|
---|
Category:Inspection Plan
MONTHYEARML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22011A1322022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML21012A4312021-01-13013 January 2021 Security Inspection Plan ML20017A2672020-01-15015 January 2020 Security Inspection Plan for Pilgrim Nuclear Power Station - 2020 IR 05000293/20180062019-03-0404 March 2019 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2018006) and Confirmatory Action Letter Closure IR 05000293/20180052018-08-28028 August 2018 Assessment Follow-up Letter and Updated Inspection Plan (Inspection Report 05000293/2018005) IR 05000293/20170062018-02-28028 February 2018 Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501) IR 05000293/20170052017-08-28028 August 2017 Quarterly Assessment and Updated Inspection Plan for Pilgrim Nuclear Power Station (Report 05000293/2017005) IR 05000293/20160062017-03-0101 March 2017 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2016006) IR 05000293/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2016005) IR 05000293/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2015006) ML15352A1282015-12-18018 December 2015 Notification of Inspection Procedure 95003 Phase a and Phase B Inspections IR 05000293/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2015005) IR 05000293/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2014001)(w/Inspection Plan) IR 05000293/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Pilgrim Nuclear Power Station (Report 05000293-14-006) IR 05000293/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2013001)(w/Inspection Plan) ML13242A2102013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Pilgrim Nuclear Power Station (Report 05000293-13-006) IR 05000293/20130062013-09-0303 September 2013 Revised Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station (Report 05000293-13-006) IR 05000293/20120012013-03-0404 March 2013 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2012001) ML12248A0752012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Pilgrim Nuclear Power Station IR 05000293/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000293/2011001) ML1124400172011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Pilgrim Nuclear Power Station IR 05000293/20100012011-03-0404 March 2011 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2010001) ML1029100132010-10-18018 October 2010 Pre-Inspection Cover Sheet and Inspection Plan (10/18-10/21/2010) ML1024405932010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Pilgrim Nuclear Power Station ML1019300312010-07-12012 July 2010 Pre-Inspection Cover Sheet and Inspection Plan (7/12 - 7/16/10) ML1006214172010-03-0303 March 2010 Annual Assessment Letter ML0924401172009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station IR 05000293/20090012009-03-0404 March 2009 IR 05000293/09-001, Pilgrim Nuclear Power Station Annual Assessment Letter, Dated March 4, 2009 ML0824702322008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Pilgrim IR 05000293/20080012008-03-0303 March 2008 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293-08-001) ML0734709542007-12-13013 December 2007 ROP 8 - Pilgrim - Change to Inspection Plan, 12/13/07 ML0724309442007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Plant IR 05000293/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Pilgrim Station (IR 05000293-07-001) ML0706703702007-02-15015 February 2007 Pre-Inspection Cover Sheet and Inspection Plan - Pilgrim Nuclear Generating Station; 05000293/2006007 ML0704404302006-10-0606 October 2006 Interview Schedule - Region 1 Inspection ML0626101432006-09-14014 September 2006 Pre-Inspection Cover Sheet and Inspection Plan ML0624304432006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station IR 05000293/20060012006-03-0202 March 2006 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293/2006001) ML0524207072005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Pilgrim Nuclear Power Station ML0506101562005-03-0202 March 2005 Annual Assessment Letter 2005001 - Pilgrim ML0424408492004-08-30030 August 2004 2004 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station ML0406301792004-03-0202 March 2004 2003-04 Annual Assessment Letter - Pilgrim IR 05000293/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 50-293/03-001) IR 05000293/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 50-293/02-001) 2024-01-09
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Inspection Report - Pilgrim - 2013001 |
---|
|
|
Text
arch 4, 2014
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR PILGRIM NUCLEAR POWER STATION (REPORT 05000293/2013001)
Dear Mr. Dent:
On February 11, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Pilgrim Nuclear Power Station. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2013, through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Pilgrim Nuclear Power Station during the most recent quarter was within the Degraded Cornerstone Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because two white performance indicators exist in the initiating events cornerstone. In the third quarter of 2013, the Unplanned Scrams with Complications performance indicator crossed the green to white threshold, which moved Pilgrim Nuclear Power Station from the licensee response column to the regulatory response column. Due to a scram on October 14, 2013, Pilgrim Nuclear Power Station crossed the green to white threshold for a second performance indicator for Unplanned Scrams per 7000 Critical Hours. When your staff notifies the NRC of your readiness, the NRC will conduct a supplemental inspection to review the actions taken to address the performance issues. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area.
