ML18051B231

From kanterella
Revision as of 21:57, 17 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Suppl to Physics Testing Rept for Cycle 6 Startup. All Acceptance Criteria for All Power Distribution Parameters Met
ML18051B231
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/03/1985
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML18051B232 List:
References
NUDOCS 8501150353
Download: ML18051B231 (1)


Text

,. y consumers Power company General Offices: 212 West Mlchlgen Avenue, Jeckson, Ml 49201 * (617) .788-0660

  • January 3, 1985 James G Keppler, Administrator Region III US Nuclear Regulatory Commission*

799 Roosevelt Road Glen Ellyn, IL 60137 .DOCKET 50-255 -LICENSE DPR-20 PALISADES PLANT -PHYSICS TESTiNG FOR PALISADES CYCLE q -. Start-up Supplement . . lE HQ F lLE oo.Pli. . . -. *consumers Power Company's submittal dated October 26, 1984 indicated that a supplemental physics report would be submitted for power distribution.

after full power at Palisades.

Attached to this letter is that supplemental report. The conclusions reached in the supplement were that all acceptance criterfa were met for all power distribution parameters for* Palisades Cycle 6 start-up.

  • Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector

-Palisades

!

850103 1 p ADOCK 05000255 -o PDR _ OC1284-0305A-NL02 JAN 71985