ML17208A992

From kanterella
Revision as of 19:20, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Aug 1980
ML17208A992
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 09/06/1980
From: SCHMIDT A D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML17208A993 List:
References
NUDOCS 8009170279
Download: ML17208A992 (21)


Text

'/ACCESS IOiV"EBB F AC IL: 50 250 50-251 50 335 AU TH~tlAHE SCHt'.IDTE A~D~REC IP~4A'<E REGULA'RY INFOR lATION OISTRIBUTIO SYSTE'l (R[DS):8009170279 OOC.DATEs 80/09/06 NOTARIZED:

No DOCKET 4 Turkey Point Planti Unit 3E Florida Power and Light C 05000250 Turkey Point Planti Unit 4E Florida Power and Light C 05000251 St~Lucie Planti Unit 1E Florida Power 8 Light Co~0 AUTHOR AFFILIATION Florida Power 8 Light Co~RECIP IEVT AFF ILIAT IOV Office of'4lanagement and Program Analysis SUBJECT;Forwards monthly ooeratina reots for Aug 1980'ISTR ISUTIO I CODE;AOOSS COPIES RECEIVED;LTR

/EVCL J'IIE: TITl.E: Annual'emi Annus'l,i, Monthly Ooerating Reoorts (OL Stag NOTESt RECI~!EV T ID C3OE/VA'1E ACTIOiv.'ARGAE S~04 INTERNAl.:

AEOO OIR HU" FAC 08 R)A 13 EX EVAL BR09 REG F II.E 01 COPIES LTTR ENCL 7 7 1 1 1 1 2 2 1 1 1 1 REC I P IEVT IO CODE/NAvTE CLARKERD 04 D/9 IR g AU~i F AC07 ICE 06 NRC POR 02 OR ASSESS BR 10 CUTIES LTTR ENCL 7 7 1 1 2 2 1 1 1, 1 UTERI'vAL; ACRS LPDR 03 B R O:3 I','H A V E V VSIC 05 1 1 1'gy gs~s~o TJ'I KL y J""E 1=CI=OS RRE i.ll l=D: LT T"~EVCL

()/Of~i)

P.O.BOX 529100, MIAMI, FL 33162 yllgi',:.i:~.i5:-,=Ji A~eiXi FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U.S.Regulatory Commission Washington, D.C.20555 Gentlemen:

Attached are the August, 1980, Operating Status Reports for Turkey Point Unit Nos.3 and 4.and St.Lucie Unit No.l.Very truly yours, A.D.Schmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire/DOER'i 1o~~/PEOPLE...SERVING PEOPLE I 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.*COMPLETED II Y V.T.Chilson TELEPHONE MONTH AUGUSTA 1980 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I 643 639 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)653 l7 IS l0 l3 l4 IS 16 INSTRUCTIONS 63 637 646 503 664 658 655 658 656 656 656 649 656 19 20 12 23 24 25 26 27 2S 29 30 31 NOTE: 647 653 647 652 657 652 642 643 644 648 Average daily power level greater than 646 MWe due to cooler condenser cooling water.On this format.list the average daily unit power (evel in MWe Net for each day in the reporting ntonth.Compute to the nearest whole megawatt.(')(77)

.OPERATING DATA REPORT'OPERATING STATUS Turke'oint Unit No.3 760 693 680 1.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): DOCKET NO.oATE SeSs~.980.COMPLETED BY J~~hilson TELEPHONE 4851~2-3824 Notes-Unit No.3 operated at approximately 1008 R.P.>except for outage of Aug.6-7, 1980 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: Maximum De endable Ca acit Gross MWe has been rerated to the mbst restricted seasonal conditions (summer)experienced.

Maximum Dependable Capacity (Net MWe)has been rerated accordingly.

9.Power Level To Which Restricted.

