ML121070222
Letter Sequence Acceptance Review | |
---|---|
TAC:ME7905, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME7905, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) | |
Initiation Administration
| |
MONTHYEARML12040A0732011-10-31031 October 2011
[Table View]0000-0101-7647-R3, Columbia Generating Station Plant-Specific Responses Required by Numac Prnm Retrofit Plus Option III Stability Trip Function Topical Report, (NEDC-3241 OP-A) Project stage: Request ML12040A0752011-11-30030 November 2011 NEDO-33690, Revision 0, Columbia Generating Station Power Range Neutron Monitoring System Response Time Analysis Report Project stage: Request ML12040A0762012-01-31031 January 2012 NEDO-33694, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Diversity and Defense-in-Depth (D3) Analysis Project stage: Request GO2-12-017, License Amendment Request to Change Technical Specification in Support of Prnm/Arts/Mellla Implementation2012-01-31031 January 2012 License Amendment Request to Change Technical Specification in Support of Prnm/Arts/Mellla Implementation Project stage: Request ML12040A0772012-01-31031 January 2012 NEDO-33697, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Analysis Report Project stage: Request ML12040A0792012-01-31031 January 2012 NEDO-33698, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection. Enclosure 2, Attachment 14 to List of Commitments and Enclosure 3 Are Project stage: Request ML12040A0802012-01-31031 January 2012 NEDO-33507, Revision 1, Columbia Generating Station Aprm/Rbm/Technical Specifications / Maximum Extended Load Line Limit Analysis (Arts/Mellla) Project stage: Request ML12040A0742012-01-31031 January 2012 NEDO-33685, Revision 1, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function Project stage: Request ML1210702222012-04-16016 April 2012 Acceptance Review Email, License Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Acceptance Review ML1216704012012-06-15015 June 2012 E-mail, Draft Request for Additional Information, Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mella Project stage: Draft RAI ML1216704042012-06-15015 June 2012 Draft Request for Additional Information, Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI ML1219301002012-07-10010 July 2012 Email, Draft Request for Additional Information, Round 2, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI ML1219301042012-07-10010 July 2012 Draft Request for Additional Information, Round 2, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI ML12201B0502012-07-23023 July 2012 Request for Additional Information, Rounds 1 and 2, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML12192A3252012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 10/31/11 Executed by E. Schrull, GE Hitachi Americas LLC, 0000-0101-7647-R3 Plant-Specific Responses Required by NEDC-32410P-P-A Project stage: Withholding Request Acceptance ML12192A4542012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33694P, Revision 1 Project stage: Withholding Request Acceptance ML12192A5352012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33697P, Revision 1 Project stage: Withholding Request Acceptance ML12192A4332012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/11, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33690P, Revision 0 Project stage: Withholding Request Acceptance ML12192A5892012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33698P, Revision 1 Project stage: Withholding Request Acceptance ML12192A3612012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12 Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33685P, Revision 1 Project stage: Withholding Request Acceptance ML12193A1092012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/27/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33507P, Revision 1 Project stage: Withholding Request Acceptance GO2-12-105, Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-337582012-07-31031 July 2012 Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-33758 Project stage: Request GO2-12-116, Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla2012-08-22022 August 2012 Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla Project stage: Response to RAI ML12249A0112012-09-0505 September 2012 Redacted, Request for Additional Information, Amendment Request for Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML12261A1972012-09-17017 September 2012 Email, Draft Request for Additional Information, Round 4, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI GO2-12-135, Response to Request for Additional Information Regarding License Amendment Request to Implement Prnmiarts/Mellla2012-10-0505 October 2012 Response to Request for Additional Information Regarding License Amendment Request to Implement Prnmiarts/Mellla Project stage: Response to RAI ML12283A2692012-10-15015 October 2012 Request for Additional Information, Round 4, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Prnm/Arts/Mellla Project stage: RAI ML12328A0782012-10-31031 October 2012 NEDO-33751, Revision 3, Columbia Generating Station Power Range Neutron Monitoring System Reliability Analysis, Attachment 3 Project stage: Request GO2-12-162, Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla2012-11-12012 November 2012 Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla Project stage: Response to RAI ML12192A4812012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, Affidavits Dated 11/16/11 and 7/26/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33696P, Revisions 0 and 1 Project stage: Withholding Request Acceptance ML12229A4682012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/4/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33750P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4762012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33753P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4802012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33754P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4822012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/27/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33756P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4832012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33758P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4902012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/12/12 Affidavit Executed by E. Schrull, GEH-Hitachi, Letter GE-MS-CT-106244-JC14 Project stage: Withholding Request Acceptance ML12328A0792012-11-30030 November 2012 NEDO-33789, Revision 0, Numac Power Range Neutron Monitoring Components 268X1331TCG001, 268X1332TCG001, G002 268X1333TCG001, Qualification Summary for Energy Northwest (Enw) Columbia Generating Station (Cgs), Attachment 5 Project stage: Request ML12229A4712012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, 6/29/12 and 10/22/12 Affidavits Executed by E. Schrull, GEH-Hitachi, NEDC-33751P, Revisions 2 and 3 Project stage: Withholding Request Acceptance ML12345A3662012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/12 Executed by E. Schrull, GEH-Hitachi, NEDC-33789P, Revision 0 Project stage: Withholding Request Acceptance ML12345A3582012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, 9/26/12 Affidavit Executed by E.Schrull, GEH-Hitachi, GEH 10/5/12 Responses to Nrc/De/Eicb 9/5/12 Request for Additional Information Project stage: RAI ML13015A2722012-12-31031 December 2012 NEDO-33685, Rev 2, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function. Project stage: Request ML13015A2732012-12-31031 December 2012 NEDO-33698, Rev 2, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection Project stage: Request ML13025A3512013-02-21021 February 2013 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/12/12, Executed by L. Dolan, GE Hitachi Americas LLC, NEDC-33685P, Revision 2 Project stage: Withholding Request Acceptance ML13025A3612013-02-21021 February 2013 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/12/12, Executed by L. Dolan, GE Hitachi Americas LLC, NEDC-33698P, Revision 2 Project stage: Withholding Request Acceptance ML13067A1062013-03-12012 March 2013 Redacted, Request for Additional Information, Round 5, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML13098A7782013-04-0808 April 2013 Request for Additional Information Following 4/3/13 Calculation Audit, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML13099A0432013-04-10010 April 2013 Request for Additional Information Following 4/3/13 Calculation Audit, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI GO2-13-059, Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla2013-04-11011 April 2013 Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla Project stage: Response to RAI PNP 2013-038, 2012 Annual Radioactive Effluent Release and Waste Disposal Report2013-04-23023 April 2013 2012 Annual Radioactive Effluent Release and Waste Disposal Report Project stage: Request ML13109A1632013-04-26026 April 2013 Request for Withholding Information from Public Disclosure - 4/2/13 and 4/10/13 Affidavits Executed by L. Dolan, GEH; Enclosures 1 and 3 of Geh'S Request for Additional Information Responses Project stage: RAI 2012-07-10 |
ML121070222 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 04/16/2012 |
From: | Thadani M C Plant Licensing Branch IV |
To: | Dunham Z K Energy Northwest |
Thadani, M C, NRR/DORL/LP4, 415-1476 | |
References | |
TAC ME7905 | |
Download: ML121070222 (2) | |
Similar Documents at Columbia | |
---|---|
Category:Acceptance Review Letter
MONTHYEARML24089A2282024-04-15015 April 2024
[Table view]– Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML21032A2872021-02-0808 February 2021 Acceptance Letter for On-Site Cooling System Sediment Disposal Request ML19133A2032019-05-0707 May 2019 Acceptance Review for EPID L-2019-LLA-0068 Columbia 2.C(11) LAR ML19129A1822019-03-26026 March 2019 Acceptance Review for (EPID L-2019-LLA-0034) Control Room HVAC Change LAR ML16243A3662016-09-0101 September 2016 Acceptance of Requested Licensing Action Measurement Uncertainty Recapture ML13266A0302013-09-23023 September 2013 Acceptance Review Email, Request to Adopt TSTF-477, Revision 3, Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystem, Using Consolidated Line Item Improvement Process ML1213904702012-05-18018 May 2012 Acceptance Review Email, Request for One-time Exemption from 10 CFR 50.36a(a)(2) Submittal Date for Radioactive Effluent Release Report ML1210702222012-04-16016 April 2012 Acceptance Review Email, License Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla ML1205200362012-02-19019 February 2012 Acceptance Review Email, License Amendment Request, Administrative and Editorial Changes to Technical Specifications Related to Change in Software and to Adopt TSTF-GG-05-01 Revision 1 Writer'S Guide ML1109803882011-04-0808 April 2011 Acceptance Review Email, License Amendment Request, Administrative Changes to Delete or Modify Expired License Conditions ML1031304742010-11-0909 November 2010 Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.1.7, Standby Liquid Control (SLC) System, to Support Increase in Boron-10 Enrichment ML1025905992010-09-16016 September 2010 Acceptance Review ML1022103722010-08-0909 August 2010 Acceptance Review for License Amendment Request Re Approval of Cyber Security Plan ML1013701432010-05-17017 May 2010 Acceptance Review for License Amendment Request, Revise Technical Specifications Relating to Traversing In-Core Probe Containment Isolation Valve Instrumentation ML1010203852010-04-12012 April 2010 Acceptance Review ML1008104172010-03-22022 March 2010 Acceptance Review Email, License Amendment Request, Revise Technical Specification (TS) 3.1.3, Control Rod Operability, and TS 3.1.5, Control Rod Scram Accumulators ML0909800262009-04-0808 April 2009 E-Mail Acceptance Review for License Amendment Request 2024-04-15 Category:E-Mail MONTHYEARML24215A3672024-08-0101 August 2024
