Pump 2-1 Issue Information
ML13267A13531 January 2013Attachment 6 to DCL-13-016, LTR-RAM-1-13-002 NP-Attachment, Revision 0, Justification for the Application of Technical Specifications Changes in WCAP-14333 and WCAP-15376 to the Tricon/Als Process Protection System at the Diablo Canyon PoweSafe Shutdown
Internal Flooding
Probabilistic Risk Assessment
Cyber Security
Large early release frequency
DCL-12-107, Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, 'Containment Spray and Cooling Systems,' TS 3.7.5, 'Auxiliary Feedwater (AFW) System,' TS 3.8.1, 'Ac.....1 November 2012Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, 'Containment Spray and Cooling Systems,' TS 3.7.5, 'Auxiliary Feedwater (AFW) System,' TS 3.8.1, 'Ac.....
DCL-12-057, Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 131 May 2012Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 1Unanalyzed Condition
DCL-11-097, License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown Earthquake20 October 2011License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown EarthquakeSafe Shutdown Earthquake
DCL-11-059, Diablo Canyon Units 1 & 2, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Sys1 June 2011Diablo Canyon Units 1 & 2, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution SysteSafe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Offsite Circuit
Power change
DCL-11-055, Supplement to License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs).21 April 2011Supplement to License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs).
DCL-11-018, License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs)17 February 2011License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs)Anticipated operational occurrence
Operability Assessment
Power Uprate
DCL-10-028, Diablo Canyon, Units 1 and 2, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating.11 March 2010Diablo Canyon, Units 1 and 2, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating.Safe Shutdown
Unanalyzed Condition
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Fuel cladding
Offsite Circuit
DCL-10-028, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating.11 March 2010Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating.Safe Shutdown
Unanalyzed Condition
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Fuel cladding
Offsite Circuit
DCL-10-018, License Amendment Request 10-01, Revision to Technical Specification 3.8.1, AC Sources - Operating.24 February 2010License Amendment Request 10-01, Revision to Technical Specification 3.8.1, AC Sources - Operating.Safe Shutdown
Boric Acid
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Incorporated by reference
Surveillance Frequency Control Program
Battery sizing
Offsite Circuit
Fire Protection Program
Power change
DCL-09-062, Emergency License Amendment Request 09-04 Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) for Unit 2 Cycle 15.3 September 2009Emergency License Amendment Request 09-04 Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) for Unit 2 Cycle 15.Loop seal
Anticipated operational occurrence
ML0919601773 July 2009License Amendment Request 09-02, Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, Operability Requirements and Actions for RCS Leakage Detection InstrumentationGrab sample
Safe Shutdown Earthquake
Enforcement Discretion
Surveillance Frequency Control Program
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
DCL-09-009, License Amendment Request 09-01 - Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, Deletion of the High Negative Rate Trip Function24 February 2009License Amendment Request 09-01 - Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, Deletion of the High Negative Rate Trip FunctionAnticipated operational occurrence
Probabilistic Risk Assessment
Rod Drop Event
DCL-08-100, Supplement to License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS)25 November 2008Supplement to License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS)Recently irradiated fuel
ML08241026230 October 2008Issuance of Amendment Nos. 200 and 201, Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk-Informed Initiative 5b)High winds
Shutdown Margin
High Radiation Area
Hydrostatic
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Recently irradiated fuel
Offsite Circuit
Backfit
Power change
DCL-07-097, License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)15 October 2007License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Large early release frequency
Battery sizing
Power Operated Valves
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
Power change
Unidentified leakage
Overspeed trip
DCL-07-075, Supplement to License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement, and Response to Request for Additional Information9 August 2007Supplement to License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement, and Response to Request for Additional InformationAnticipated operational occurrence
Affidavit
ML07137073326 June 2007Tech Spec Pages for Amendment Nos. 197 and 198 TS 5.5.16, Containment Leakage Rate Testing Program, for Consistency with 10 CFR 50.55a(g)(4)
ML07099007425 June 2007Units, 1 and 2, Tech Spec Page for Amendments 196 and 197 Administrative Changes to the Technical Specification 5.5.8, Inservice Testing Program.
ML07035005217 April 2007Tech Spec Pages for Amendment Nos. 195 and 196 TS 3.4.1 Reactor Coolant System Pressure, Temperature, & Flow Departure from Nucleate Boiling Limits & TS 5.6.5 Core Operating Limits Report.Shutdown Margin
Process Control Program
ML07044049421 March 2007Tech Spec Pages for Amendments 194 and 195 Regarding Steam Generator Tube Integrity Technical SpecificationsNondestructive Examination
Pressure Boundary Leakage
ML07019021419 January 2007Units, 1 and 2 - Tech Spec Pages for Amendments 192 and 193 Technical Specification 1.1 Definitions and Technical Specification 3.4.16 Reactor Coolant System Specific ActivityPressure Boundary Leakage
Power change
DCL-06-143, License Amendment Request 06-10 Revision to Technical Specification 5.5.8, Inservice Testing Program29 December 2006License Amendment Request 06-10 Revision to Technical Specification 5.5.8, Inservice Testing ProgramIncorporated by reference
Foreign Material Exclusion
DCL-06-136, License Amendment Request 06-05 Revision to Technical Specification 3.4.1, Reactor Coolant System Pressure, Temperature, and Flow Departure from Nucleate Boiling Limits, and Technical Specification 5.6.5, Core Operating....29 December 2006License Amendment Request 06-05 Revision to Technical Specification 3.4.1, Reactor Coolant System Pressure, Temperature, and Flow Departure from Nucleate Boiling Limits, and Technical Specification 5.6.5, Core Operating....Shutdown Margin
Anticipated operational occurrence
Process Control Program
Fuel cladding
DCL-06-142, License Amendment Request 06-09, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program (TSTF-343)29 December 2006License Amendment Request 06-09, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program (TSTF-343)
ML06355003120 December 2006Tech Spec Pages for Amendment 192 Regarding TS 5.6.5, Core Operating Limits Report.
DCL-06-129, Special Report 06-03 - 180 Day Report for Steam Generator Technical Specification Task Force 449, Thirteenth Refueling Outage17 November 2006Special Report 06-03 - 180 Day Report for Steam Generator Technical Specification Task Force 449, Thirteenth Refueling OutageBoric Acid
Nondestructive Examination
Finite Element Analysis
Foreign Material Exclusion
ML06319054015 November 2006Technical Specifications, Issuance of Exigent Amendment No. 190 Revision to TS Section 3.8.4, DC Sources - Operating to Extend the Completion Time to Restore an Inoperable Station Battery