MONTHYEARML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 ML20198L4671998-01-0202 January 1998 SER Approving Request for Relief VRR-4B to Inservice Testing Program Wisconsin Electric Power Co,Point Beach Nuclear Plant,Units 1 & 2 ML20197J9341997-12-12012 December 1997 Safety Evaluation Accepting Licensee Request for Relief from Performing Inservice Volmetric Exam of Inaccessible Portions of RPV Lower Shell to Lower Head Ring Weld During 10-yr ISI Interval of Plant,Unit 2 ML20137U4991997-04-10010 April 1997 Safety Evaluation Accepting Proposed Alternatives Contained in Requests for Relief RR-1-17 & RR-2-21 ML20129G6901996-10-0303 October 1996 SER Accepting Request for Relief from ASME Code Repair Requirements for ASME Code Class Three Piping at Plant ML20062J4991993-10-28028 October 1993 Safety Evaluation Granting IST Relief Requests Per 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(f)(4)(iv) ML20062F1361990-09-25025 September 1990 SE Accepting Util Responses to Generic Ltr 83-28,Item 1.2, Post-Trip Review - Data & Info Capability ML20248A0101989-09-18018 September 1989 Safety Evaluation Re Containment Liner Leak Chase Channel Venting.Concurs W/Licensee That Plant Does Not Need to Vent Containment Liner Weld Leak Chase Channels During Test ML20246H0121989-07-0707 July 1989 Safety Evaluation Accepting Util 880325 & 1117 Responses to NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes ML20245B0311989-06-14014 June 1989 Safety Evaluation Supporting Util Response to Generic Ltr 83-28,Item 4.5.3 Re on-line Functional Testing of Reactor Trip Sys.Existing Intervals for on-line Functional Testing Consistent W/High Reactor Trip Sys Availability ML20207E4191988-08-0404 August 1988 Safety Evaluation Supporting Compliance W/Atws Rule 10CFR50.62, Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML20151R6771988-08-0202 August 1988 Safety Evaluation Granting Request for Relief from ASME Code,Section XI Evaluation Requirements ML20151N2191988-07-27027 July 1988 Safety Evaluation Supporting Util Proposal Re Design of Switchgear Room,Per Sections Iii.G & Iii.L of App R to 10CFR50 ML20150C1311988-06-21021 June 1988 Safety Evaluation Accepting Responses to Generic Ltr 83-28, Item 2.1,confirming That Program Exists for Identifying, Classifying & Treating Components Required for Performance of Reactor Trip Function as safety-related ML20154H5791988-05-12012 May 1988 Safety Evaluation Supporting Conclusions That Rev 1 to Offsite Dose Calculation Manual (ODCM) Uses Methods Consistent W/Staff Requirements,However Some Discrepancies Identified.Odcm & Environ Manual Should Be Revised ML20148H4551988-03-24024 March 1988 Safety Evaluation Accepting Util 840405 Response to Generic Ltr 83-28,Item 2.1,(Part 2) Re Vendor Interface Programs & Reactor Trip Sys Components ML20235K9241987-07-0909 July 1987 Safety Evaluation Re Reactor Pressure Vessel Flaw.Flaw Conditionally Acceptable Per Subarticle IWB-3123 of Section XI of ASME Code & Therefore Requires Augmented Inservice Insps Based on 10CFR50.55(g)(4) ML20213G5801987-05-0707 May 1987 Safety Evaluation Re Util 861027 Request for Relief from Exam Requirements of Section XI of ASME Boiler & Pressure Vessel Code for Shell & Nozzle Welds in Regenerative Hxs. Request Granted ML20206K6011987-04-10010 April 1987 SER Supporting Util 860513 Proposed Replacement of Hydraulic Snubbers W/Energy Absorbers on Main Steam Bypass Line ML20210P2781987-02-0505 February 1987 Safety Evaluation Supporting Util 831107 & 860411 Responses to Generic Ltr 83-28,Item 4.5.2 Re Reactor Trip Sys Reliability on-line Testing.Plant Designed to Permit on-line Functional Testing of Diverse Trip Features of Breakers ML20214U6081986-11-26026 November 1986 