Letter Sequence RAI |
|---|
TAC:ME7905, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
|
MONTHYEARML12040A0732011-10-31031 October 2011 0000-0101-7647-R3, Columbia Generating Station Plant-Specific Responses Required by Numac Prnm Retrofit Plus Option III Stability Trip Function Topical Report, (NEDC-3241 OP-A) Project stage: Request ML12040A0752011-11-30030 November 2011 NEDO-33690, Revision 0, Columbia Generating Station Power Range Neutron Monitoring System Response Time Analysis Report Project stage: Request GO2-12-003, License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-01-0909 January 2012 License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License Project stage: Request ML12040A0742012-01-31031 January 2012 NEDO-33685, Revision 1, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function Project stage: Request GO2-12-017, License Amendment Request to Change Technical Specification in Support of Prnm/Arts/Mellla Implementation2012-01-31031 January 2012 License Amendment Request to Change Technical Specification in Support of Prnm/Arts/Mellla Implementation Project stage: Request ML12040A0762012-01-31031 January 2012 NEDO-33694, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Diversity and Defense-in-Depth (D3) Analysis Project stage: Request ML12040A0792012-01-31031 January 2012 NEDO-33698, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection. Enclosure 2, Attachment 14 to List of Commitments and Enclosure 3 Are Project stage: Request ML12040A0802012-01-31031 January 2012 NEDO-33507, Revision 1, Columbia Generating Station Aprm/Rbm/Technical Specifications / Maximum Extended Load Line Limit Analysis (Arts/Mellla) Project stage: Request ML1210702222012-04-16016 April 2012 Acceptance Review Email, License Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Acceptance Review ML1216704042012-06-15015 June 2012 Draft Request for Additional Information, Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI ML1216704012012-06-15015 June 2012 E-mail, Draft Request for Additional Information, Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mella Project stage: Draft RAI ML1219301042012-07-10010 July 2012 Draft Request for Additional Information, Round 2, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI ML1219301002012-07-10010 July 2012 Email, Draft Request for Additional Information, Round 2, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI ML12201B0502012-07-23023 July 2012 Request for Additional Information, Rounds 1 and 2, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML12192A3612012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12 Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33685P, Revision 1 Project stage: Withholding Request Acceptance ML12192A4332012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/11, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33690P, Revision 0 Project stage: Withholding Request Acceptance ML12192A4542012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33694P, Revision 1 Project stage: Withholding Request Acceptance ML12192A5352012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33697P, Revision 1 Project stage: Withholding Request Acceptance ML12192A5892012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33698P, Revision 1 Project stage: Withholding Request Acceptance ML12193A1092012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/27/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33507P, Revision 1 Project stage: Withholding Request Acceptance ML12192A3252012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 10/31/11 Executed by E. Schrull, GE Hitachi Americas LLC, 0000-0101-7647-R3 Plant-Specific Responses Required by NEDC-32410P-P-A Project stage: Withholding Request Acceptance GO2-12-105, Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-337582012-07-31031 July 2012 Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-33758 Project stage: Request GO2-12-116, Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla2012-08-22022 August 2012 Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla Project stage: Response to RAI ML12249A0112012-09-0505 September 2012 Redacted, Request for Additional Information, Amendment Request for Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML12261A1972012-09-17017 September 2012 Email, Draft Request for Additional Information, Round 4, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI ML12283A2692012-10-15015 October 2012 Request for Additional Information, Round 4, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Prnm/Arts/Mellla Project stage: RAI ML12328A0782012-10-31031 October 2012 NEDO-33751, Revision 3, Columbia Generating Station Power Range Neutron Monitoring System Reliability Analysis, Attachment 3 Project stage: Request GO2-12-162, Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla2012-11-12012 November 2012 Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla Project stage: Response to RAI ML12229A4802012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33754P, Revision 0 Project stage: Withholding Request Acceptance ML12192A4812012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, Affidavits Dated 11/16/11 and 7/26/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33696P, Revisions 0 and 1 Project stage: Withholding Request Acceptance ML12229A4682012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/4/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33750P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4762012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33753P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4822012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/27/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33756P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4832012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33758P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4902012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/12/12 Affidavit Executed by E. Schrull, GEH-Hitachi, Letter GE-MS-CT-106244-JC14 Project stage: Withholding Request Acceptance ML12328A0792012-11-30030 November 2012 NEDO-33789, Revision 0, Numac Power Range Neutron Monitoring Components 268X1331TCG001, 268X1332TCG001, G002 268X1333TCG001, Qualification Summary for Energy Northwest (Enw) Columbia Generating Station (Cgs), Attachment 5 Project stage: Request ML12345A3582012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, 