MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 IR 05000266/20220062023-03-0101 March 2023 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022006 and 05000301/2022006) ML23003A8022023-01-0303 January 2023 Notification of NRC Baseline Inspection and Request for Information ML22256A3182022-09-13013 September 2022 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection Report 05000266/2023010 05000301/2023010 IR 05000266/20220052022-08-26026 August 2022 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022005 and 05000301/2022005) ML22175A2002022-06-27027 June 2022 Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information: Inspection Report 05000266/2022004: 05000301/2022004 ML22172A2132022-06-22022 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML22173A0172022-06-22022 June 2022 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Point Beach Nuclear Plant IR 05000266/20210062022-03-0202 March 2022 Annual Assessment Letter for Point Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021006 and 05000301/2021006) ML22041B0752022-02-10010 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000266/2022002 ML21253A1672021-09-10010 September 2021 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000266/2022010 05000301/2022010 IR 05000266/20210052021-09-0101 September 2021 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021005 and 05000301/2021005) ML21214A2812021-08-0202 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21180A2302021-06-29029 June 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2021004 and 05000301/2021004 ML21074A3962021-03-15015 March 2021 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000266/2021010; 05000301/2021010 IR 05000266/20200062021-03-0404 March 2021 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2020006 and 05000301/2020006) IR 05000266/20200052020-09-0101 September 2020 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2020005 and 05000301/2020005) ML20218A4322020-08-0505 August 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2020004 ML20168A8912020-06-15015 June 2020 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Point Beach Nuclear Plant, Units 1 and 2 IR 05000266/20190062020-03-0303 March 2020 Annual Assessment Letter for Point Beach Nuclear Plants, Units 1 and 2 (Report 05000266/2019006 and 05000301/2019006) IR 05000266/20190052019-08-28028 August 2019 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2019005 and 05000301/2019005) ML19190A1532019-07-0909 July 2019 Ltr. 07/09/19 Point Beach Nuclear Plant, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000266/2019012; 05000301/2019012 (DRS-G.Hausman) ML19136A1402019-05-15015 May 2019 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Garza) ML19094B1182019-04-0404 April 2019 Ltr. 04/04/19 Point Beach Nuclear Plant, Units 1 and 2 - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the EQ Program; Inspection Report 05000266/2019013 and 05000301/2019013 (DRS-B.Jose) IR 05000266/20180062019-03-0404 March 2019 Annual Assessment Letter for Point Beach Nuclear Plant (Report 05000266/2018006 and 05000301/2018006) ML19037A3102019-02-0505 February 2019 Ltr. 02/05/19 Point Beach Nuclear Plant, Units 1 and 2 - Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection; Inspection Report 05000266/2019412; 05000301/2019412 (DRS-G.Hausman) ML19024A2772019-01-24024 January 2019 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2019001 (DRS-M.Domke) IR 05000266/20180052018-08-28028 August 2018 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2018005 and 05000301/2018005) IR 05000266/20170062018-03-0202 March 2018 Annual Assessment Letter for Point Beach Plant, Units 1 and 2 (Report 05000266/2017006 and 05000301/2017006) IR 05000266/20170052017-08-28028 August 2017 Updated Inspection Plan (Report 05000266/2017005 and 05000301/2017005) ML17088A7242017-03-29029 March 2017 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000266/2017007; 05000301/2017007 IR 05000266/20160062017-03-0101 March 2017 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2016006 and 05000301/2016006) ML17039B0182017-02-0808 February 2017 Information Request to Support Upcoming Temporary Instruction 2515/191 Inspection at Point Beach Nuclear Plant, Units 1 and 2 - Inspection Report 05000266/2017008; 05000301/2017008 IR 05000266/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Point Beach Nuclear Plant Units 1 and 2 (Report 05000266/2016005; 05000301/2016005) IR 05000266/20150062016-03-0202 March 2016 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Inspection Report 05000266/2015006 and 05000301/2015006) IR 05000266/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2015005; 05000301/2015005) ML15131A3132015-05-0808 May 2015 Ltr. 05/08/15 Point Beach Nuclear Plant, Units 1 and 2 - Information Request for an NRC Triennial Permanent Modifications and 10 CFR 50.59 (Mod/50.59) Baseline Inspection 05000266/2015010; 05000301/2015010 (Jjc) ML15124A9012015-05-0101 May 2015 Ltr. 05/01/15 Point Beach Nuclear Plant, Unit 2 - Notification of NRC Inspection and Request for Information (Msh) IR 05000266/20140012015-03-0404 March 2015 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2014001; 05000301/2014001) ML15050A2702015-02-19019 February 2015 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Point Beach Nuclear Plant, Units 1 and 2 ML14245A1662014-09-0202 September 2014 Mid-Cycle Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 IR 05000266/20130012014-03-0404 March 2014 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2013001; 05000301/2013001) ML14038A3472014-02-0606 February 2014 ISI Request for Information ML13246A2212013-09-0303 September 2013 2013 Point Beach MOC Letter Combined ML13172A4072013-06-20020 June 2013 Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000266-13-010; 05000301-13-010 ML13129A1952013-05-0909 May 2013 Ltr 5/9/13 Point Beach Ti 2515-182 Phase 2 Request for Information IR 05000266/20120012013-03-0404 March 2013 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (05000266/2012001; 05000301/2012001) 2024-02-05
