MONTHYEARML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 ML20198L4671998-01-0202 January 1998 SER Approving Request for Relief VRR-4B to Inservice Testing Program Wisconsin Electric Power Co,Point Beach Nuclear Plant,Units 1 & 2 ML20197J9341997-12-12012 December 1997 Safety Evaluation Accepting Licensee Request for Relief from Performing Inservice Volmetric Exam of Inaccessible Portions of RPV Lower Shell to Lower Head Ring Weld During 10-yr ISI Interval of Plant,Unit 2 ML20137U4991997-04-10010 April 1997 Safety Evaluation Accepting Proposed Alternatives Contained in Requests for Relief RR-1-17 & RR-2-21 ML20129G6901996-10-0303 October 1996 SER Accepting Request for Relief from ASME Code Repair Requirements for ASME Code Class Three Piping at Plant ML20062J4991993-10-28028 October 1993 Safety Evaluation Granting IST Relief Requests Per 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(f)(4)(iv) ML20062F1361990-09-25025 September 1990 SE Accepting Util Responses to Generic Ltr 83-28,Item 1.2, Post-Trip Review - Data & Info Capability ML20248A0101989-09-18018 September 1989 Safety Evaluation Re Containment Liner Leak Chase Channel Venting.Concurs W/Licensee That Plant Does Not Need to Vent Containment Liner Weld Leak Chase Channels During Test ML20246H0121989-07-0707 July 1989 Safety Evaluation Accepting Util 880325 & 1117 Responses to NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes ML20245B0311989-06-14014 June 1989 Safety Evaluation Supporting Util Response to Generic Ltr 83-28,Item 4.5.3 Re on-line Functional Testing of Reactor Trip Sys.Existing Intervals for on-line Functional Testing Consistent W/High Reactor Trip Sys Availability ML20207E4191988-08-0404 August 1988 Safety Evaluation Supporting Compliance W/Atws Rule 10CFR50.62, Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML20151R6771988-08-0202 August 1988 Safety Evaluation Granting Request for Relief from ASME Code,Section XI Evaluation Requirements ML20151N2191988-07-27027 July 1988 Safety Evaluation Supporting Util Proposal Re Design of Switchgear Room,Per Sections Iii.G & Iii.L of App R to 10CFR50 ML20150C1311988-06-21021 June 1988 Safety Evaluation Accepting Responses to Generic Ltr 83-28, Item 2.1,confirming That Program Exists for Identifying, Classifying & Treating Components Required for Performance of Reactor Trip Function as safety-related ML20154H5791988-05-12012 May 1988 Safety Evaluation Supporting Conclusions That Rev 1 to Offsite Dose Calculation Manual (ODCM) Uses Methods Consistent W/Staff Requirements,However Some Discrepancies Identified.Odcm & Environ Manual Should Be Revised ML20148H4551988-03-24024 March 1988 Safety Evaluation Accepting Util 840405 Response to Generic Ltr 83-28,Item 2.1,(Part 2) Re Vendor Interface Programs & Reactor Trip Sys Components ML20235K9241987-07-0909 July 1987 Safety Evaluation Re Reactor Pressure Vessel Flaw.Flaw Conditionally Acceptable Per Subarticle IWB-3123 of Section XI of ASME Code & Therefore Requires Augmented Inservice Insps Based on 10CFR50.55(g)(4) ML20213G5801987-05-0707 May 1987 Safety Evaluation Re Util 861027 Request for Relief from Exam Requirements of Section XI of ASME Boiler & Pressure Vessel Code for Shell & Nozzle Welds in Regenerative Hxs. Request Granted ML20206K6011987-04-10010 April 1987 SER Supporting Util 860513 Proposed Replacement of Hydraulic Snubbers W/Energy Absorbers on Main Steam Bypass Line ML20210P2781987-02-0505 February 1987 Safety Evaluation Supporting Util 831107 & 860411 Responses to Generic Ltr 83-28,Item 4.5.2 Re Reactor Trip Sys Reliability on-line Testing.Plant Designed to Permit on-line Functional Testing of Diverse Trip Features of Breakers ML20214U6081986-11-26026 November 1986 Safety Evaluation Supporting Util 850516 Capsule T Summary Rept Re Use of Reactor Vessel Pressure Temp Limits Specified in Figures 15.3.1-1 & 15.3.1-2 of Tech Specs.Temp Limits Valid & May Continue to Be Used ML20206S7091986-09-16016 September 1986 Safety Evaluation on Util 850426 Response to Open Items Re Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys (Afws). Reasonable Assurance Exists That Afws Will Perform Required Safety Function Following SSE ML20214L9311986-09-0404 September 1986 Corrected Safety Evaluation Re Projected Values of Matl Properties for Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.Licensee Projections Acceptable ML20207D6781986-07-11011 July 1986 Safety Evaluation Accepting Util Responses to Generic Ltr 82-33 Re post-accident Monitoring Instrumentation Compliance W/Guidelines of Reg Guide 1.97,Rev 2,subj to Listed Condition.Portions of Rev 1 to EGG-EA-6771 Encl ML20138N7801985-10-31031 October 1985 Safety Evaluation Granting Util 840706 Relief Requests for Second 10-yr Inservice Insp Interval.Review of Requests for Relief from ASME Code Section XI Requirements