MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A1022024-04-0101 April 2024 Alternative Request IR-4-13, Proposed Alternative Request to Support Steam Genera Tor Channel Head Drain Modification 2024-09-04
[Table view] Category:License-Operator
MONTHYEARML24281A1102024-10-0707 October 2024 Requalification Program Inspection ML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A1362022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Operating Test ML22336A1112022-12-0202 December 2022 U2 - Proposed Operating Test ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22336A0932022-12-0202 December 2022 U2 - Proposed Written Examination ML22336A1262022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Written Exam ML22313A0352022-11-0909 November 2022 U2 - Post Exam Comments and Technical References ML22312A5222022-11-0808 November 2022 U2 - Administered Written Examination with Answer Key ML22312A5292022-11-0808 November 2022 U2 - Administered Operating Test ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML23003A7672022-09-30030 September 2022 U2 - Handouts to Applicants (Folder 3) ML23003A7792022-09-30030 September 2022 U2 - Administered Written Examination and Operating Test Outlines (Folder 3) ML23003A7862022-09-30030 September 2022 U2 - Proposed Written Examination and Operating Test Outlines (Folder 2) ML23003A7692022-09-21021 September 2022 U2 - Miscellaneous Exam Material (Folder 3) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML21105A6502021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A1592020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML19120A3112019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19064B3922019-03-0505 March 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE 2024-10-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A1362022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Operating Test ML22336A1112022-12-0202 December 2022 U2 - Proposed Operating Test ML22336A0932022-12-0202 December 2022 U2 - Proposed Written Examination ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22336A1262022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Written Exam ML22313A0352022-11-0909 November 2022 U2 - Post Exam Comments and Technical References ML22312A5292022-11-0808 November 2022 U2 - Administered Operating Test ML22312A5222022-11-0808 November 2022 U2 - Administered Written Examination with Answer Key ML23003A7862022-09-30030 September 2022 U2 - Proposed Written Examination and Operating Test Outlines (Folder 2) ML23003A7672022-09-30030 September 2022 U2 - Handouts to Applicants (Folder 3) ML23003A7792022-09-30030 September 2022 U2 - Administered Written Examination and Operating Test Outlines (Folder 3) ML23003A7692022-09-21021 September 2022 U2 - Miscellaneous Exam Material (Folder 3) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) 2023-02-09
[Table view] Category:License-Operator
MONTHYEARML24281A1102024-10-0707 October 2024 Requalification Program Inspection ML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A1362022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Operating Test ML22336A1112022-12-0202 December 2022 U2 - Proposed Operating Test ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22336A0932022-12-0202 December 2022 U2 - Proposed Written Examination ML22336A1262022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Written Exam ML22313A0352022-11-0909 November 2022 U2 - Post Exam Comments and Technical References ML22312A5222022-11-0808 November 2022 U2 - Administered Written Examination with Answer Key ML22312A5292022-11-0808 November 2022 U2 - Administered Operating Test ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML23003A7672022-09-30030 September 2022 U2 - Handouts to Applicants (Folder 3) ML23003A7792022-09-30030 September 2022 U2 - Administered Written Examination and Operating Test Outlines (Folder 3) ML23003A7862022-09-30030 September 2022 U2 - Proposed Written Examination and Operating Test Outlines (Folder 2) ML23003A7692022-09-21021 September 2022 U2 - Miscellaneous Exam Material (Folder 3) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML21105A6502021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A1592020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML19120A3112019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19064B3922019-03-0505 March 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE 2024-10-07
[Table view] Category:Requalification Program Audit
MONTHYEARML24281A1102024-10-0707 October 2024 Requalification Program Inspection ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML17278A1582017-10-0404 October 2017 Requalification Program Inspection - Millstone Power Station, Unit 3 ML16286A0292016-10-11011 October 2016 Requalification Program Inspection - Millstone Power Station, Unit 2 2024-10-07
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 October 11, 2016 Mr. Daniel G. Stoddard President and Chief Nuclear Officer
Dominion Resources 5000 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - MILLSTONE POWER STATION, UNIT 2
Dear Mr. Stoddard:
In a telephone conversation on September 29, 2016, Mr. Peter Presby, Senior Operations Engineer, and Mr. Dan Brown, Operator Requalification Training Supervisor, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Millstone Power Station, Unit 2 facility. The inspection is planned for the week of October 31, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC ma y request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by October 24, 2016. Mr. Brown has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),
U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic
mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with
10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Peter Presby at (610) 337-5392.
Sincerely, /RA/ Donald E. Jackson, Chief
Operations Branch
Division of Reactor Safety Docket No. 50-336 License No. DPR-65
cc: Distribution via ListServ
ML16286A029 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME PPresby DEJackson DATE 10/4/16 10/11/16