[Table view] Category:Letter
MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 ML23208A2262023-08-28028 August 2023 Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval ML23171B1062023-06-21021 June 2023 Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 ML23114A1222023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications 2024-02-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 2, 2008
Mr. Larry Meyer
Site Vice President FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - POINT BEACH NUCLEAR PLANT
Dear Mr. Meyer:
On August 13, 2008, the NRC staff completed its performance review of Point Beach Nuclear Plant for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan. Plant performance for the most recent quarter at Point Beach Nuclear Plant, Units 1 and 2, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In our 2007 annual assessment letter dated March 3, 2008, (ADAMS Accession Number ML080600317), we advised you of the continuation of a substantive cross-cutting issue in the area of human performance involving a cross-cutting theme in the aspect of inadequate procedures H.2(c). The current 2008 mid-cycle assessment of the cross-cutting issue included a review of inspection results over the 12-month period of July 1, 2007, to June 30, 2008. During this period, we observed the number of findings with an associated cross-cutting aspect of inadequate procedures nominally decreased from nine to eight. Additionally, we identified a second theme related to human performance in the aspect of non-conservative decision-making
H.1(b), identifying five findings with this aspect in the 12-month assessment period. Of these five, several were primarily associated with your operations organization. The development of causal evaluations and implementation of corrective actions continue to be ineffective in demonstrating sustainable performance in the H.2(c) and H.1(b) areas. Therefore, the NRC has a concern with your scope of efforts and progress in addressing the cross-cutting area performance deficiencies and has concluded that the substantive cross-cutting issue in human performance will remain open. It will remain open until the NRC gains confidence in the L. Meyer
performance of your corrective action program to evaluate and correct human performance problems. Additionally, in our 2007 annual assessment letter, we advised you of a substantive cross-cutting issue in the area of problem identification and resolution involving a cross-cutting theme in the aspect of appropriate and timely corrective actions P.1(d). The mid-cycle assessment of the cross-cutting issue included a review of inspection results over the 12-month period of July 1, 2007, to June 30, 2008. During this period, we observed that the number of findings with an associated cross-cutting aspect of appropriate and timely corrective actions remained constant at eight, with five of these findings occurring in the most recent two quarters.
Because of the lack of progress, the NRC continues to have a concern with your scope of efforts and progress in addressing the cross-cutting area performance deficiencies and has concluded that the substantive cross-cutting issue in problem identification and resolution will remain open. It will remain open until the NRC gains confidence in the performance of your corrective action program to evaluate and correct problems. Because this mid-cycle assessment is the third consecutive assessment letter identifying a substantive cross-cutting issue in the human performance area and the second consecutive assessment letter identifying a substantive cross-cutting issue in the problem identification and resolution area, we request that you provide a written response discussing your causal evaluations, action plans, and timetables to address these issues and demonstrate sustainable performance in these areas. This response should be sent to the NRC within 30 days of receipt of this letter. In our 2007 annual assessment letter dated March 3, 2008, we had requested that you discuss at the 2007 end-of-cycle public meeting your actions to address the inadequate procedures H.2(c) substantive cross-cutting issue. At this meeting, held on July 16, 2008, the discussion was not of sufficient detail for us to understand the full scope of your actions. Consequently, we have scheduled a public meeting on September 24, 2008, to discuss this matter further. The enclosed inspection plan details the inspections, including baseline and other infrequently conducted inspections, less those related to security, scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle
review. In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
L. Meyer If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mike Kunowski at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan. Sincerely, /RA/ Cynthia D. Pederson, Director Division of Reactor Projects
Docket Nos. 50-266; 50-301;72-005
License Nos. DPR-24; DPR-27
Enclosure:
Point Beach Inspection/ Activity Plan DISTRIBUTION
- See next page Letter to L. Meyer from C. Pederson dated September 2, 2008
