IR 05000277-06-014 and 05000278-06-014; Peach Bottom Atomic Power Station (Pbaps); Ti 2515/168. Cover Letter
ML062650075
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/01/2006
From: James Trapp
Reactor Projects Region 1 Branch 4
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-06-014
Download: ML062650075 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 1, 2006Enclosure Contains SafeguardsInformation. When Separated fromenclosure, this document is notSAFEGUARDS InformationMr. Christopher M. CranePresident and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348SUBJECT:PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - NRCINSPECTION REPORT 05000277/2006014 and 05000278/2006014

Dear Mr. Crane:

On August 11, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspectionat your Peach Bottom Atomic Power Station, Units 2 and 3. The enclosed inspection report documents the inspection results, which were discussed on August 11, 2006, with Mr. J. Armstrong and Mr. C. Wiedersum of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.No findings of significance were identified.

In accordance with 10 CFR 2.390 and the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMSis accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The PublicElectronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection. Safeguards information determination madeby:Name/Title Barry C.Westreich, Chief Organization NSIR/DNS/SOS Basis 2/25/02 NRC Order Signature /RA/

Date 5/12/06 WARNING: Violation of Section 147,"Safeguards Information," of theAtomic Agency Act is subject to civiland criminal penalties. C. M. Crane-2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/RA/James M. Trapp, ChiefProjects Branch 4 Division of Reactor ProjectsDocket No.50-277, 50-278License No.DPR-44. DPR-56Enclosure: NRC Inspection Report 05000277/2006014 and 05000278/2006014 ( )cc w/o encl:R. Braun, Vice President Nuclear Oversight J. Grimes, Plant Manager J. Armstrong, Regulatory Assurance Managercc w/encl; w/SGI:W. Trump, Site Security Manager D. Allard, State Liaison Officer, Pennsylvania Bureau of Radiation Protection J. Powers, Director, Homeland Security, State of Pennsylvania G. Aburn, State Liaison Officer, Maryland Department of the Environment