If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr:to-Date 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical~13.Reactor Reserve Shutdown Hours 14.Hours Generator On.Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Ge'nerated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months 744.0 4 979.7 0 4 809.4 737.9 1 613 090 10"410 368 3 275 415 503 570 3 104 278 478 174 82.1 99.2 99.2 82.1 99.5'2.1 76.5 0.8 1.3 (Type, Date, and Duration of Each): P o ram-Oct.5-Nov.1 1980.Cumulative 7 6 6 52 249.2 213.4 50 499;6 121.8 101 879 002 32 356 415 30 626 372 74.4 74.6 70.2 65.1 2.5 25.If Shut Down At End Of Report Period, Esthnated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77)

O.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO.50-250 No.Date Vl~J L rl IA Q Q~Q~CA Liccnscc Event Report-4l Cl'n cn G R~Q CI O Cr Cause 4 Corrective Action to Prevent Recurrence 16 80-08-06 F 6.1: N/A CB MOTOR X Unit No.3 was removed from service due to low oil level in reactor coolant pump motor No.3C.Cor-rective actions included adding oil.(Nuclear System)F: Forced S: Scheduled<9 30 31 634 635 634 635 636 638 640 642 634 630 632 636 INSTRUCTIONS On this format.list the'average daily unit I>>>wer levt.l in MWe.Net for each day i>>the reporting>n>>nth.C>>n>pute to the nearest whole megawat t.('t(77)

OPERATING DATA REPORT DOCKET NO.~~2L DATE M~~980 COMPLETED BY 2LZ~~son TELEPHONE OPERATING STATUS Notes-Unit No.4 operated at approximately 100%R.P.1.Unit Name: Turke Point Unit No.4 Reporting Period AU ust 1980 3.I.icensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): e~7.Maximum De ndable Ca acit Net MWe: 646 conditions summer ex erienced.Maximum De endable Ca acit Net MWe has been p y()8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: Maximum De endable Ca acit (Grass MWe)has been rerated to the most restricted seasonal rerated accordingly.

9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: NONE This Month Yr.-to-Date Cumula tive 6X 584.0 744.0 5 3 9.166.6-0-43 627;3 31'90.848 116-0-1 633 024 28 900 833 2 5 70.8 70.9 69.0 64.1 3.0 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 12 03 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 12.3 16.Gross Thermal Energy Ge'nerated (MWH)9 629 136 17.Gross Electrical Energy Generated (MWH)2 997 355 19.Unit Service Factor 75.9 20.Unit Availability Factor 100.076.1 21.Unit Capacity Factor (Using MDC Net)98'.6"75.1 22.Unit Capacity Factor (Using DER Net)92.0 70.0 23.Unit Forced Outage Rate-0-0.3 24.Shutdowns Scheduled Over Next 6 Months(Type, Date, and Duration of Each): maintenance and ins ections-Nov.9 1980-Jan.10, 1981.25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (lp/77) r UNIT SHUTDOWNS AND POWER REDUCTIONS nit No.4 REPORT hiONTH AUGUST, 1980 305 552-82 No.Date Ih 4 A J a~C/7$Liccnscc Event Report~i~CP 4)o~G CJ~CJ Q C~Cause&Corrective Action to Prevent Recurrence N 0 N F: Forced S: Schedu!ed (')/77)Reason: A.Equipment Failure (Explain)B.Maintenance or Test C-Refueling.

D.Regulatory Restriction EZperator Training&.License Examination F-Administrative G-Operational Error (Explain)II.Other (Explain)Method: I-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-OI 6 I)Exlwbrt I-Same Source AVERAGE DAII.Y UNIT POWER LEVEL DOCKET NO.St.Lucre II"-"" COMPLETEDIIY V-T.Chilson MONTH AUGUST 1980 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I 75 794 796 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 18 673 19 787 10 11 13 14 15 16 INSTRUCTIONS 77 770 792 791 790 791 798 797 718 126 255 394 20 21 22 23 24 25 26 27 28 30 31 NOTE: 786 725 783 78 782 757 759 781 779 780 749 Average daily power level greater than 777 MWe due to cooler condenser cooling water.On this format.list the average daily unit power level in MWe.Net for each day in the reporting month.Compute to the nearest whole megawatt.I')/77)

OPERATING STATUS OPERATING DATA REPORT DOCKETNO.~~DATE MI~~980 COMPLETED BY T Chilson TELEPHONE 05 552-3824 St.Lucie Unit No.1 2560 850 802 l.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): 22 Notes-Unit operated at approximately 100%R.P., except for outages of Aug.14, 14-15, and 16-18, 1980, and reduced load operation of Aug.14-18, 1980.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.

