ML070350052

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment Nos. 195 and 196 TS 3.4.1 Reactor Coolant System Pressure, Temperature, & Flow Departure from Nucleate Boiling Limits & TS 5.6.5 Core Operating Limits Report.
ML070350052
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/17/2007
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Wang A, NRR/DORL/LPL4, 301-415-1445
Shared Package
ML071140459 List:
References
TAC MD3979, TAC MD3980
Download: ML070350052 (3)


Text

RCS Pressure, Temperature, and Flow DNB Limits 3.4.1 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits LCO 3.4.1 RCS DNB parameters for pressurizer pressure, RCS average temperature, and RCS total flow rate shall be within the limits specified below:

a. Pressurizer pressure is greater than or equal to the limit specified in the COLR;
b. RCS average temperature is less than or equal to the limit specified in the COLR; and
c. RCS total flow rate within limits shown on Table 3.4.1-1 for Unit 1 and Table 3.4.1-2 for Unit 2.

APPLICABILITY: MODES 1.


NOTE ---------------------- .........------------

Pressurizer pressure limit does not apply during:

a. THERMAL POWER ramp > 5% RTP per minute; or
b. THERMAL POWER step > 10% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more RCS DNB A.1 Restore RCS DNB 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> parameters not within limits, parameter(s) to within limit.

B. Required Action and B.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.1.1 Verify pressurizer pressure is greater than or equal to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> the limit specified in the COLR.

SR 3.4.1.2 Verify RCS average temperature is less than or equal 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to the limit specified in the COLR.

SR 3.4.1.3 Verify RCS total flow rate is within limits. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.1.4 Verify measured RCS total flow rate is within limits. 24 months 3.4-1 Unit 1 - Amendment No. 4-N,, 195 Unit 2 - Amendment No. 4-5, 196

Reporting Requirements 5.6 5.6 Reporting Requirements (continued) 5.6.3 Radioactive Effluent Release Report


NO TE --------------------------------------------------------

A single submittal may be made for a multiple unit station. The submittal shall combine sections common to all units at the station; however, for units with separate radwaste systems, the submittal shall specify the releases of radioactive material from each unit.

The Radioactive Effluent Release Report covering the operation of the unit during the previous year shall be submitted prior to May 1 of each year in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be consistent with the objectives outlined in the ODCM and Process Control Program and in conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV.B.1.

5.6.4 Not Used 5.6.5 CORE OPERATING LIMITS REPORT (COLR)

a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
1. Shutdown Bank Insertion Limits for Specification 3.1.5,
2. Control Bank Insertion Limits for Specification 3.1.6,
3. Axial Flux Difference for Specification 3.2.3,
4. Heat Flux Hot Channel Factor, K(Z) and W(Z) - FQ(z) (F0 RTP Specification 3.2.1),
5. RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - F*H (FRTPAH and PFAH for Specification 3.2.2),
6. SHUTDOWN MARGIN values in'Specifications 3.1.1, 3.1.4, 3.1.5, 3.1.6, and 3.1.8,
7. Moderator Temperature Coefficient limits in Specification 3.1.3,
8. Refueling Boron Concentration limits in Specification 3.9.1, and
9. RCS pressure and temperature DNB limits in Specification 3.4.1.

(continued) 5.0-26 Unit 1 - Amendment No. 435, 480, 195 Unit 2 - Amendment No. 4-35, 4-82, 196

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)

b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
1. WCAP-10216-P-A, Relaxation of Constant Axial Offset Control F 0

Surveillance Technical Specification, (Westinghouse Proprietary),

2. WCAP-9272-P-A, Westinghouse Reload Safety Evaluation Methodology, (Westinghouse Proprietary),
3. WCAP-8385, Power Distribution Control and Load Following Procedures, (Westinghouse Proprietary),
4. WCAP-10054-P-A, Westinghouse Small Break LOCA ECCS Evaluation Model Using the NOTRUMP Code, August 1985 (Westinghouse Proprietary),
5. WCAP-10054-P-A, Addendum 2, Revision 1, Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection Into the Broken Loop and COSI Condensation Model, July 1997 (Westinghouse Proprietary),
6. WCAP-1 2945-P-A, Westinghouse Code Qualification Document for Best-Estimate Loss of Coolant Analysis, June 1996 (Westinghouse Proprietary),
7. WCAP-12945-P-A, Addendum 1-A, Revision 0, "Method for Satisfying 10 CFR 50.46 Reanalysis Requirements for Best Estimate LOCA Evaluation Models," December 2004. (Westinghouse Proprietary) (Unit 1 Only),
8. WCAP-16009-P-A, Revision 0, Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM), January 2005. (Westinghouse Proprietary)

(Unit 2 Only),

9. WCAP-8567-P-A, "Improved Thermal Design Procedure," and
10. WCAP-11596-P-A, "Qualification of the PHOENIX-P/ANC Nuclear Design System for Pressurized Water Reactor Cores."
c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.

(continued) 5.0-27 Unit 1 - Amendment No. 4-, 4-36, 4-94, 1 95 Unit 2 - Amendment No. 43-, 436, 1-92, 196