[Table view]NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24183A2392024-07-0101 July 2024 NRR E-mail Capture - LIC-109 Acceptance - Columbia Generating Station - Relief Request for the Fourth Ten-Year Interval Inservice Testing - EPID L-2024-LLR-0039 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24103A2022024-04-0909 April 2024 EN 57068 - Transco Products Inc Part 21 Initial Notification of Unverified Critical Characteristics of Darmatt KM-1 Flat Board ML24060A1022024-02-28028 February 2024 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2023 Biological Monitoring Report ML24053A0092024-02-21021 February 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs L-2024-LLR-0007 Through 00013 ML24008A0022024-01-0505 January 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation - EPID L-2023-LLA-0170 ML23278A0042023-10-0404 October 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID L-2023-LLA-0128 ML23275A0092023-09-29029 September 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Tech Specs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID: L-2023-LLA-0128 ML23150A2502023-05-26026 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - License Amendment Request to Clean-Up Operating License and Appendix a, Technical Specifications - EPID L-2023-LLA-0062 ML23124A2412023-05-0404 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise TS to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position - EPID L-2023-LLA-0063 ML23124A0062023-05-0303 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise Tech Specs to Adopt TSTF-541, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2023-LLA-0063 ML23065A0422023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Biological Monitoring Report ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22349A2002022-12-0101 December 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Priority Pollutant Discharge Monitoring Report ML22312A0042022-11-0707 November 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Fourth 10 Year ISI RR 4ISI-11 - EPID L-2022-LLR-0071 ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22256A2002022-09-13013 September 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22241A0182022-08-26026 August 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22210A0072022-07-28028 July 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22173A0682022-06-17017 June 2022 Email Concurrence on SE Input for Columbia Pltr LAR ML22166A4122022-06-15015 June 2022 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise TS to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2022-LLA-0081 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22075A3392022-03-15015 March 2022 NRR E-mail Capture - Columbia Generating Station - Audit Questions - Regulatory Audit of License Amendment Request to Adopt 50.69 - Categorization Process - EPID L-2021-LLA-0207 ML22067A0132022-03-0707 March 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request to Adopt TSTF-505, Revision 2, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4b - EPID L-2022-LLA-0023 A002515, NRR E-mail Capture - (External Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report2022-01-12012 January 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report ML21348A1852021-12-14014 December 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors - EPID L-2021-LLA-0207 ML21335A0182021-11-30030 November 2021 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Requested Licensing Action - License Amendment Request to Change TS 3.4.11 Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21162A3062021-06-11011 June 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement - EPID L-2021-LLA-0084 ML21137A0012021-05-14014 May 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21109A2762021-04-0808 April 2021 Email Request for Information for Columbia Generating Station'S PIR Inspection_Redacted ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML21036A2932021-02-0404 February 2021 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2020 Biological Monitoring Report ML20357B1502020-12-22022 December 2020 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request - Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Rev. 2 - EPID L-2020-LLA-0259 ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20314A0452020-11-0606 November 2020 NMFS to Energy Northwest, Entrainment Study Results for Columbia Generating Station ML20297A3032020-10-22022 October 2020 NRR E-mail Capture - LIC-109 Acceptance Review of License Amendment Request for Columbia - Application to Revise Tech Specs to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements - EPID L-2020-LLA-0212 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20265A3242020-09-20020 September 2020 Email 9-20-2020 - Req_ Kick-Off Call Columbia Generating Station RFI Provided for Roll-Back EP Program Inspection (Week of Nov 2 2020) ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20136A0112020-05-14014 May 2020 NRR E-mail Capture - Acceptance Columbia Relief Request ISI Reactor Pressure Vessel Feedwater Nozzles, 4ISI-09 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20090F5532020-03-30030 March 2020 NRR E-mail Capture - Accepted: Columbia Relief Request, EPID: L-2020-LLR-0035 2024-08-01 |
Text
From: Thadani, Mohan Sent: Monday, April 16, 2012 8:23 AM To: Dunham, Zachary K. Cc: Lingam, Siva; Lent, Susan; Burkhardt, Janet; Razzaque, Muhammad; Singh, Gursharan Subject: ME7005-ACCEPTANCE REVIEW FOR COLUMBIA LAR-PRNM/ARTS/MELLA Importance: High Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968 SUBJECT: COLUMBIA GENERATING STATION -LICENSE AMENDMENT REQUEST TO CHANGE TECHNICAL SPECIFICATIONS IN SUPPORT OF PRNM/ARTS/MELLA IMPLEMENTATION.(TAC NO. ME7905)
Dear Mr. Reddemann:
By letter dated January 31, 2012, (ADAMS Accession No. ML1120400144), Energy Northwest, the licensee for Columbia Generating Station, requested the U.S. Nuclear Regulatory Commission (NRC) staff's approval of amendment to Technical Specifications (TS) for Facility Operating License No. NPF-21. The amendment would revise the TS for power distribution limits, control rod block instrumentation, Oscillation Power Range Monitor (OPRM) instrumentation, recirculation loop operating, shutdown margin test-refueling, and the Core Operating Limits Report (COLR). The proposed amendment would also provide expanded operating domain resulting from the implementation of Average Power Range Monitor/Rod Block Monitor/ Technical Specifications//Maximum Extended Load Line Limit analysis (ARTS/MELLA).
The purpose of this letter is to provide the results of the NRC staff=s acceptance review of the amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1476 or email mohan.thadani@n.
Best Regards, Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov