ML20054J900
From kanterella
ML20054J900 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 06/30/1982 |
From: | WESTERN CANADA HYDRAULIC LABORATORIES, LTD. |
To: | |
Shared Package | |
ML20054J898 | List: |
References | |
13050, NUDOCS 8206300181 | |
Download: ML20054J900 (100) | |
Similar Documents at Waterford | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217K9011999-10-18018 October 1999
[Table view]Proposed Tech Specs 3.6.2.2 Loc,Allowing Plant to Operate with Two Independent Trains of Containment Cooling, Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20211F5501999-08-24024 August 1999 Proposed Tech Specs Page Xviii, Index Administrative Controls, Originally Submitted with TS Change Request NPF-38-220 ML20211F3701999-08-24024 August 1999 Proposed Tech Specs,Revising Efas,Originally Submitted on 980702 as TS Change Request NPF-38-207 ML20210M9681999-08-0404 August 1999 Existing & Proposed marked-up TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One LPSI Train Inoperable & AOT of 72 Hours Imposed for Other Conditions ML20210M9861999-08-0404 August 1999 Existing & Proposed TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One HPSI Train Inoperable & TS 3.5.3, Changing end-state to Hot Shutdown with at Least One Operable Shutdown ML20210H1771999-07-29029 July 1999 Proposed Tech Specs 3.8.1.1 Re EDG AOT Increase from 72 H to Ten Days ML20210H2371999-07-29029 July 1999 Proposed Tech Specs 3.6.2.1 Extending Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3411999-07-19019 July 1999 Proposed Tech Specs 4.5.2.f.2,increasing Performance Requirement for LPSI Pumps ML20210D0521999-07-15015 July 1999 Proposed Tech Specs Creating New TS for Feedwater Isolation Valves ML20210D1071999-07-15015 July 1999 Proposed Tech Specs Adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20209H3191999-07-15015 July 1999 Proposed Tech Specs Pages Modifying TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 EFPY ML20209D4091999-07-0707 July 1999 Proposed Tech Specs,Revising Actions 19 & 20 for Table 3.3-3 for Functional Unit 7 Emergency Feedwater, Items B & C,Per 980702 TS Change Request NPF-38-207 ML20196E9971999-05-24024 May 1999 Rev 3 to NTP-203, Emergency Plan Training ML20195B1811999-05-20020 May 1999 Proposed Tech Specs Changes to Bases B 3/4.3.1 & 3/4.3.2, B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20204H2591999-03-16016 March 1999 Rev 0 to STD-100-237, Procedure for Modification of RCS Pressure Boundary for Installation of Mechanical Nozzle Seal Assemblies (Mnsa) for Waterford Nuclear Generating Station Unit 3 ML20204H2511999-03-16016 March 1999 Rev 1 to C-NOME-EP-0189, Engineering Procedure for Installation of Mechanical Nozzle Seal Assemblies for Waterford 3 ML20203C4891999-02-0505 February 1999 Proposed Revised Tech Specs Pages 3/4 3-12a & B 3/4 3-1a Re Reactor Trip Circuit Breaker Surveillance Interval Extension ML20199D9851999-01-12012 January 1999 Proposed Tech Specs,Adding Requirement That CR Intake Monitors Be Operable & SRs Be Applicable During Movement of Irradiated Fuel ML20199E0861999-01-12012 January 1999 Proposed Tech Specs Re Rev 1 for TS Change Request NPF-38-174 ML20198G2401998-12-23023 December 1998 Proposed Tech Specs,Modifying LCO for 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20196D2181998-11-30030 November 1998 Proposed Tech Specs Pages 3/4 8-8,3/4 9-8,3/4 9-9 & B 3/4 9-2,revised for Consistency Between Action Statements & NUREG-1432,Rev 1, Std Tech Specs for CE Plants ML20154E4171998-10-0606 October 1998 Proposed Tech Specs Pages Re TS Change Request