Safety Evaluation Supporting Util 850516 Capsule T Summary Rept Re Use of Reactor Vessel Pressure Temp Limits Specified in Figures 15.3.1-1 & 15.3.1-2 of Tech Specs.Temp Limits Valid & May Continue to Be Used ML20206S7091986-09-16016 September 1986 Safety Evaluation on Util 850426 Response to Open Items Re Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys (Afws). Reasonable Assurance Exists That Afws Will Perform Required Safety Function Following SSE ML20214L9311986-09-0404 September 1986 Corrected Safety Evaluation Re Projected Values of Matl Properties for Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.Licensee Projections Acceptable ML20207D6781986-07-11011 July 1986 Safety Evaluation Accepting Util Responses to Generic Ltr 82-33 Re post-accident Monitoring Instrumentation Compliance W/Guidelines of Reg Guide 1.97,Rev 2,subj to Listed Condition.Portions of Rev 1 to EGG-EA-6771 Encl ML20138N7801985-10-31031 October 1985 Safety Evaluation Granting Util 840706 Relief Requests for Second 10-yr Inservice Insp Interval.Review of Requests for Relief from ASME Code Section XI Requirements Summarized in Encl Tables ML20134A4821985-10-24024 October 1985 Safety Evaluation Supporting Util Response to Generic Ltr 83-28,Items 3.1.1,3.1.2,4.1 & 4.5.1 Re post-maint Testing (Reactor Trip Sys Components) & Reactor Trip Sys Reliability.Programs Outlined in Acceptable ML20134A6051985-10-22022 October 1985 Safety Evaluation Re Util 831107 & 850910 Responses to Generic Ltr 83-28,Item 1.1, Post-Trip Review Program Description & Procedures. Program & Procedures Acceptable ML20138H1721985-10-18018 October 1985 Safety Evaluation Accepting Util 831107 Response to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing ML20133G4171985-07-29029 July 1985 Safety Evaluation Accepting Util 831108 Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review.Response to Listed Deficiencies,Including Development of Systematic Safety Assessment Program for Unscheduled Reactor Trips Required ML20129H7871985-05-16016 May 1985 Safety Evaluation Supporting Licensee Response to Generic Ltr 83-28,Items 4.2.1 & 4.2.2 Re Reactor Trip Sys Reliability,Provided Corrective Action Taken If Higher than Normal Valves Observed in Trip Force & Response Time Values ML20205H2171984-09-10010 September 1984 Supplemental Safety Evaluation Re Util 820820 & 860113 Requests for Relief from Inservice Insp Requirements. Volumetric Exam Acceptable Method for Detecting O.D. Initiated Flaws.Relief from Surface Exams Should Be Granted ML20204F5381983-04-25025 April 1983 Safety Evaluation of Util Preferred Ac Power Sys Conformance GDC 17.Proximity of Low Voltage Transformers Does Not Fully Meet GDC 17 Requirements for Physical Separation,But Deluge Sprinkler Sys Adequate 1999-09-15
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
- _ _ _ _ - _ _ _ _ _ - - _ - _
\ 'g UNITED STATES g g NUCLEAR REGULATORY CCMMISSION 5 j WASHINGTOr., D. C. 20555
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FELAlED TO CLOSEOUT OF BULIEilN 88-02 FACILITY OPERATING LICE!Gt NO. DPR-27 WISCONSIN ELECTRIC POWER COMPANY POIhl BEACH NUCLEAR PLANT, UhlT NO. 2 DOCKET NO. 50-301 INTRODUCTION By letters dated March 25 and November 17, 1988, Wisconsin Electric Power Company (the licensee) submitted its response to NRC Bulletin 88-02, " Rapidly Propagating Fatigue Cracks in Steam Generator Tubes." Bulletin 88-02 requested that licensees.for plants with Westinghouse steam generators employing carbon steel support plates take certain actions (specified in the bulletin) to ninimize the potential for a steam generator tube rupture event caused by a rapidly propagating fatigue crack such as occurred at North Anna Unit 1 on July 15,1987.
