Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217L99730 April 1998Small Break LOCA ECCS Performance Analysis Using Abb/Ce Suppl 2 Model
ML20237A09814 May 1992Rev 0 to Anchor/Darling Valve Company Rept on Blowdown Testing, for A/Dv 900 Double Disc Gate Valve
ML20082F50330 June 1991Reactor Containment Bldg Integrated Leak Rate Test, Final Rept
ML20059E79022 January 1990ASTM E-72 Load Testing of 2-h Solid Stud Wall
ML20151Y72431 May 1988Reactor Containment Integrated Leak Rate Test,Final Rept
W3P87-0969, Cycle 2 Reload Startup Test Rept for Period Ending 8703011 March 1987Cycle 2 Reload Startup Test Rept for Period Ending 870301Shutdown Margin
ML20207G46130 December 1986Basemat Monitoring Program Special Rept
W3P86-0048, Addendum 1 to Waterford Steam Electric Station Unit 3 Startup Rept14 March 1986Addendum 1 to Waterford Steam Electric Station Unit 3 Startup ReptBoric Acid
Anticipated operational occurrence
W3P85-3218, Startup Rept for Us Nrc10 October 1985Startup Rept for Us Nrc
ML20116N52925 April 1985Rev 1 to Evaluation of Potential Adverse Effects of Failure of Containment Coatings on Post-Accident Fluid Sys, Rept on License Condition 16Coatings
ML20106F36731 October 1984NDT Evaluation of Basemat Concrete
ML20106F35525 October 1984Summary Evaluation,Structural Significance of Basemat NDT Results
ML20080U49331 January 1984Evaluation of Natural Circulation Cooldown Test Performed at San Onofre Nuclear Generating Station
ML20079L4731 June 1983Fire Qualification Test Hemyc Cable Wrap Sys as Installed by Insulco,Inc & Affiliated Co, Final ReptHemyc
Fire Protection Program
ML20077A7391 May 1983Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept
ML20079L45914 February 1983Comparison of Hemyc Sys Fire Test to Sandia 20-Ft Separation Test & Cmeb 9.5.1Fire Barrier
Coatings
Hemyc
ML20028G31330 November 1982Nonproprietary Version of, Suppl to Waterford 3,Cycle 1 Cpc/Ceac Phase II Software Verification Test Rept.
ML20063D20130 June 1982Nonproprietary CEN-209(C)-NP, Waterford 3,Cycle 1 Cpc/Ceac Phase 1 Software Verification Test Rept
ML20063D20530 June 1982Nonproprietary CEN-208(C)-NP, Waterford 3,Cycle 1 Cpc/Ceac Phase II Software Verification Test Rept
ML20054J90030 June 1982Model Testing of Safety Injection Sys Sump
ML20063D20921 June 1982Nonproprietary CEN-207(C)-NP, Waterford 3,Cycle 1 CPC & Ceac Data Base Document
ML20063H63825 May 1982Post-weld Heat Treatment Test Results
ML20076B93930 November 1981Eddy Current Exam,Oct-Nov 1981Non-Destructive Examination
Hydrostatic
Nondestructive Examination
Liquid penetrant
ML20028G2199 October 1981Az Nuclear Power Project 150-Inch Reed Switch Position Transmitter & Litton Electrical Connector Seismic Qualification Test (Sine Sweep Testing). Age Considerations for Seismic Design & Surveillance in Mild Environs EnclEarthquake
ML20127B61531 May 1976Mat 10B Placement Rept. Related Info Encl
ML20127B60830 November 1975Clam Shell Filter Blanket Test Rept