ML040490137

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Pennsylvania Power and Light (Ppl), Susquehanna Steam Electric Station Re.: Proposed Minimimum Critical Power Ratio (MCPR) Safety Limit (SL) Changes in Support of Review of the MCPR Application Dated July 1, 2003
ML040490137
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/18/2004
From: Richard Guzman
NRC/NRR/DLPM/LPD1
To: Richard Laufer
NRC/NRR/DLPM/LPD1
Guzman R, NRR/DLPM 415-1030
References
Download: ML040490137 (7)


Text

February 18, 2004 MEMORANDUM TO: Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management FROM: Richard V. Guzman, Project Manager, Section 1 /RA/

Project Directorate I Division of Licensing Project Management

SUBJECT:

FORTHCOMING MEETING WITH PPL SUSQUEHANNA, LLC (PPL),

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 DATE & TIME: Thursday, February 26, 2004 9:00 a.m. - 12:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room O-14-B-8 Rockville, Maryland PURPOSE: To discuss PPLs proposed minimimum critical power ratio (MCPR) safety limit (SL) changes in support of review of the MCPR application dated July 1, 2003, as supplemented by letters dated November 17 and December 22, 2003.

CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion but before the meeting is adjourned.

MEETING CONTACTS: Rich Guzman, NRR Tim Colburn, NRR 301-415-1030 301-415-1402 rvg@nrc.gov tgc@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

R. Laufer PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC PPL Framatome R. Guzman, NRR M. Crowthers M. Garrett F. Akstulewicz, NRR J. Geosits J. Ingham Z. Abdullahi, NRR J. Harzell E. Kendrick, NRR J. Kulick A. Attard, NRR C. Lehmann T. Huang, NRR B. Saccone Docket Nos. 50-387 and 50-388

Attachment:

Agenda (ML040490137) cc w/att: See next page

R. Laufer PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC PPL Framatome R. Guzman, NRR M. Crowthers M. Garrett F. Akstulewicz, NRR J. Geosits J. Ingham Z. Abdullahi, NRR J. Harzell E. Kendrick, NRR J. Kulick A. Attard, NRR C. Lehmann T. Huang, NRR B. Saccone Docket Nos. 50-387 and 50-388

Attachment:

Agenda (ML040490137) cc w/att: See next page DISTRIBUTION:

PUBLIC PDI-1 R/F MOBrien RLaufer RGuzman BSheron TMarsh/ELeeds AHowe KJohnson FAkstulewicz OPA CBixler, RI DScrenci, RI ZAbdullahi THuang ACRS JJolicoeur, EDO, RI PMNS AAttard EKendrick Receptionist (OWFN and TWFN) OGC TColburn SHansell JAlbright ACCESSION NO. ML040490137 OFFICE PDI-1/PM PDI-2/LA PDI-1/Acting SC PDI-1/Acting PD NAME RGuzman MOBrien PMilano AHowe DATE 2/18/04 2/18/04 2/18/04 2/18/04 OFFICIAL RECORD COPY

PPL SUSQUEHANNA, LLC U.S. NUCLEAR REGULATORY COMMISSION FEBRUARY 26, 2004, APPLICATION REVIEW MEETING AGENDA INTRODUCTIONS 9:00 a.m. - 9:05 a.m.

OBJECTIVES 9:05 a.m. - 9:10 a.m.

INITIAL STAFF COMMENTS 9:10 a.m. - 9:30 a.m.

REVIEW OF FRAMATOME/PPL METHODOLOGY 9:30 a.m. - 10:30 a.m.

Impact of Design Power Distribution (PD) on MCPR SL Monitoring System vs. Design PD Uncertainty Sensitivity Analysis - PPL vs. Framatome Design Model BREAK 10:30 a.m. - 10:35 a.m.

DISCUSSION/REVIEW OF OPEN ITEMS 10:35 a.m. - 11:30 a.m.

CONCLUSIONS 11:30 a.m. - 11:40 a.m.

Attachment

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Bryce L. Shriver Michael H. Crowthers Senior Vice President and Chief Nuclear Supervising Engineer Officer Nuclear Regulatory Affairs PPL Susquehanna, LLC PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Two North Ninth Street, GENA61 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Richard L. Anderson Dale F. Roth Vice President - Nuclear Operations Manager - Quality Assurance PPL Susquehanna, LLC PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Berwick, PA 18603-0467 Aloysius J. Wrape, III Herbert D. Woodeshick General Manager - Nuclear Assurance Special Office of the President PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENA92 634 Salem Blvd., SSO Allentown, PA 18101-1179 Berwick, PA 18603-0467 Terry L. Harpster Bryan A. Snapp, Esq General Manager - Plant Support Assoc. General Counsel PPL Susquehanna, LLC PPL Services Corporation 769 Salem Blvd., NUCSA4 Two North Ninth Street, GENTW3 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Robert A. Saccone Supervisor - Document Control Services General Manager - Nuclear Engineering PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENTW3 769 Salem Blvd., NUCSB3 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro Allegheny Electric Cooperative, Inc.

Manager - Nuclear Regulatory Affairs 212 Locust Street PPL Susquehanna, LLC P.O. Box 1266 Two North Ninth Street, GENA61 Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director - Bureau of Radiation Protection Curtis D. Markley Pennsylvania Department of Supervisor - Nuclear Regulatory Affairs Environmental Protection PPL Susquehanna, LLC P.O. Box 8469 769 Salem Blvd., NUCSA4 Harrisburg, PA 17105-8469 Berwick, PA 18603-0467 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803