ML14232A345

From kanterella
Revision as of 02:14, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
09/03/2014 Notice of Public Meeting with PPL, Susquehanna Steam Electric Station, Unit 2, to Discuss Results of Nrc'S Supplemental Inspection Procedure 95002
ML14232A345
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 08/20/2014
From: Fred Bower
Reactor Projects Region 1 Branch 4
To:
BOWER, FL
References
MN 14-017
Download: ML14232A345 (4)


Text

MN No.14-017 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING August 20, 2014 Licensee: PPL Susquehanna, LLC Facilities: Susquehanna Steam Electric Station (SSES) Unit 2 Docket No.: 50-388 Date/Time: September 3, 2014 5:00 p.m. - 6:00 p.m.

Location: Susquehanna Energy Information Center 634 Salem Boulevard Berwick, PA 18603 Purpose: The U. S. Nuclear Regulatory Commission (NRC) will meet with PPL to discuss the results of the NRCs Supplemental Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, conducted at SSES Unit 2 during the weeks of July 14 and July 28, 2014. The supplemental inspection was performed as the result of two White Performance Indicators, both in the Initiating Events Cornerstone of the NRCs Action Matrix.

This regulatory performance meeting will discuss the performance deficiencies and proposed corrective actions associated with the White issues. Following the meeting with PPL, the NRC will respond to public questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: H. Nieh, Director, Division of Reactor Projects F. Bower, Chief, Division of Reactor Projects, Branch 4 J. Kulp, 95002 Team Leader J. Greives, Senior Resident Inspector, Susquehanna PPL Attendees: R. Franssen, General Manager - Operations J. Tripoli, Manager - Nuclear Regulatory Affairs Public Participation: This is a Category 1 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.

Meeting Contact: Fred L. Bower, Chief, Projects Branch 4 610-337-5200 E-mail: fred.bower@nrc.gov

2 Additional information relative to the NRCs annual assessment process and the safety performance of the Susquehanna Steam Electric Station can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by August 29, 2014, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

/RA/

Approved by: _______________________

Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects cc w/encl: Distribution via ListServ

3 Agenda NRCs Performance Assessment Meeting Susquehanna Steam Electric Station September 3, 2014 5:00 p.m. - 6:00 p.m.

Susquehanna Energy Information Center 634 Salem Blvd.

Berwick, PA 18603 Formal Meeting Opening Remarks and Introductions 5 mins Discussion of SSESs performance deficiencies and proposed corrective actions associated with the White issues. 20 mins Supplemental Inspection Objective and Scope 10 mins Supplemental Inspection Results and Observations 10 mins PPL Response Break 5 mins NRC to address public questions as needed Closing Remarks and Adjourn Meeting 5 mins

ML14232A345 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME JGreives/GSB for ATurilin/ AT SBarber/ GSB FBower/ FLB DATE 08/20/14 08/20/14 08/20/14 08/20/14