ML12066A077

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with PPL Susquehanna, LLC to Discuss the Results of the Nrc'S Supplemental Inspection Procedure 95002,conducted at the Susquehanna Steam Electric Station in February, 2012
ML12066A077
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/07/2012
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
Shared Package
ML12055A178 List:
References
MN 12-006
Download: ML12066A077 (4)


Text

MN No.12-006 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 7, 2012 Licensee: PPL Susquehanna, LLC Facilities: Susquehanna Steam Electric Station, Units 1 and 2 Docket Nos: 50-387 and 50-388 Date/ Time: March 21, 2012 7:00 p.m. - 8:30 p.m.

Location: Eagle Building 107 S. Market Street Berwick, PA 18603

Purpose:

The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the results of the NRCs Supplemental Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, conducted during the weeks of February 13 and February 27, 2012. The supplemental inspection was performed as the result of one White Finding and one White Performance Indicator, both in the Initiating Events Cornerstone of the NRCs Action Matrix.

This regulatory performance meeting will discuss the performance deficiencies and proposed corrective actions associated with the White issues. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: W. Dean, Regional Administrator, Region I J. Tappert, Director, Division of Reactor Projects P. Krohn, Chief, Division of Reactor Projects, Branch 4 D. Schroeder, 95002 Team Leader P. Finney, Senior Resident Inspector, Susquehanna J. Greives, Resident Inspector, Susquehanna Public Participation: This is a Category 1 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.

Meeting

Contact:

Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: paul.krohn@nrc.gov

2 Additional information relative to the NRCs annual assessment process and the safety performance of the Susquehanna Steam Electric Station can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by March 19, 2012, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by: /RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ

ML12066A077 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook PKrohn DATE 3/5/12 3/5/12 3

Agenda NRCs Annual Assessment Meeting Susquehanna Steam Electric Station March 21, 2012 7:00 p.m. - 8:30 p.m.

Eagle Building 107 South Market Street Berwick, PA 18603 Formal Meeting Introduction Inspection Procedure 95002 scope and objectives ..................................... (10 minutes)

Inspection Procedure 95002 inspection results (10 minutes)

USNRC Regulatory Performance Summary ..................................................... (10 minutes)

Closing Remarks ............................................................................................... (5 minutes)

Public Questions and Answer session with NRC staff..(as needed)