If Any (Net MWe): 10.Reasons For Restrictions, If Any: NONE This Month Yr:to-Date 5 855.0 4 0.2-0-3 889.7 7.3 3 101 490 2 915 036 66.4 64;1 62.1 11.Hours In Reporting Period 744.0 12.Number Of Hours Reactor Was Critical 720.0 13.Reactor Reserve Shutdown Hours-0-~14.Hours Generator On-Line 701.4 15.Unit Reserve Shutdown Hours 7~3 17.Gross Electrical Energy Generated (MWH)551 240 18.Net Electrical Energy Generated (MWH)519 201 19.Unit Service Factor 94.3 20.Unit Availability Factor 22.Unit Capacity Factor (Using DER Net)87.0 23.Unit Forced Outage Rate-0-24.Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each): Cumulative 32 399.0-2 129.5 24 719;7 39.3 19 395 990 18 242 932 76.3 72.5'70.2 6.4 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):

N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77)

Page 1 of 2 80 UNIT SHUTDOWNS AND POWER REDUCTIONS 552-3824 DOCKET NO.l30Sl-No.l No.I Q~tS c 5 tx.'C/I Llccllscc Event Rcport-Cl C~Q Cr Cause&Corrective Action to Prevent Recurrcncc 80-08-14 S 10.7 A N/A EG TRANSF Unit was removed from service to isolate main power transformer No.1B to repair oil leak.Cor-rective actions included installing new bushing.(Non-nuclear system)12 80-08-14-0-B N/A EG TRANSF Load was limited to the capacity of main transformer No.1A.(Non-nuclear system)13 80-08-14 7.3*F N/A EG TRANSP Unit was removed from service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No.1B.(Non-nuclear system)I F: Forced S: Schedu!ed ('I/77)Reason: A-Equipment Failure (Explain)B-Maintenance oi Test.C.Refueling D Regulatory Restriction E-Operator Training Sc Liccnsc Examination F-Administrative G-Operational Error (Explain)II-Other (Explain)3 Method: I-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets Ior Licensee Event Report (LER)File (NUREG-016I)Exhibit I-Same Source UNIT SHUTDOWNS AND POWER REDUCTIONS Page 2 of 2 80*COMPLETED BY I-"'-'Ni).rl MI l J Llcenscc Event Report=CP CJ MI cn G C o~E~Cause Ec Corrective Action to Prevent Recurrence 14 80-08-'17'24.6-B N/A EG TRANSF Unit was removed from service to install new bushing'and return main power transformer No.1B to service.(Non-nuclear system)F: Forced S: Scheduled ('>/77)Reason: A.Equipment Failure (Explain)B-hlaintenance or Test.C-Refueling D Regulatory Restriction E-Operator Training Ec License Examination F-Administrative G-Operational Error (Explain)H-Other (Explairt) h(ethod: I-Manual 2-h(anuai Scram.3-Automatic Scranl.4-Other (Explain)Exhibit G-Instructions

.for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG.OI 6I)Exhibit I-Salnc Source P.O.BOX 529100, MIAMI, FL 33162+<Illy~l,==FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U.S.Regulatory Commission Washington, D.C.20555 Gentlemen:

Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.l.Very truly yours, D.Schmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire PEOPLE...SERVING PEOPLE

'L

.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-250 Turkey Point UNIT Unit No.3 DATE Se t.6, 1980 COMPLETED BY V..T.Chilson REPORT MONTH AUGUST, 1980 TELEPHONE (305)552-.3824 Unit No.3 operated at approximately 100%R.P., except for outage of Aug.6-7, 1980.Refer to"Unit Shutdowns and'ower Reductions" section of August, 1980, Operating Status Report for additional infor-mation.Major Safety-'related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power a Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and.NRC for ad-ditional information.

.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-'251 Turkey Point UNIT Unit No.4 DATE Sept.6, 1980 COMPLETED BY V.T.Chilson REPORT MONTH AUGUST 1980 TELEPHONE (305)552-3824 Unit No.4 operated at approximately 100%.R.P.Refer to"Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.

Major Safety-related maintenance activities performed duning the month included: Inspections and requirements of IE Bulletins and NUREG-0578 in progress.Florida Power a Light Company commitments for NUREG-'0578 implementation are continuning.

Refer to correspondence between FPL and NRC for ad-ditional information.

.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-335 St.Lucie UNIT Unit No.1 DATE Se t.6 1980 COMPLETED BY TELEPHONE V.T.Chilson ('305)552-3824 REPORT MONTH Unit operated at approximately 100%R.P., except for outages of August 14, 14-15, and 16.-18, 1980, and reduced load operation of August 14-18, 1980.Refer to"Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power 6 Light Company Commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.