DISCUSSION Point Beach Unit I steam generators were replaced in 1983 with a design that included stainless steel tube support plates. As a result, Bulletin 88-02 does not apply to Point Beach Unit 1. The licensee reports that the Point Beach Unit 2 steam generators exhibit evidence of denting at the uppermost support plates. Accordingly, items C.1 and C.2 of the bulletin are applicable to Point Beach Unit 2.
In accordance with item C.1 of the bulletin, the licensee has implemented an enhanced primary-to-secondary leak rate monitoring program. This enhanced leak rate monitoring program is an interim compensatory measure pending comple-tion of the actions requested in iten C.2 of the bulletin and NRC staff review a d approval of these actions. This prograre is intended to ensure the leakage from a rapidly propagating fatigue crack will be detected and monitored in a timely manner to ensure that the plant is shut down before rupture ocurs.
The licensee has implemented the generic program developed by Westinghouse to resolve item C.2 of the bulletin. The licensee's implementation of this i program was initially described in Westinghouse reports WCAP-11666 (proprietary version) and WCAP-11667 (non-proprietary version), " Point Beach Unit 2, Evalua-tion for Tube Vibration Induced fatigue." These reports provide a detailed description of the analyses which were conducted to estrblish the susceptibility of the Point Beach Unit 2 steam generator tubes to rapid 4 propagating fatigue cracks and to identify any needed corrective actions.
The Point Beach Unit 2 analyses conservatively assumed that all unsupported tubes were dented at the uppermost support plate. In addition, the stress ratio and fatigue estimates were based on the assumption of the full mean
'~
8907140299 890707 PDR ADOCK 05000301.
q PNU.'
' , ' . .f '
~g UNITED STATES ri --
NUCLEAR REGULATORY COMMISSION j' .- ey. 'n WASHINGTON, D. C. 20555
/ .
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELAlED TO CLOSE0VT OF BULLETIN 88-02 FACILITY OPERATING LICENSE NO. DPR-27 WISCONSIN ELECTRIC POWER COMPANY POINI BEACH NUCLEAR PLANT, UHll NO. 2 DoctET NO. 50-301 INTRODUCTION j By letters dated March 25 and November 17, 1988, Wisconsin Electric Power Company (the licensee) submitted its response to NRC Bulletin 88-02, " Rapidly Propagating Fatigue Cracks in Steam Generator Tubes." Sulletin 88-02 requested that licensees for plants with Westinghouse steam generators employing carbon steel support plates take certain actions (specified in the bulletin) to ninimize the potential for a steam generator tube rupture event caused by a rapidly propagating fatigue crack such as occurred at North Anna Unit 1 on 1 July 15,1987.
DISCUSSICN Point Beach Unit I steam generators were replaced in 1983 with a design that included stainless steel tube support plates. As a result, Bulletin 88-02 does not apply to Point Beath Unit 1. The licensee reports that the Point Beach Unit 2. steam generators exhibit evidence of denting at the uppermost support plates. Accordingly, items C.1 and C.2 of the bulletin are applicable to Point Beach Unit 2.
In accordance with item C.1 of the bulletin, the licensee has implemented an enhanced primary-to-secondary leak rate n.onitoring program. This enhanced leak rate monitoring program is an interim compensatory measure pending comple-tion of the actions requested in iten C.2 of the bt11etin and NRC staff review and approval of'these actions. This program is intended to ensure the leakage from a rapidly propagating fatigue crack will be detected and monitored in a timely manner to ensure that the plant is shut down before rupture occurs.
The licensee has implemented the generic program developed by Westinghouse to resolve item C.2 of the bulletin. The licensee's implementation of this program was initially described in Westinghouse reports WCAP-11666 (proprietary version) and WCAP-11667 (non-proprietary version), " Point Beach Unit 2, Evalua-tion for Tube Vibration Induced fatigue." These reports provide a detailed description of the analyses which were conducted to establish the susceptibility of the Point Beach Unit 2 steam generator tubes to rapidly propagating fatigue cracks and to identify any needed corrective actions.
