Forthcoming Meeting with PPL Susquehanna, LLC (Ppl); Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) Re Schedule and Approach for the Proposed SSES 1 and 2 Extended Power Uprate
ML053130285
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/09/2005
From: Richard Guzman
NRC/NRR/ADRO/DORL/LPLA
To: Richard Laufer
NRC/NRR/ADRO/DORL/LPLA
Guzman R, NRR/DLPM 415-1030
References
Download: ML053130285 (6)


Text

November 9, 2005 MEMORANDUM TO: Richard J. Laufer, Branch Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (NRR)

FROM:

Richard V. Guzman, Project Manager /RA/

Plant Licensing Branch I-1 Division of Operating Reactor Licensing, NRR

SUBJECT:

FORTHCOMING MEETING WITH PPL SUSQUEHANNA, LLC (PPL),

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (SSES 1 AND 2)

DATE & TIME:

Monday, November 21, 2005 9:00 a.m. - 12:30 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room O-12-B-4 Rockville, Maryland PURPOSE:

To conduct a working level-discussion related to the schedule and approach for the proposed SSES 1 and 2 extended power uprate (EPU) application related to control/reactor systems transient testing and EPU process guidance and topical reports.

CATEGORY 1:*

This is a Category 1 Meeting. The public is invited to observe this meeting (see Agenda) and will have one or more opportunities to communicate with the NRC after the business portion but before the meeting is adjourned.

MEETING CONTACTS:

Rich Guzman, NRR Tim Colburn, NRR 301-415-1030 301-415-1402 rvg@nrc.gov tgc@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

R. Laufer PARTICIPANTS:

Participants consist of members of the Office of Nuclear Reactor Regulation (NRR), PPL Susquehanna, and General Electric (GE).

NRC Thomas Alexion, NRR, Division of Policy and Rulemaking (DPR),

Special Projects Branch Quynh Nguyen, NRR, DPR, Special Projects Branch Rich Guzman, NRR, Division of Operating Reactor Licensing Lambros Lois, NRR, Division of Safety Systems (DSS), Boiling Water Reactor (BWR) Systems Branch George Thomas, NRR, DSS, BWR Systems Branch Zena Abdullahi, NRR, DSS, BWR Systems Branch Mohammed Razzaque, NRR, DSS, BWR Systems Branch Steve Jones, NRR, DSS, Balance of Plant Branch Bob Wolfgang, NRR, Division of Risk Assessment, Fire Protection Branch Allan Howe, NRR, Division of Engineering (DE), Instrumentation and Controls Branch (EICB)

Ahmed Iqbal, NRR, DE, EICB Hukam Garg, NRR, DE, EICB Hulbert Li, NRR, DE, EICB PPL George Jones, Vice President, Special Projects John Bartos, Extended Power Uprate (EPU) Engineering Lead John Oddo, EPU Licensing Chester R. Lehmann, Supervisor, Plant Analysis Kevin Browning, EPU Nuclear Steam Supply System/Emergency Core Cooling Containment Spray Systems James Williams, Licensed Senior Reactor Operator Michael Gorski, Project Manager John Geosits, EPU Nuclear Fuels James Klucar (Consultant, Applied Analysis Corporation)

Theodore DelGaizo (Consultant, Main Line Engineering - President)

Michael Garret (Consultant, Framatome Advanced Nuclear Power)

GE Larry King, Project Manager George Stramback, Licensing Manager Jim Harrison, Licensing Docket Nos. 50-387 and 50-388

Enclosure:

Agenda cc w/encl: See next page

R. Laufer PARTICIPANTS:

Participants consist of members of the Office of Nuclear Reactor Regulation (NRR), PPL Susquehanna, and General Electric (GE).

NRC Thomas Alexion, NRR, Division of Policy and Rulemaking (DPR),

Special Projects Branch Quynh Nguyen, NRR, DPR, Special Projects Branch Rich Guzman, NRR, Division of Operating Reactor Licensing Lambros Lois, NRR, Division of Safety Systems (DSS), Boiling Water Reactor (BWR) Systems Branch George Thomas, NRR, DSS, BWR Systems Branch Zena Abdullahi, NRR, DSS, BWR Systems Branch Mohammed Razzaque, NRR, DSS, BWR Systems Branch Steve Jones, NRR, DSS, Balance of Plant Branch Bob Wolfgang, NRR, Division of Risk Assessment, Fire Protection Branch Allan Howe, NRR, Division of Engineering (DE), Instrumentation and Controls Branch (EICB)

Ahmed Iqbal, NRR, DE, EICB Hukam Garg, NRR, DE, EICB Hulbert Li, NRR, DE, EICB PPL George Jones, Vice President, Special Projects John Bartos, Extended Power Uprate (EPU) Engineering Lead John Oddo, EPU Licensing Chester R. Lehmann, Supervisor, Plant Analysis Kevin Browning, EPU Nuclear Steam Supply System/Emergency Core Cooling Containment Spray Systems James Williams, Licensed Senior Reactor Operator Michael Gorski, Project Manager John Geosits, EPU Nuclear Fuels James Klucar (Consultant, Applied Analysis Corporation)

Theodore DelGaizo (Consultant, Main Line Engineering - President)

Michael Garret (Consultant, Framatome Advanced Nuclear Power)

GE Larry King, Project Manager George Stramback, Licensing Manager Jim Harrison, Licensing Docket Nos. 50-387 and 50-388

Enclosure:

Agenda cc w/encl: See next page DISTRIBUTION:

PUBLIC LPLI-1 R/F SLittle RLaufer RGuzman BBoger TMarsh/CHaney CHolden PMNS AHowe OPA TMensah ACRS OGC RWolfgang CMiller, EDO, RGN-I TColburn BBickett JTrapp LLois Receptionist (OWFN and TWFN)

TAlexion QNguyen SJones ACCESSION NO.: ML053130285 OFFICE NRR/LPLI-1/PM NRR/LPLI-1/LA NRR/LPLI-1/BC NAME RGuzman SLittle RLaufer DATE 11/09/05 11/09/05 11/09/05 OFFICIAL RECORD COPY

Enclosure PPL SUSQUEHANNA, LLC U.S. NUCLEAR REGULATORY COMMISSION NOVEMBER 21, 2005 EXTENDED POWER UPRATE (EPU) PRE-APPLICATION MEETING RELATED TO EPU PROCESS TOPICS, CONTROL SYSTEMS TESTING, AND TRANSIENT TESTING AGENDA INTRODUCTIONS 9:00 a.m. - 9:05 a.m.

OBJECTIVES 9:05 a.m. - 9:10 a.m.

INITIAL STAFF COMMENTS 9:10 a.m. - 9:15 a.m.

TESTING PLAN, METHODS, AND BASIS 9:15 a.m. - 10:15 a.m.

STANDARD REVIEW PLAN ADHERENCE 10:15 a.m. - 10:45 a.m.

BREAK 10:45 a.m. - 11:00 a.m.

PROCESS TOPICS, BASIS FOR EPU 11:00 a.m. - 11:50 a.m.

SUBMITTAL

SUMMARY

AND SCHEDULE REVIEW 11:50 a.m. - 12:10 p.m.

PUBLIC COMMENTS 12:10 p.m. - 12:25 p.m.

CONCLUSIONS AND CLOSING REMARKS 12:25 p.m. - 12:30 p.m.

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Aloysius J. Wrape, III General Manager - Performance Improvement and Oversight PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Terry L. Harpster General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Richard D. Pagodin General Manager - Nuclear Engineering PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Walter E. Morrissey Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Steven M. Cook Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Supervisor - Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.

212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803