ML050700064

From kanterella
Jump to navigation Jump to search
Annual Assessment Meeting Notice
ML050700064
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/14/2005
From: Shanbaky M
Reactor Projects Region 1 Branch 4
To:
Shared Package
ML050700071 List:
References
MN 05-011
Download: ML050700064 (5)


Text

U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 14, 2005 MN No.05-011 Licensee: PPL Susquehanna, LLC Facility: Susquehanna Steam Electric Station Docket Nos.: 50-387; 50-388 Time and Date: April 6, 2005 at 2:00 pm Location: Susquehanna Energy Information Center 634 Salem Boulevard Berwick, PA 18603

Purpose:

The NRC requested an Annual Assessment Meeting with PPL to discuss the NRCs assessment of the safety performance of the Susquehanna Steam Electric Station for calendar year 2004. The NRCs assessment is documented in a letter dated March 2, 2005.

Attendees*:

NRC: Mohamed Shanbaky, Chief, Projects Branch 4 Alan Blamey, Senior Resident Inspector, Susquehanna Frederick Jaxheimer, Resident Inspector, Susquehanna Rich Guzman, Project Manager, NRR Licensee: Bryce Shriver, President & CNO - PPL Generation, LLC Britt McKinney, Vice President - Nuclear Site Operations Robert Saccone, Vice President - Nuclear Operations Gregory Ruppert, General Manager - Nuclear Engineering Terry Harpster, General Manager - Plant Support Aloysius Wrape, General Manager - Performance & Improvement Oversight Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC staff following the safety assessment presentation.

NRCs assessment letter can be found in ADAMS with Accession Number: ML050610683. This meeting notice with the attached meeting agenda can be located in ADAMS with Accession Number ML050700064. ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs Annual Assessment process and the safety performance of Susquehanna can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html .

2 Meeting

Contact:

Dr. Mohamed Shanbaky, Chief Projects Branch 4 610-337-5209 E-mail: mms1@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in this meeting shall make their request known to the NRC point-of-contact no later than two business days prior to the meeting. Attendance by other NRC personnel should be made known by March 30, 2005.

/RA/

Approved By:

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:

J. H. Miller, Executive Vice-President and COO - PPL Corporation B. T. McKinney, Vice President - Nuclear Site Operations R. A. Saccone, Vice President - Nuclear Operations for PPL Susquehanna LLC A. J. Wrape, III, General Manager- Performance Improvement and Oversight T. L. Harpster, General Manager - Plant Support K. Roush, Manager - Nuclear Training G. F. Ruppert, General Manager - Nuclear Engineering D. F. Roth, Manager - Quality Assurance R. R. Sgarro, Manager - Nuclear Regulatory Affairs M. Sleigh, Manager - Nuclear Security W. E. Morrissey, Supervisor - Nuclear Regulatory Affairs M. H. Crowthers, Supervising Engineer L. A. Ramos, Community Relations Manager, Susquehanna B. A. Snapp, Esquire, Associate General Counsel, PPL Services Corporation R. W. Osborne, Allegheny Electric Cooperative, Inc.

Board of Supervisors, Salem Township J. Johnsrud, National Energy Committee Supervisor - Document Control Services D. Allard, Director, Pennsylvania Bureau of Radiation Protection Commonwealth of Pennsylvania (c/o R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Bureau of Radiation Protection)

3 Distribution:

Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist

4 Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

T. Madden, OCA S. Lee, RI OEDO R. Laufer, NRR R. Guzman, NRR S. Collins, RA J. Wiggins, DRA K. Farrar, Regional Counsel D. Screnci, PAO N. Sheehan, PAO R. Bores, SLO G. Matakas, ORA W. Lanning, DRS J. Lubinski, DRS PMNS M. Shanbaky, DRP A. Burritt, DRP A. Blamey, DRP - SRI Susquehanna J. Richmond, DRP - RI Susquehanna F. Jaxheimer, DRP - RI Susquehanna S. Farrell, DRP - Susquehanna OA DOCUMENT NAME: E:\Filenet\ML050700064.wpd ADAMS Accession No.: ML050700064 ADAMS Package Accession No.: ML050700071 SISP Review Complete: MMS (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME Djohnson/MMS1 MShanbaky/MM f/ S1 DATE 03/11/05 03/11/05

OFFICIAL RECORD COPY Agenda NRCs Annual Assessment Meeting Susquehanna Steam Electric Station April 6, 2005 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Susquehanna Station Performance . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

PPL Susquehanna's Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . PPL (30 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

Statements from Public Officials and Members of the Public . . . . . . . . . . . . . (5 minutes each)

NRC to address public questions . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)