9/26/12 Affidavit Executed by E.Schrull, GEH-Hitachi, GEH 10/5/12 Responses to Nrc/De/Eicb 9/5/12 Request for Additional Information Project stage: RAI ML12345A3662012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/12 Executed by E. Schrull, GEH-Hitachi, NEDC-33789P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4712012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, 6/29/12 and 10/22/12 Affidavits Executed by E. Schrull, GEH-Hitachi, NEDC-33751P, Revisions 2 and 3 Project stage: Withholding Request Acceptance ML13015A2732012-12-31031 December 2012 NEDO-33698, Rev 2, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection Project stage: Request ML13025A3512013-02-21021 February 2013 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/12/12, Executed by L. Dolan, GE Hitachi Americas LLC, NEDC-33685P, Revision 2 Project stage: Withholding Request Acceptance ML13025A3612013-02-21021 February 2013 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/12/12, Executed by L. Dolan, GE Hitachi Americas LLC, NEDC-33698P, Revision 2 Project stage: Withholding Request Acceptance ML13067A1062013-03-12012 March 2013 Redacted, Request for Additional Information, Round 5, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML13098A7782013-04-0808 April 2013 Request for Additional Information Following 4/3/13 Calculation Audit, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML13099A0432013-04-10010 April 2013 Request for Additional Information Following 4/3/13 Calculation Audit, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI PNP 2013-038, 2012 Annual Radioactive Effluent Release and Waste Disposal Report2013-04-23023 April 2013 2012 Annual Radioactive Effluent Release and Waste Disposal Report Project stage: Request ML13109A1632013-04-26026 April 2013 Request for Withholding Information from Public Disclosure - 4/2/13 and 4/10/13 Affidavits Executed by L. Dolan, GEH; Enclosures 1 and 3 of GEHs Request for Additional Information Responses Project stage: RAI GO2-13-074, Independent Spent Fuel Storage Installation, Submittal of 2012 Annual Radiological Environmental Operating Report2013-05-0909 May 2013 Independent Spent Fuel Storage Installation, Submittal of 2012 Annual Radiological Environmental Operating Report Project stage: Request GO2-13-075, Response to Request for Additional Information Regarding License Amendment to Implement Prnm/Arts/Mellla2013-05-0909 May 2013 Response to Request for Additional Information Regarding License Amendment to Implement Prnm/Arts/Mellla Project stage: Response to RAI ML13140A0612013-06-0303 June 2013 Request for Withholding Information from Public Disclosure - 5/6/13 Affidavit Executed by L. Dolan, GEH, Enclosure 1 of Response to Request for Additional Information to Audit RAI 5 Project stage: RAI 2012-07-10
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 July 23, 2012 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
COLUMBIA GENERATING STATION - REQUEST FOR ADDITIONAL INFORMATION REGUARDING LICENSE AMENDMENT REQUEST TO IMPLEMENT PRNM/ARTS/MELLLA (TAC NO. ME7905)
Dear Mr. Reddemann:
By letter dated January 31,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML120400144), Energy Northwest (the licensee) submitted a license amendment request for Columbia Generating Station that would allow the licensee to expand the operating domain by the implementation of Average Power Range Monitor/Rod Block MonitorlTechnical Specifications/Power Range Neutron Monitoring/Maximum Extended Load Line Limit Analysis (ARTS/PRNM/MELLLA). The Neutron Monitoring System would be modified by replacing the analog Average Power Range Monitor subsystem with the Nuclear Measurement Analysis and Control Power Range Neutron Monitoring System. The licensee would expand the operating domain to Maximum Extended Load Line Limit Analysis and make changes to certain allowable values and limits and to technical specifications. The changes to the technical specifications include the adoption of Technical Specifications Task Force (TSTF)
Change Traveler TSTF-493, "Clarify Application of Setpoint Methodology for LSSS [Limiting Safety System Setting] Functions," Option A surveillance notes. Furthermore, the amendment would allow a change in the licensing basis to support Anticipated Transient without Scram accident mitigation with one Standby Liquid Control pump instead of two.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by the licensee and determined that additional information identified in the enclosure to this letter is needed in order for the NRC staff to complete its review. The draft copy of the request for additional information was provided in two parts to Mr. Zachary Dunham of your staff via e-mail on June 15 and July 10, 2012. A teleconference was held on July 19, 2012, with members of your staff. During the call, Mr. Dunham agreed to respond within 30 days of the date of this letter.
M. Reddeman
- 2 If you have any questions regarding this matter, I may be reached at (301) 415-1056 or via e-mail at lauren.gibson@nrc.gov.
Sincerely, Lauren K. Gibson, Project Manager Plant licensing Branch IV Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
As stated cc w/encl: Distribution via listserv
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO IMPLEMENT PRNM/ARTS/MELLLA ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397 By letter dated January 31, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML120400144), Energy Northwest (the licensee) submitted a license amendment request for Columbia Generating Station (CGS) that would allow the licensee to expand the operating domain by the implementation of Average Power Range Monitor/Rod Block MonitorlTechnical Specifications/Power Range Neutron Monitoring/Maximum Extended Load line limit Analysis (ARTS/PRNM/MELLLA). The Neutron Monitoring System would be modified by replacing the analog Average Power Range Monitor (APRM) subsystem with the Nuclear Measurement Analysis and Control (NUMAC) Power Range Neutron Monitoring System. The licensee would expand the operating domain to Maximum Extended Load line limit Analysis and make changes to certain allowable values and limits and to technical specifications. The changes to the technical specifications include the adoption of Technical Specifications Task Force (TSTF) Change Traveler TSTF-493, "Clarify Application of Setpoint Methodology for LSSS [limiting Safety System Setting1 Functions," Option A surveillance notes.