NPF-38-212, Modifying Requirement to Perform Mtc Test Near End of Each Cycle ML20154E1141998-10-0101 October 1998 Proposed Tech Specs Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Sys ML20153D5771998-09-23023 September 1998 Proposed Tech Specs Revising Description Re Reactor Power Input Used by Operating Bypass Permissive & Trip Enable of 10-4% Bistable ML20153B4441998-09-18018 September 1998 Proposed Tech Specs Modifying Notes in Tables 2.2-1 & 3.3-1 Re Reactor Protective Instrumentation ML20151W5971998-09-11011 September 1998 Proposed Tech Specs Re Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7921998-08-12012 August 1998 Proposed Tech Specs,Increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7361998-07-29029 July 1998 Proposed Tech Specs Pages Revising TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model ML20236H1501998-07-0202 July 1998 Proposed Tech Specs Section 3/4.3.2,adding Restriction on Period of Time Channel of Efas Instrumentation Can Remain in Tripped Condition ML20249C8321998-06-29029 June 1998 Proposed Tech Specs 3.7.6.1,3.7.6.2,3.7.6.3,3.7.6.4 & 3.7.6.5,revising Control Room Ventilation to Be Consistent w/NUREG-1432 ML20249C7901998-06-29029 June 1998 Proposed Tech Specs Adding Footnote to Action Statements to Allow CR Ventilation Sys to Be Unisolated Periodically Under Administrative Controls ML20249A3101998-06-12012 June 1998 Proposed Tech Specs Pages,Adding Footnote to TS Refueling Operations,Surveillance Requirements 4.9.7.2,to Effect Limited Deviation to Allow Crane Main Hook Electrical Interlocks to Be Replaced W/Administrative Controls ML20248B7611998-05-28028 May 1998 Proposed TS Pages Supporting Change to TS 3.7.1.2, Surveillance Requirement 4.7.1.2 & Bases for Emergency Feedwater Sys ML20248H7871998-05-25025 May 1998 Rev 1 to Waterford Unit 3 Second Interval ISI Plan ML20247P2431998-05-21021 May 1998 Proposed Tech Specs Re Design Feature Suppl ML20217P8411998-05-0101 May 1998 Rev TS Pages Changing Actions Required Should Channel of Recirculation Actuation Signal (RAS) Be Placed in Tripped Condition,Replacing TS Pages Submitted in 970603 Submittal ML20217L9971998-04-30030 April 1998 Small Break LOCA ECCS Performance Analysis Using Abb/Ce Suppl 2 Model ML20217D5181998-03-25025 March 1998 Proposed TS 3.9.8.1,3.9.8.2,TS Action 3.9.8.2a,3.8.1.2 & Bases 3/4.9.8 ML20198R3081998-01-21021 January 1998 Errata to Proposed TS Change Request NPF-38-196 Which Changed TS 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1.-1 by Removing Cycle Dependent B Concentration & Boration Flow Rate from Action Statements ML20198R1251998-01-21021 January 1998 Corrections to Proposed Tech Spec 3/4.1 Re Reactivity Control Sys ML20197C6431997-12-22022 December 1997 Proposed Tech Specs Page Supplementing TS Change Request NPF-38-186,by Retaining Operations Superintendent in Paragraph 6.2.2.f of Administrative Controls Section ML20202C2911997-12-0101 December 1997 Rev 0 to Pump & Valve Inservice Test Plan for Second 10-Yr Interval. Page 23 of Incoming Submittal Not Included ML20199A0011997-11-13013 November 1997 Errata to Proposed Tech Specs Change Request NPF-38-193, Replacing Pages 13 Through 21 ML20199A1101997-11-13013 November 1997 Proposed Tech Specs,Modifying 6.8.4.a, Primary Coolant Sources Outside Containment to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217M0221997-10-28028 October 1997 Rev 8 to RW-001-210, Process Control Program ML20217H5931997-10-14014 October 1997 Revised Page of App B of FOL, Environ Protection Plan (Nonradiological) ML20217G2421997-10-0707 October 1997 Proposed Tech