Summarized in Encl Tables ML20134A4821985-10-24024 October 1985 Safety Evaluation Supporting Util Response to Generic Ltr 83-28,Items 3.1.1,3.1.2,4.1 & 4.5.1 Re post-maint Testing (Reactor Trip Sys Components) & Reactor Trip Sys Reliability.Programs Outlined in Acceptable ML20134A6051985-10-22022 October 1985 Safety Evaluation Re Util 831107 & 850910 Responses to Generic Ltr 83-28,Item 1.1, Post-Trip Review Program Description & Procedures. Program & Procedures Acceptable ML20138H1721985-10-18018 October 1985 Safety Evaluation Accepting Util 831107 Response to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing ML20133G4171985-07-29029 July 1985 Safety Evaluation Accepting Util 831108 Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review.Response to Listed Deficiencies,Including Development of Systematic Safety Assessment Program for Unscheduled Reactor Trips Required ML20129H7871985-05-16016 May 1985 Safety Evaluation Supporting Licensee Response to Generic Ltr 83-28,Items 4.2.1 & 4.2.2 Re Reactor Trip Sys Reliability,Provided Corrective Action Taken If Higher than Normal Valves Observed in Trip Force & Response Time Values ML20205H2171984-09-10010 September 1984 Supplemental Safety Evaluation Re Util 820820 & 860113 Requests for Relief from Inservice Insp Requirements. Volumetric Exam Acceptable Method for Detecting O.D. Initiated Flaws.Relief from Surface Exams Should Be Granted ML20204F5381983-04-25025 April 1983 Safety Evaluation of Util Preferred Ac Power Sys Conformance GDC 17.Proximity of Low Voltage Transformers Does Not Fully Meet GDC 17 Requirements for Physical Separation,But Deluge Sprinkler Sys Adequate 1999-09-15
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
1
- k, UNITED STATES
! p, NUCLEAR REGULATORY COMMISSION b :p WASHINGTON, D. C. 20555
\...../ .
SAFETY EVALUATION WISCONSIN ELECTRIC POWER COMPANY POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 DOCKET N05. 50-266 AND 50-301 REACTOR TRIP SYSTEM RELIABILITY ITEMS 4.2.1 AND 4.2.2 0F GENERIC LtIIER 83-28
- 1. INTRODUCTION I On July Letter GL(8,)1983, 83-28. Thistheletter Nuclear Regulatory addressed Comission (NRC) intermediate-term issued actions to beGeneric taken by licensees and applicants aimed at assuring that a comprehensive program of preventive maintenance and surveillance testing is implemented for the reactor trip breakers (RTBs) in pressurized water reactors. In particular, Item 4.2 of the letter required the licensees and applicants to submit a description of their preventive maintenance and surveillance program to ensure reliable rea,ctor trip breaker operation. The description of the submitted program was to include the following:
GL, Item 4.2.1 A planned program of periodic maintenance, including lubrication, housekeeping, and other items recommended by the equipment supplier.
GL, Item 4.2.2 Trending of parameters affecting operation and measured during testing to forecast degradation of operation.
Wisconsin Electric Power Company, the licensee for Point Beach Nuclear Plant, Unit Nos. I and 2, submitted responses to the Generic Letter on November 7, 1983 and December 28, 1984 This report presents an evaluation of the adequacy of those responses and of the licensee's preventive maintenance and surveillance programs for RTBs.
- 2. EVALUATION CRITERIA 2.1 Periodic Maintenance Program The primary source for periodic maintenance program criteria is Westing-house Maintenance Program for DB-50 Reactor Trip Switchgear, Rev. O. This document is the breaker manufacturer's recommended maintenance program for the DB-50 breaker and provides specific direction with regard to schedule, inspection and testing, cleaning, lubrication, corrective maintenance and record keeping. The document was reviewed to identify those items that contribute to breaker trip reliability consistent with the generic letter.
Those items identified for maintenance at six month intervals that should be included in the licensee's RTB maintenance program are:
- 1. Verification of trip bar freedom
- 2. Verification of operating mechanism alignment and freedom
- 3. Retaining ring verification DR 6
- 4. Verification of nut and bolt tightness
- 5. Verification of pole bases physical condition -
- 6. Verification of arcing and main contacts physical condition
- 7. Verification of insulating link's physical condition
- 8. Verification of wiring insulation and tennination physical condition
- 9. Verification of arc chute physical condition
- 10. Verification of breaker cleanliness
- 11. Undervoltage Trip Attachment (UVTA) dropout voltage test and lubrication
- 12. Shunt Trip Attachment (STA) operation verification
- 13. Verification of operation of auxiliary switches
- 14. Inspection of positioning lever condition
- 15. Functional test of the breaker prior to returning it to service.