The Point Beach Unit 2 analyses conservatively assumed that all unsupported tubes were dented at the uppermost support plate. In addition, the stress ratio and fatigue estimates were based on the assumption of the full mean l 8907140299 890707 .
l PDR ADOCK 05000301' q PNU
d J
stress effect (i.e., yield stress). A fluid-elastic stability ratio analysis was performed with the FASTVIB computer code using thermal-hydraulic input from the 3-D ATH0S code for a reference operating cycle (i.e., cycle 13). The stability ratio estimates were adjusted to reflect flow peaking effects associated with actual antivibration bar (AVB) insertion patterns in the Point Beach Unit 2 steam generators. The flow peaking factors were estimated on the basis of preliminary data from Westinghouse air model tests.
~
The Westinghouse generic program has undergone a number of refinements since issuance of WCAP-11666 and WCAP-11667 for Point Beach Unit 2. These refinements have included more accurate methods for determining AVB insertion depths, con-sideration of revised and additional data from air model tests concerning ,
flow peaking effects associated with specific AVB insertion depth configurations, !
and consideration of uncertainties associated with AVB insertion depth estimates ;
and air model tests data (
Reference:
Westinghouse report WCAP-11799 (proprietary l version) and WCAP-11800 (non-proprietary version), " Beaver Valley Units 1 and 2 -
Evaluation for Tube Vibration Included Fatigue," April 1988, NRC Accession No. 8805160073). Generic aspects of the refined Westinghouse program in WCAP-11799 were reviewed by the staff and found to be an acceptable approach for resolving item C.2 of the bulletin (
Reference:
Memorandum dated August 19, 1988; C. Y. Cheng to D. Neighbors, enclosing staff's safety evaluation of the Westinghouse generic program).
During a phone conversation on October 25, 1988, the staff requested that the licensee critically review the Point Beach analysis in WCAP-11666 in light of the new and revised information and data contained in more recent Westinghouse reports (e.g., WCAP-11799). As part of this request, the licensee was requested to respond to several questions concerning AVB measurement uncertainties and flow peaking factors. Formal documentation of this request wcs provided to the licensee by letter dated November 14, 1988.
The licensee provided a detailed response to the staff's request by letter dated November 17, 1988, transmitting WCAP-12043 (non-proprietary version)g ,
WCAP-12042
" Response (proprietary to NRC Questions." The response version) and included a refined assessment of AVB insertion depths including consideration of" measurement errors. Flow peaking factor assumptions were updated to reflect the revised AVB assessment and the. latest Westinghouse flow peaking data.
Stability ratio and stress ratio estimates were updated accordingly and compared to the westinghouse stability ratio and stress ratic acceptance criteria which have been previously reviewed and approved by the NRC staff (see above mentioned NRC staff memorandum dated August 19,1988).
The updated analyses demonstrate that all unsupported tubes in the Point Beach Unit 2 steam generators are well within the stability ratio and stress ratio !
acceptance criteria, and thus will not be subject to fatigue crack initiation over the projected lifetime of the plant. Thus, the licensee has concluded that all tubes in the Point Beach Unit 2 steam generators are acceptable for continued service and that no hardware modifications, preventive tube plugging, or other measures are necessary to preclude fatigue crack initiation.
~
J CONCLUSION The licensee's analyses fully resolve the issue identified in Bulletin 88-02 and are acceptable. These analyses indicate that there is reasonable assurance that rapidly propagating fatigue cracks of the type which occurred at North Anna Unit I should not occur at Point Beach Unit 2.
These findings are subject to the development of administrative controls by the licensee to ensure that updated stress ratio and fatigue usage calculations are perforned in the event of any significant changes to the steam generator operating parameters (e.g., steam flow and pressure, circulation ratio) that are nonconservative relative to the reference parameters assumed in the licensee's analyses.
Based on the satisfactory resolution of item C.2 of Bulletin 88-02, the licensee may, at its option, terminate its commitment to the enhanced leak rate monitoring program described in its November 11 and November 20, 1987 and March 25, 1988 submittals. Nevertheless, the staff encourages the licensee to review its leak rate monitoring procedures to ensure the continued effectiveness of these procedures for the timely detection, monitoring, and trending of rapidly increasing leak rates.
Principal Contributor: E. Murphy Dated: July 7, 1989
- - - _ -___ - ____-__ _-___--_