The NRC evaluates cross-cutting themes to determine whether a substantive cross-cutting issue exists in a particular area and to encourage licensees to take appropriate actions before more significant performance issues emerge. The NRC identified a cross-cutting theme in the Problem Identification and Resolution area. Specifically, the NRC identified four findings with a documented cross-cutting aspect of P.1(d) - Timeliness of Corrective Actions. The NRC determined that a substantive cross-cutting issue associated with P.1(d) does not exist because the theme was identified at the end of the assessment period and Entergy has not had sufficient time to evaluate the theme. Entergy has recognized the cross-cutting theme and entered it into the corrective action program. The NRC will evaluate corrective actions once Entergy has had time to evaluate the theme and implement corrective actions. Currently, the NRC does not have a concern with your staffs scope of effort and progress in addressing the cross-cutting theme. The NRC will continue to monitor your staffs effort and progress in addressing the theme until the theme criteria are no longer met.
You should also be aware that the NRC plans to conduct a public meeting with you in which we will review station performance. During this meeting, in accordance with Inspection Manual Chapter (IMC) 0305, you will be given the opportunity to respond to any information contained in the annual assessment letter and to present any new or existing programs that are designed to maintain or improve current performance.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year (CY) 2014 will reflect this revision to IMC 0310. The CY 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305. The cross-cutting theme/substantive cross-cutting issue in the Problem Identification and Resolution area identified during this assessment period will be carried forward to the mid-cycle assessment period using the revised terminology.
The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform IP 92702, Followup on Corrective Actions for Violations and Deviations, IP 60854.1, Preoperational Testing of an Independent Spent Fuel Storage Facility Installations at Operating Plants, IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, and IP 60856.1, Review of 10 CFR 72.212(b) Evaluations. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Raymond McKinley at (610)337-5150 with any questions you have regarding this letter.
Sincerely,
/RA DCLew for/
William M. Dean Regional Administrator Docket No: 50-293 License No: DPR-35 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ
ML14063A316 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/ORA NAME EKeighley/EMK RMcKinley/RRM MScott/EJB for WDean/DCL for DATE 2/27/14 2/27/14 2/28/14 3/4/14
Page 1 of 2 Pilgrim 02/27/2014 09:18:48 Inspection / Activity Plan Report 22 01/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 2/24 EXM - PILGRIM INITIAL OL EXAM 4 1 01/27/2014 01/31/2014 U01876 FY14-PILGRIM INITIAL OPERATOR LICENSING EXAM 1 02/24/2014 02/28/2014 U01876 FY14-PILGRIM INITIAL OPERATOR LICENSING EXAM 71124 - 01-EXPOSURE CONTROL, 02-ALARA & 06 GWPP 1 1 02/18/2014 02/21/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 02/18/2014 02/21/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 02/18/2014 02/21/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment ISFSI - ISFSI CRANE INSPECTION 2 1 03/24/2014 03/28/2014 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI EP EXER - EP EXERCISE INSPECTION 2 1 04/28/2014 05/02/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event CDBI - CDBI 6 1 05/19/2014 05/23/2014 IP 7111121 Component Design Bases Inspection 1 06/02/2014 06/05/2014 IP 7111121 Component Design Bases Inspection 1 06/16/2014 06/20/2014 IP 7111121 Component Design Bases Inspection 71124 - 05 RAD MONITORING INSTRUMENTATION 1 1 06/09/2014 06/12/2014 IP 71124.05 Radiation Monitoring Instrumentation ISFSI - DRY RUN & INITIAL ISFSI INSPECTION 3 1 09/01/2014 09/19/2014 IP 60854 Preoperational Testing Of An ISFSI 1 09/01/2014 09/19/2014 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1 09/01/2014 09/19/2014 IP 60855 Operation Of An ISFSI 1 09/01/2014 09/19/2014 IP 60856 Review of 10 CFR 72.212(b) Evaluations 1 09/01/2014 09/19/2014 IP 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants 1 09/22/2014 09/26/2014 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124 - 71151 03 AIRBORNE CONTROL 04 DOSE ASSESS 1 1 11/03/2014 11/06/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 11/03/2014 11/06/2014 IP 71124.04 Occupational Dose Assessment 1 11/03/2014 11/06/2014 IP 71151 Performance Indicator Verification 71124 - 01 EXPOSURE CONTROL 02 ALARA 1 1 03/02/2015 03/05/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/02/2015 03/05/2015 IP 71124.02 Occupational ALARA Planning and Controls 7111108G - INSETRVICE INSPECTION 1 1 03/30/2015 04/03/2015 IP 7111108G Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Page 2 of 2 Pilgrim 02/27/2014 09:18:48 Inspection / Activity Plan Report 22 01/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124.08 - RADWASTE 1 1 04/06/2015 04/10/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - 01 EXPOSURE 02 ALARA 03 AIRBORNE 04 DOSE 1 1 05/04/2015 05/08/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 05/04/2015 05/08/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 05/04/2015 05/08/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/04/2015 05/08/2015 IP 71124.04 Occupational Dose Assessment 71124 - RADIOACTIVE EFFLUENT CONTROL RETS 1 1 06/22/2015 06/26/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure