ML14098A316

From kanterella
Revision as of 08:58, 28 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
5/1/2014 - Notice of Category 1 Public Meeting to Discuss Entergy Performance at Pilgrim Nuclear Power Station During Cy 2013
ML14098A316
Person / Time
Site: Pilgrim
Issue date: 04/08/2014
From: Raymond McKinley
NRC/RGN-I/DRP/PB5
To:
Entergy Nuclear Operations
McKinley R R
References
MN No.14-012
Download: ML14098A316 (4)


Text

MN No.14-012 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING

April 8, 2014

Licensee: Entergy Nuclear Operations, Inc.

Facility: Pilgrim Nuclear Power Station

Docket No: 50-293

Date/Time: Thursday, May 1, 2014 6:30 p.m. to 8:30 p.m.

Location: Radisson Hotel Plymouth harbor Mayflower Room 180 Water St Plymouth, MA 02360

Purpose: The U. S. Nuclear Regulatory Commission (NRC) will meet with Entergy to discuss the NRC's assessment of sa fety performance at the Pilgrim Nuclear Power Station for 2013, as described in the annual assessment letter dated March 4, 2014. The meeting will include a discussion of any new or existing programs that are designed to maintain or improve Entergy's current performance. Following the meeting with Entergy, the NRC will have a separate session to respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations. The agenda is enclosed.

NRC Attendees: W. Dean, Regional Administrator, Region I E. Benner, Acting Deputy Division Director, Division of Reactor Projects R. McKinley, Chief, Projects Branch 5, Division of Reactor Projects M. Schneider, Senior Resident Inspector E. Carfang, Senior Resident Inspector B. Scrabeck, Resident Inspector

J. DeBoer, Project Engineer

Public Participation: This is a Category 1 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.

Meeting Contact: Raymond R. McKinley, Chief, Projects Branch 5 610-337-5150 E-mail: Raymond.McKinley@nrc.gov

2 The NRC's annual assessment letter regarding Pilgrim Nuclear Power Station performance during 2013 can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML14063A316. ADAMS is accessible from the NRC website at: http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC' s annual assessment process and the safety performance of Pilgrim Nuclear Power Station, can be found on the NRC's website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html , and contains information regarding visitors and security.

The NRC provides reasonable accommodation to indivi duals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinat ions on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by April 24, 2014, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances. Please confirm the meeting schedule on the NRC website under public meetings.

Approved by:

/RA/ Raymond R. McKinley, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

Agenda

cc w/encl: Distribution via ListServ

ML14098A316 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME JDeBoer/JPD RMcKinley/RRM DATE 03/14/14 04/08/14

Enclosure Agenda NRC's Annual Assessment Meeting Pilgrim Nuclear Power Station May 1, 2014 6:30 p.m. - 8:30 p.m.

Radisson Hotel Plymouth Harbor Mayflower Room

180 Water St Plymouth, MA 02360 Formal Meeting Introduction Discussion of Pilgrim Nuclear Power Station's performance in 2013------. (10 minutes)

Discussion of Pilgrim Nuclear Power Stati on's new or existing pr ograms that are designed to maintain or improve Entergy's current performance-------. (30 minutes)

Break---------------------------------.

(5 Minutes)

NRC to address public questions-----------.----------

(1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 10 min)Closing Remarks ----------------------------.

(5 minutes)