Category:Letter
MONTHYEARML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23334A2242023-11-30030 November 2023 Request for Exemption from Enhanced Weapons Firearms Background Checks, and Security Event Notifications Implementation ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23317A2702023-11-13013 November 2023 Core Operating Limits Report, Cycle 23 IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 ML23298A1652023-10-26026 October 2023 Requalification Program Inspection IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) ML23248A2132023-08-30030 August 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. ML23242A0142023-08-30030 August 2023 Operator Licensing Examination Approval ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits IR 05000336/20230022023-08-0909 August 2023 Integrated Inspection Report 05000336/2023002 and 05000423/2023002 ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000336/20234012023-07-17017 July 2023 Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23159A2202023-06-0808 June 2023 Associated Independent Spent Fuel Storage Installation Revision to Emergence Plan - Report of Changes IR 07200047/20234012023-06-0808 June 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 2024-01-04
[Table view] Category:License-Operator
MONTHYEARML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML21105A6502021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A1592020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML19120A3112019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19064B3922019-03-0505 March 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18074A3602017-10-30030 October 2017 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML18074A3612017-10-15015 October 2017 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) 2023-02-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18074A3602017-10-30030 October 2017 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML18074A3612017-10-15015 October 2017 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML18074A3642017-09-0707 September 2017 Draft Written Exam (Folder 2) ML18074A3652017-08-25025 August 2017 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML18074A3622017-06-27027 June 2017 Draft - Operating Outlines (Folder 2) ML18074A3632017-05-23023 May 2017 Draft - Written Outlines (Folder 2) ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17103A0402017-04-12012 April 2017 Senior Reactor and Reactor Operator Initial License Examinations - Millstone Power Station, Unit 3 ML17087A0862017-03-23023 March 2017 Final Qa/Related Forms (Folder 1) ML17087A0882017-03-10010 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17087A0872017-03-10010 March 2017 Miscellaneous (Folder 1) 2023-02-09
[Table view] Category:License-Operator
MONTHYEARML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML21105A6502021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A1592020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML19120A3112019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19064B3922019-03-0505 March 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18074A3602017-10-30030 October 2017 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML18074A3612017-10-15015 October 2017 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) 2023-02-09
[Table view] Category:Requalification Program Audit
MONTHYEARML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML17278A1582017-10-0404 October 2017 Requalification Program Inspection - Millstone Power Station, Unit 3 ML16286A0292016-10-11011 October 2016 Requalification Program Inspection - Millstone Power Station, Unit 2 2023-10-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 October 11, 2016 Mr. Daniel G. Stoddard President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - MILLSTONE POWER STATION, UNIT 2
Dear Mr. Stoddard:
In a telephone conversation on September 29, 2016, Mr. Peter Presby, Senior Operations Engineer, and Mr. Dan Brown, Operator Requalification Training Supervisor, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Millstone Power Station, Unit 2 facility. The inspection is planned for the week of October 31, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by October 24, 2016.
Mr. Brown has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),
U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic
D. Stoddard mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Peter Presby at (610) 337-5392.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65 cc: Distribution via ListServ