ML080140372

From kanterella
Revision as of 16:08, 12 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Cyrstal River Unit 3 - Administrative Correction to Amendment Steam Generator Reporting Requirements (Tac. MD7453)
ML080140372
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/14/2008
From: Stewart Bailey
NRC/NRR/ADRO/DORL/LPLII-2
To: Young D
Florida Power & Light Co
Bailey S N,NRR/DLPM,415-1321
References
TAC MD7453
Download: ML080140372 (4)


Text

January 14, 2008

Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 - ADMINISTRATIVE CORRECTION TO AMENDMENT REGARDING STEAM GENERATOR REPORTING REQUIREMENTS (TAC NO. MD7453)

Dear Mr. Young:

On June 28, 1999, the Co mmission issued Amendm ent No. 180 to Facility Operating License No. DPR-72 for Crystal River Unit 3. This amendment changed the Technical Specifications (TSs) regarding inservice inspection and reporting requirements for the steam generator tubes. It was recently discovered that TS Page 5.0-29A was not deleted as intended during issuance of Amendment No. 180. This letter deletes TS Page 5.0-29A. Enclosed is a corrected list of effected pages for Amendment No. 180. We regret any inconvenience this may have caused. Sincerely, /RA/

Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-302

Enclosure:

As stated

cc w/enclosure: See next page Florida Power Corporation Crystal River Nuclear Plant, Unit 3

cc:

Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)

Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042

Mr. Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708

Mr. Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209

Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741

Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304

Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100

Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245

Mr. Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708

Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428

Ms. Phyllis Dixon Manager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708

David T. Conley Associate General Counsel II - Legal Dept.

Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551

Mr. Daniel L. Roderick Vice President, Nuclear Projects & Construction Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708

Mr. David Varner Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708

ATTACHMENT TO LICENSE AMENDMEN NO. 180 TO FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302

Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.

Remove Page Insert Page

5.0-16 5.0-16 5.0-17 5.0-17


5.0-17A 5.0-25 5.0-25 5.0-26 5.0-26 5.0-29 5.0-29 5.0-29A -----

January 14, 2008

Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 - ADMINISTRATIVE CORRECTION TO AMENDMENT REGARDING STEAM GENERATOR REPORTING REQUIREMENTS (TAC NO. MD7453)

Dear Mr. Young:

On June 28, 1999, the Co mmission issued Amendm ent No. 180 to Facility Operating License No. DPR-72 for Crystal River Unit 3. This amendment changed the Technical Specifications (TSs) regarding inservice inspection and reporting requirements for the steam generator tubes. It was recently discovered that TS Page 5.0-29A was not deleted as intended during issuance of Amendment No. 180. This letter deletes TS Page 5.0-29A. Enclosed is a corrected list of effected pages for Amendment No. 180. We regret any inconvenience this may have caused. Sincerely, /RA/ Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-302

Enclosure:

As stated

cc w/enclosure: See next page

Distribution:

PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrPMSBailey RidsOgcRp RidsNrrLABClayton (Hard Copy)

RidsAcrsAcnwMailCenter RidsRgn2MailCenter RidsNrrDorlDpr G. Hill, OIS (2 Hard Copies)

ADAMS ACCESSION NO.: ML080140372 NRR-058 OFFICE LPL2-2/PM LPL2-2/LALPL2-2/BC NAME SBailey BClayton TBoyce DATE 1/ 11 /08 1/ 11 /08 1/ 14 /08 OFFICIAL RECORD COPY