Furthermore, the amendment would allow a change in the licensing basis to support Anticipated Transient without Scram (A TWS) accident mitigation with one Standby liquid Control pump instead of two.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the submitted information and determined that the information below is needed for the staff to complete its evaluation.
- 1.
On page 1-2 of NEDC-33507P, Revision 1, "Columbia Generating Station APRM/RBMlTechnical Specifications / Maximum Extended Load line limit Analysis (ARTS/MELLLA)," January 2012 (nonproprietary version designated as NEDO-33507, Revision 1, available at ADAMS Accession No. ML12040A088), plants with either full or partial Average Power Range Monitor/Rod Block MonitorlTechnical Specifications/Maximum Extended Load line limit Analysis (ARTS/MELLLA) were listed. The NRC staff requests the licensee to clarify the following:
- a.
Does CGS plan to implement full or partial ARTS/MELLLA?
- b.
Please provide the basis for your decision in part (a) and the main differences between the two options with respect to CGS plant operation.
- 2.
Please provide the CGS core design for which the MELLLA analysis was performed and the following results of fuel-dependent portion of the analysis:
- a.
Please describe core design for the current Cycle 20 for which the MELLLA analysis was performed, including number of GE14 and ATRIUM-10 fuels Enclosure
- 2 assumed to comprise the core, and their burnup history (i.e., number of cycles exposed in the core) for each fuel types.
- b.
For a given core condition of a mixed core. the Specified Acceptable Fuel Design Limits (SAFDLs), such as minimum critical power ratio (MCPR). linear heat generation rate (LHGR), and peak cladding temperature (PCT). depend on the type of fuel design and their respective burnup history. Which fuel design (GE14 or ATRIUM-10) produces the limiting SAFDLs for the transient and accident analyses performed at the MELLLA conditions? Please explain why.
- 3.
The fourth bullet from the bottom of page 7-2 of NEDC-33507P, Revision 1, states, "A full core of GE14 fuel is assumed to comprise the core."
- a.
Please clarify which of the transient and accident analyses (Le., anticipated operational occurrences (AOOs), loss-ot-coolant accident (LOCA), American Society of Mechanical Engineers (ASME) Overpressure and ATWS) assumed a full core of GE14 fuel.
- b.
Please explain why GE14 fuel was assumed to comprise the entire core when the core included ATRIUM-10 fuel, as well.
- c.
If a full core of GE 14 fuel was assumed to comprise the core, please explain how the analysis captures a situation when ATRIUM-10 fuel is more limiting in the transient and accident analyses, and provide reasonable assurance as to how the analysis of record is most conservative.
- 4.
In Table 7-1. "ECCS-LOCA Analysis Bases for CGS ARTS/MELLLA," ot NEDC-33507P, Revision 1, the emergency core cooling system-LOCA rated thermal power was assumed to be equal to 3629 megaWatts (MWt), which is 4.1 percent (143 MWt) higher than the current licensed thermal power (CL TP) of 3486 MWt. The NRC staff understands that Appendix K to 10 CFR Part 50 requires analyses to be performed at 2 percent higher than the CL TP to allow tor instrumentation error. Please explain why the LOCA analysis was performed at a thermal power which is 4.1 percent higher than the CLTP.
- 5.
Please describe your training program for the operators in preparation for implementing the ARTS/MELLLA operation at CGS. If applicable. please describe any additional changes to training or qualifications.
- 6.
In many ot the sections describing human factors changes, the submittal states that changes were made in accordance with CGS Design Specification 204 for Human Factors. Please provide a description of this Design Specification and its relevance to Human Factors. Also, please identify any regulatory precedents where this Design Specification was approved previously.
- 7.
Please describe what, if any, operator actions are being changed, added or deleted.
-3
- 8.
Please describe any new task analyses results that were completed to identify functional requirements and to provide inputs for function allocation.
- 9.
Please describe any changes to physical interfaces.
- 10.
Please describe changes that will be required to the procedures for the new digital upgrade. Please provide a list of those changes.
- 11.
Please describe how CGS has applied insights from industry operating experience.
ML122018050 Sincerely, IRA!
Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrLAJBurkhardt Resource RidsOgcRp Resource RidsRgn4MailCenter Resource MRazzaque, NRR/DSS/SRXB MKeefe, NRRIDRAlAHPB OFFICE NRR/DORLlLPL4/PM NRRIDORLlLPL4/LA NRRIDRAlAHPB/BC NAME LKGibson JBurkhardt UShoop DATE 7/23112 7/23/12 7/23/12 OFFICE NRR/DSS/SRXB/BC (A)
NRR/DORLlLPL4/BC NRR/DORLlLPL4/PM NAME SMiranda MMarkley LKGibson DATE 7/23/12 7/23/12 7/23/12