The licensee's RTB periodic maintenance should also include, on a refueling interval basis:
- 16. Verification of cell interlock operation
- 17. Examination and cleaning of breaker enclosure
- 18. Measurement of trip force required
- 19. Functional test of the breaker prior to returning it to service
- 20. Breaker response time for undervoltage trip.
. All of the items listed above are reconenended by the manufacturer except Item 20. This is the breaker trip response time measurement which is implied by the IEEE Standard 279-1971.
2.2 Trending of Parameters Generic Letter Item 4.2.2 specifies that the licensee's preventative maintenance and surveillance program is to include trending of parameters affecting operation and measured during testing to forecast degradation of operation. The parameters measured during the maintenance program described
. - -above which are applicable for trending are undervoltage trip attachment
. dropout voltage, trip force, and breaker response time for undervoltage trip. The staff position is that the above three parameters in addition i . to the breaker insulation resistance are acceptable and reconsnended trending parameters to forecast breaker operation degradation or failure. If sub-
- sequent experience indicates that any of these parameters is not useful
- as a tool to anticipate failures or degradation, the licensee may, with justification and NRC approval, elect to remove that parameter from those to be tracked.
- 3. EVALUATION l
3.1 Evaluation of the Licensee Position on Item 4.2.1 ;
l In the licensee's December 28, 1984 response to the staff's request for
. additional information (RAI), the licensee states that his existing ,
periodic maintenance program includes all the maintenance items at the '
l l
specified intervals listed, except the cell interlock operation. !
Revision 2 of the licensee's Routine Maintenance Procedure (RMP26) , l l will include this item. The licensee also states that the performance i of all items of RMP 26 is on a refueling interval basis and that his experience with the reactor trip and bypass breakers has demonstrated that these devices are very reliable. Moreover, the number of breaker cycles is not expected to exceed 40 during the interval of operation between refueling outages.
1 L The Westinghouse Maintenance Program for DB-50 Reactor Trip Switchgear, l l Revision 0, states that "the semi-annual activities might be extended to
! 9 to 12 months if experience shows this to be sufficient provided that 200 breaker cycles are not exceeded during this interval."
Based on the above statements, the staff finds that the licensee's position on the scope and frequency of RTB maintenance is acceptable provided that the interval does not exceed 12 months.
3.2 Evaluation of the Licensee Position on Item 4.2.2 The licensee indicates that the undervoltage trip attachment dropout voltage is trended as recommended by Westinghouse. However, trip force, breaker response time for undervoltage trip, and breaker insulation resis-tance are not trended. Trip force and breaker response time for under-voltage trip are recorded and compared by the licensee to the maximum
, acceptable values of 31 ounces and 10 cycles, respectively.
The licensee justifies not trending the trip force and breaker response d
time for undervoltage trip by stating that he records these values and compares them to the maximum acceptable values of 31 ounces and 10 cycles,
! respectively. If the recorded values are significantly in excess of those
- norrelly experienced and recorded, the licensee's procedures call for corrective action. The values for breaker trip force and breaker response time at which the licensee has indicated corrective action would be per-formed are well below the maximum acceptable values and provide assurance i that these values would not be exceeded. In addition, the licensee justifies not trending the breaker insulation resistance by stating that the breakers are cleaned, inspected for insulation cracks, and operated at less than one-half of rated voltage.
i The staff position is that trending the four parameters with respect to time can provide useful information to forecast the degradation of opera-bility of the breaker, t
4 4
m-mw w .-, - , ,e. g ,,,,-n-nw----,----n-,a- ,w,-,-m- ,,v, .w.nn,.,-y,,,,_,_ _ _ , , -_ __,,,,..,w,_-m, w,,v,-, mm. - , - , . - - - -
l The licensee does not trend the trip force and the response time. How-ever, the licensee does measure and record these parameters, .which is acceptable to the staff. Although it would be better if these parameters were trended, the licensee's program is acceptable, and provides assurance that corrective action will be taken when the measured values approach the manufacturer's recomended maximum values.
With regard to trending the breaker insulation resistance, the licensee's l position of neither measuring nor trending is acceptable because the breakers are operated at less than one-half of the rated voltage and are routinely inspected for insulation cracks and other signs of insulation deterioration.
- 4. CONCLUSIONS Based on the review of the licensee responses, the staff accepts the ;
licensee position on Items 4.2.1 and 4.2.2 of the generic letter, provided: '
- 1. The licensee continues to record the trip force and the response time values, comparing them with the manufacturer's recommendations and taking corrective action if unusually higher than normal values are observed; and
- 2. The maintenance interval does not exceed 12 months.
Date: May 16, 1985 Principal Contributor:
N. Romney, DE T. Colburn 4
~
Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Mr. Bruce Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, DC 20036 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Cho1rnan Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator Nuclear Regulatory Commission, Region III Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 U.S. NRC Resident Inspector's Office 6612 Nuclear Road Two Rivers, Wisconsin 54241