ML042290535

From kanterella
Jump to navigation Jump to search
Notice of Meeting with PPL Susquehanna, LLC (Ppl), Susquehanna Steam Electric Station, Unit Nos. 1 and 2
ML042290535
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/17/2004
From: Richard Guzman
NRC/NRR/DLPM/LPD1
To: Richard Laufer
NRC/NRR/DLPM/LPD1
Guzman R, NRR/DLPM 415-1030
References
Download: ML042290535 (6)


Text

August 17, 2004 MEMORANDUM TO: Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management FROM: Richard V. Guzman, Project Manager, Section 1 /RA/

Project Directorate I Division of Licensing Project Management

SUBJECT:

FORTHCOMING MEETING WITH PPL SUSQUEHANNA, LLC (PPL),

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 DATE & TIME: Thursday, September 2, 2004 9:00 a.m. - 12:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room O-10-B-4 Rockville, Maryland PURPOSE: (1) To discuss PPLs minimimum critical power ratio safety limit (MCPRSL) proposed Technical Specification revisions for Unit 2 Mid-Cycle 12 (U2C12) and Unit 2 Cycle 13 (U2C13) with respect to channel bow measurements and methodology changes.

(2) To discuss PPLs December 22, 2003, license amendment request regarding the implementation of the Oscillation Power Range Monitoring (OPRM) System.

CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion but before the meeting is adjourned.

MEETING CONTACTS: Rich Guzman, NRR Tim Colburn, NRR 301-415-1030 301-415-1402 rvg@nrc.gov tgc@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

R. Laufer PARTICIPANTS: Participants consist of members of the Office of Nuclear Reactor Regulation (NRR), PPL Susquehanna, and Framatome Advanced Nuclear Power (ANP).

NRC PPL Framatome, ANP R. Guzman, NRR M. Crowthers J. Holmes F. Akstulewicz, NRR A. Dyszel J. Ingham T. Huang, NRR J. Kulick S. Wu, NRR C. Lehmann H. Li, NRR Docket Nos. 50-387 and 50-388

Attachment:

NRC staff agenda cc w/att: See next page

R. Laufer PARTICIPANTS: Participants consist of members of the Office of Nuclear Reactor Regulation (NRR), PPL Susquehanna, and Framatome Advanced Nuclear Power (ANP).

NRC PPL Framatome, ANP R. Guzman, NRR M. Crowthers J. Holmes F. Akstulewicz, NRR A. Dyszel J. Ingham T. Huang, NRR J. Kulick S. Wu, NRR C. Lehmann H. Li, NRR Docket Nos. 50-387 and 50-388

Attachment:

NRC staff agenda cc w/att: See next page DISTRIBUTION:

PUBLIC PDI-1 R/F MOBrien RLaufer RGuzman BSheron TMarsh/JLyons CHolden KJohnson FAkstulewicz OPA CBixler, RI DScrenci, RI THuang ACRS PMNS TColburn ABlamey OGC TMensah Receptionist (OWFN and TWFN) JJolicoeur, EDO, RI ACCESSION NO. ML042290535 OFFICE PDI-1/PM PDI-1/ SC PDI-1/ PD NAME RGuzman RLaufer CHolden DATE 8/16/04 8/16/04 8/16/04 OFFICIAL RECORD COPY

PPL SUSQUEHANNA, LLC U.S. NUCLEAR REGULATORY COMMISSION SEPTEMBER 2, 2004 LICENSE AMENDMENT REQUEST REVIEW MEETING AGENDA INTRODUCTIONS 9:00 a.m. - 9:05 a.m.

OBJECTIVES 9:05 a.m. - 9:10 a.m.

INITIAL STAFF COMMENTS 9:10 a.m. - 9:30 a.m.

REVIEW OF FRAMATOME/PPL METHODOLOGY 9:30 a.m. - 10:20 a.m.

Proposed Mid-Cycle U2C12 Amendment Channel Bow Measurements Confirmation of Existing Safety Limit Proposed U2C13 Amendment Methodology Changes Channel Bow Impact Proposed MCPRSL Change BREAK 10:20 a.m. - 10:30 a.m.

REVIEW OF OSCILLATION POWER RANGE 10:30 a.m. - 11:20 a.m.

MONITORING SYSTEM SUBMITTAL DISCUSSION/REVIEW OF OPEN ITEMS 11:20 a.m. - 11:30 a.m.

CONCLUSIONS 11:30 a.m. - 11:40 a.m.

Attachment

Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc Britt T. McKinney Michael H. Crowthers Vice President - Nuclear Site Operations Supervising Engineer PPL Susquehanna, LLC Nuclear Regulatory Affairs 769 Salem Blvd., NUCSB3 PPL Susquehanna, LLC Berwick, PA 18603-0467 Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard L. Anderson Vice President - Nuclear Operations Dale F. Roth PPL Susquehanna, LLC Manager - Quality Assurance 769 Salem Blvd., NUCSB3 PPL Susquehanna, LLC Berwick, PA 18603-0467 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Aloysius J. Wrape, III General Manager - Nuclear Assurance Luis A. Ramos PPL Susquehanna, LLC Special Office of the President Two North Ninth Street, GENPL4 PPL Susquehanna, LLC Allentown, PA 18101-1179 634 Salem Blvd., SSO Berwick, PA 18603-0467 Terry L. Harpster General Manager - Plant Support Bryan A. Snapp, Esq PPL Susquehanna, LLC Assoc. General Counsel 769 Salem Blvd., NUCSA4 PPL Services Corporation Berwick, PA 18603-0467 Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Robert A. Saccone General Manager - Nuclear Engineering Supervisor - Document Control Services PPL Susquehanna, LLC PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Two North Ninth Street, GENPL4 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Rocco R. Sgarro Richard W. Osborne Manager - Nuclear Regulatory Affairs Allegheny Electric Cooperative, Inc.

PPL Susquehanna, LLC 212 Locust Street Two North Ninth Street, GENPL4 P.O. Box 1266 Allentown, PA 18101-1179 Harrisburg, PA 17108-1266 Walter E. Morrissey Director - Bureau of Radiation Protection Supervising Engineer Pennsylvania Department of Nuclear Regulatory Affairs Environmental Protection PPL Susquehanna, LLC P.O. Box 8469 769 Salem Blvd., NUCSA4 Harrisburg, PA 17105-8469 Berwick, PA 18603-0467 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035

Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803 Mr. Bryce L. Shriver President, PPL Generation, LLC and and Chief Nuclear Officer PPL Generation, LLC 2 North Ninth Street Allentown, PA 18101