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - POINT BEACH NUCLEAR PLANT cc w/encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Executive Vice President, Nuclear and Chief Nuclear Officer A. Khanpour, Vice President, Engineering Support Licensing Manager, Point Beach Nuclear Plant M. Warner, Vice President, Nuclear Plant Support M. Ross, Managing Attorney A. Fernandez, Senior Attorney M. Gettler, Vice President, New Nuclear Projects W. Maher, Licensing Director, New Nuclear Projects K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer Chairman, Manitowoc County Board County Executive, Manitowoc Director, Manitowoc County Emergency Management Agency Chairman, Kewaunee County Board Mayor of Kewaunee City Manager, Two Rivers Director, Kewaunee County Emergency Management Agency President, Village of Mishicot Chairman, Village of Two Creeks G. Mortensen, INPO L. Meyer If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mike Kunowski at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan. Sincerely, /RA/ Cynthia D. Pederson, Director Division of Reactor Projects
Docket Nos. 50-266; 50-301;72-005
License Nos. DPR-24; DPR-27
Enclosure:
Point Beach Inspection/Activity Plan DISTRIBUTION
- See next page
DOCUMENT NAME: G:\1-SECY\2008 MID-CYCLE FINAL LETTERS\POINT BEACH MOC
2008.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MKunowski:cms CPederson
DATE 8/28/08 8/29/08 OFFICIAL RECORD COPY
Letter to L. Meyer from C. Pederson dated September 2, 2008
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - POINT BEACH NUCLEAR PLANT DISTRIBUTION
- RidsNrrDorlLpl3-1
RidsNrrPMPointBeach
RidsNrrDirslpab Resource
James Caldwell Mark Satorius Kenneth Obrien Jared Heck
Allan Barker
DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov
Point Beach Inspection / Activity Plan 09/01/2008
-12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/29/2008 Report 22 3 BI ENG-UNIT 1 INSERVICE INSPECTION/TI 172 Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 10/06/2008 11/07/2008 1 2515/172 IP Baseline Inspections Inservice Inspection Activities - PWR 10/08/2008 11/07/2008 1 7111108P IP 2 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections A ccess Control to Radiologically Significant Areas 10/06/2008 10/10/2008 1 7112101 IP Baseline Inspections A LARA Planning and Controls 10/06/2008 10/10/2008 1 7112102 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 10/06/2008 10/10/2008 1 7112201 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/06/2008 10/10/2008 1 71151-PR01 IP 3 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION EP Baseline Inspection Exercise Evaluation 12/08/2008 12/12/2008 1 7111401 IP Baseline Inspections Drill/Exercise Performance 12/08/2008 12/12/2008 1 71151-EP01 IP Baseline Inspections ERO Drill Participation 12/08/2008 12/12/2008 1 71151-EP02 IP Baseline Inspections A lert & Notification System 12/08/2008 12/12/2008 1 71151-EP03 IP 2 TI-TEMPORARY INSTRUCTION 2515/171 Generic Safety Inspecti o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 12/15/2008 12/19/2008 2 2515/171 IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 01/12/2009 01/16/2009 1 7112103 IP 2 ISFSI-ISFSI INSPECTION Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 02/01/2009 05/31/2009 1 60855.1 IP 1 BI ENG-TRIENNIAL HEAT SINK INSPECTION Baseline Inspections Heat Sink Performance 02/23/2009 02/27/2009 1 7111107B IP 4 BI PI&R-BIENNIAL PI&R INSPECTION Baseline Inspections Identification and Resolution of Problems 03/09/2009 03/27/2009 1 71152B IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections A ccess Control to Radiologically Significant Areas 04/06/2009 04/10/2009 1 7112101 IP Baseline Inspections A LARA Planning and Controls 04/06/2009 04/10/2009 1 7112102 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/06/2009 04/10/2009 1 71151-OR01 IP 2 OL EXAM-OPERATOR LICENSING EXAM Not Applicable OL - INITIAL EXAM - MAY 2009 - POIN 04/13/2009 04/17/2009 1 W90209 Not Applicable OL - INITIAL EXAM - MAY 2009 - POIN 05/04/2009 05/15/2009 1 W90209 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Radioactive Material Processing and Transportation 07/06/2009 07/10/2009 1 7112202 IP Baseline Inspections RETS/ODCM Radiological Effluent 07/06/2009 07/10/2009 1 71151-PR01 IP 2 BI OL-BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections Licensed Operator Requalification Program 08/03/2009 08/07/2009 1 7111111B IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Point Beach Inspection / Activity Plan 09/01/2008
-12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/29/2008 Report 22 2 BI ENG-ENGINEERING INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 10/05/2009 10/30/2009 2 7111108P IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections A ccess Control to Radiologically Significant Areas 10/26/2009 10/30/2009 1 7112101 IP Baseline Inspections A LARA Planning and Controls 10/26/2009 10/30/2009 1 7112102 IP Baseline Inspections Reactor Coolant System Activity 10/26/2009 10/30/2009 1 71151-BI01 IP 3 BI ENG-ENGINEERING MODIFICATIONS / 50.59 INSP.
Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 11/16/2009 12/04/2009 1 7111117B IP 1 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION EP Baseline Inspection A lert and Notification System Testing 12/07/2009 12/11/2009 1 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 12/07/2009 12/11/2009 1 7111403 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 12/07/2009 12/11/2009 1 7111405 IP Baseline Inspections Drill/Exercise Performance 12/07/2009 12/11/2009 1 71151-EP01 IP Baseline Inspections ERO Drill Participation 12/07/2009 12/11/2009 1 71151-EP02 IP Baseline Inspections A lert & Notification System 12/07/2009 12/11/2009 1 71151-EP03 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.