Specs Modifying 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8141997-09-25025 September 1997 Proposed Tech Specs Pages Modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G7131997-07-0707 July 1997 Proposed Tech Specs Expanding Applicability of TS 3.7.1.3 to Include Mode 4 Operational Requirements & Maintains 91 Percent Minimum Condensate Storage Pool Level Previously Requested for Modes 1,2 & 3 ML20141D8551997-06-26026 June 1997 Proposed Tech Specs Revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases 1999-08-04 Category:TEST REPORT MONTHYEARML20217L9971998-04-30030 April 1998
[Table view]Small Break LOCA ECCS Performance Analysis Using Abb/Ce Suppl 2 Model ML20237A0981992-05-14014 May 1992 Rev 0 to Anchor/Darling Valve Company Rept on Blowdown Testing, for A/Dv 900 Double Disc Gate Valve ML20082F5031991-06-30030 June 1991 Reactor Containment Bldg Integrated Leak Rate Test, Final Rept ML20059E7901990-01-22022 January 1990 ASTM E-72 Load Testing of 2-h Solid Stud Wall ML20151Y7241988-05-31031 May 1988 Reactor Containment Integrated Leak Rate Test,Final Rept W3P87-0969, Cycle 2 Reload Startup Test Rept for Period Ending 8703011987-03-0101 March 1987 Cycle 2 Reload Startup Test Rept for Period Ending 870301 ML20207G4611986-12-30030 December 1986 Basemat Monitoring Program Special Rept W3P86-0048, Addendum 1 to Waterford Steam Electric Station Unit 3 Startup Rept1986-03-14014 March 1986 Addendum 1 to Waterford Steam Electric Station Unit 3 Startup Rept W3P85-3218, Startup Rept for Us Nrc1985-10-10010 October 1985 Startup Rept for Us Nrc ML20116N5291985-04-25025 April 1985 Rev 1 to Evaluation of Potential Adverse Effects of Failure of Containment Coatings on Post-Accident Fluid Sys, Rept on License Condition 16 ML20106F3671984-10-31031 October 1984 NDT Evaluation of Basemat Concrete ML20106F3551984-10-25025 October 1984 Summary Evaluation,Structural Significance of Basemat NDT Results ML20080U4931984-01-31031 January 1984 Evaluation of Natural Circulation Cooldown Test Performed at San Onofre Nuclear Generating Station ML20079L4731983-06-0101 June 1983 Fire Qualification Test Hemyc Cable Wrap Sys as Installed by Insulco,Inc & Affiliated Co, Final Rept ML20077A7391983-05-0101 May 1983 Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept ML20079L4591983-02-14014 February 1983 Comparison of Hemyc Sys Fire Test to Sandia 20-Ft Separation Test & Cmeb 9.5.1 ML20028G3131982-11-30030 November 1982 Nonproprietary Version of, Suppl to Waterford 3,Cycle 1 Cpc/Ceac Phase II Software Verification Test Rept. ML20063D2011982-06-30030 June 1982 Nonproprietary CEN-209(C)-NP, Waterford 3,Cycle 1 Cpc/Ceac Phase 1 Software Verification Test Rept ML20063D2051982-06-30030 June 1982 Nonproprietary CEN-208(C)-NP, Waterford 3,Cycle 1 Cpc/Ceac Phase II Software Verification Test Rept ML20054J9001982-06-30030 June 1982 Model Testing of Safety Injection Sys Sump ML20063D2091982-06-21021 June 1982 Nonproprietary CEN-207(C)-NP, Waterford 3,Cycle 1 CPC & Ceac Data Base Document ML20063H6381982-05-25025 May 1982 Post-weld Heat Treatment Test Results ML20076B9391981-11-30030 November 1981 Eddy Current Exam,Oct-Nov 1981 ML20028G2191981-10-0909 October 1981 Az Nuclear Power Project 150-Inch Reed Switch Position Transmitter & Litton Electrical Connector Seismic Qualification Test (Sine Sweep Testing). Age Considerations for Seismic Design & Surveillance in Mild Environs Encl ML20127B6151976-05-31031 May 1976 Mat 10B Placement Rept. Related Info Encl ML20127B6081975-11-30030 November 1975 Clam Shell Filter Blanket Test Rept 1998-04-30 |