From:
Alexander, Ryan To:
Cook, Daniel D.
Cc:
Sullivan II, Stephen M.; Wolfgramm, Desiree M.; Haire, Mark
Subject:
REQ: Kick-Off Call & RFI Provided for "Roll-Back" EP Program Inspection (Week of Nov 2, 2020)
Date:
Sunday, September 20, 2020 5:40:19 PM Attachments:
CGS Nov 2020 EP Program Inspection RFI.pdf Importance:
High Dan:
Mark Sullivan (CGS EP Manager) called me late last week to inform me that the station will be pursuing an exemption request to push the CGS EP Exercise and associated inspection to CY2021 (late Oct 2021). As discussed in the May 14, 2020 guidance letter, the supplement to the May 14th letter, and RIS 2006-003, regarding such exemption requests, please promptly communicate and coordinate with your stations NRR/DORL Project Manager regarding any presubmittal calls and the exemption process.
Also during our call last week, Mark and I agreed that in lieu of the EP Exercise Inspection the week of 10/26/2020, the station will be ready to support the EP Program Inspection the following week of 11/2/2020 instead. This roll-back of the EP Program inspection from CY2021 to CY2020 is in line with the actions the NRC Region IV taken for all of the other stations who have submitted an exemption to push their exercise to CY2021 due to continuing impacts from the COVID-19 PHE.
With only ~6 weeks before this rescheduled inspection, the purpose of this e-mail is two-fold
- 1. Request that we hold an inspection Kick-Off for the EP Program Inspection this upcoming week with EP and Regulatory Affairs. I will be in a work status Tuesday, 9/22 through Friday, 9/25, this week. Please set up a ~30 min call based on the stations availability and in consideration of my current availability as follows:
- d. Fri, 9/25: 7:00 - 10:00 AM PDT
- 2. While I normally wait until after the Kick-Off Call to send the Request for Information (RFI) in support of the inspection, because of the short period, I wanted to give the station as much time as possible to start gathering the materials requested. So attached to this e-mail is also the RFI that we will discuss during the Kick-Off call. In the attached, I listed a requested date for the materials to be provided in electronic format using the online document portal of the stations choice by COB on Monday, October 19, 2020. This date chosen provides the typical ~4 weeks for the station to compile and provide the materials in support of my inspection preparation. If the station requires additional time for some of the materials requested, we can discuss this during the Kick-Off call this week.
This letter/e-mail does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request ADAMS Accession No. ML20265A324
for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This email and its enclosures will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you have any questions regarding the desire for the kick-off call please do not hesitate to contact me via phone upon receipt of this e-mail or anytime this week - my NRC desk line is forwarded to my mobile device.
Thank you, Ryan D. Alexander Sr. Emergency Preparedness Inspector NRC Region IV, Div. of Reactor Safety 1600 E. Lamar Blvd, Arlington, TX 76011 Office: 817-200-1195 (forwarded to mobile during COVID-19 PHE)
P Please consider the environment before printing this e-mail.
Request for Information for Biennial EP Program Inspection Dockets 05000397 (CGS); Inspection Report 2020004 Inspection Procedures 71114.02, 71114.03, 71114.04, 71114.05, and 71151 Onsite Week: Nov 2 - 5, 2020 Preparation Period: Oct 20 - 29, 2020 For the preparation documents, Items 1 thru 4, and 6, the time period for consideration relative to since the last program inspection should be considered 1 JAN 2019 - 30 SEPT 2020:
- 1) 71114.02: Alert & Notification System Testing a) Copy of the current, complete FEMA-approved ANS design report and any approved modification packages b) List of all ANS changes since last program inspection including a brief change description c) Copies of primary and backup ANS testing and maintenance procedures d) If any ANS testing is to be conducted during the onsite week, please provide details on the testing and when it is scheduled.
e) List of all Condition Reports related to the ANS system, sirens, etc. since the last program inspection - in sortable/searchable format
- 2) 71114.03: ERO Staffing and Augmentation Systems a) Copy of the current procedure(s) for primary and backup ERO callout methods i)
Included any prior procedure(s) revisions for primary and backup ERO callout methods since the last program inspection b) Copies of the periodic/quarterly ERO callout tests since the last inspection c) Copy of the on-shift ERO staffing analysis d) List of all Condition Reports related to the ERO callout tests, procedures, etc. since the last program inspection - in sortable/searchable format
- 3) 71114.04: EAL and Emergency Plan Changes a) Copy of the 50.54(q) procedure (all revisions in effect during the time period) b) Copy of the 50.54(q) evaluations completed during the time period i)
This request should include copies of all evaluations completed (if any) to implement compensatory measures/contingency plans to ensure E-Plan requirements continued to be met during COVID-19 Public Health Emergency (PHE).
c) Listing of all of the 50.54(q) screens performed during the time period d) List of all Condition Reports related to the Emergency Plan Changes, 50.54(q) process, etc.
since the last program inspection - in sortable/searchable format
- 4) 71114.05: Maintenance of EP a) Copies of all drill reports (on-and off-site) since the last program inspection. Include any periodic/quarterly ERO drills, dress-rehearsal exercises, as well as any stand-alone drills such as medical drills, ambulance, etc., during the time period.
b) Copy of the last completed full evacuation time estimate (ETE) (circa 2012), and copies of the annual ETE surveillance reports completed during the time period.
c) Copies of any internal and external assessments (except INPO assessments) during the time period.
i)
Include 50.54(t) assessments and any reviews of E-Plan MOUs/LOAs.
d) Copy of any site QA audits/assessments related to emergency preparedness during the time period (have audit checklists available during the week of onsite inspection) e) Provide a copy of site QA annual/trimester reports related to emergency preparedness during the time period f) Copy of any tracking tools being used to ensure the site is meeting/will meet the eight-year exercise cycle requirements specified in 10 CFR 50, Appendix E, Section IV.F.2.j g) Listing of Work Orders associated with corrective maintenance for E-Plan-related equipment during the time period.
h) Copy of corrective action program procedure(s) (all revisions in effect during the time period).
i)
Listing of all EP Condition Reports during the time period - in sortable/searchable format
- 5) 71151: PI Verification (ERO Participation, DEP, and ANS) - ANNUAL review; for the purposes of these requests the period in question is 1Q/2019 - 3Q/2020 (7 quarters).
a) Copy of the station procedure(s) for EP Performance Indicator data collection and submission.
b) List of the DEP opportunities used in developing the PI values for the 7-quarter period. A sample of supporting documentation for a selection/sample of the opportunities will be requested when the inspector is onsite.
c) Copies of all Condition Reports, including any causal evaluations, related to DEP opportunity failures during the 7 quarters.
d) Copies of all Condition Reports related to ERO qualification issues/deficiencies during the 7 quarters.
e) Copies of records for ANS Siren Tests for the 7 quarters period.
f) During ONSITE WEEK, please make available supporting data used to determine the PI values for all three EP-related PIs. (Data/records can be reviewed in paper or electronic form.)
- 6) General Requests a) Copy of the current Emergency Plan.
i)
Include copy(ies) of all revisions in effect during the time period.
b) Copies of all current Emergency Plan Implementing Procedures (as noted in Appendix 2 of the CGS E-Plan) in effect.
Due to the ongoing Public Health Emergency, if possible, please make the requested materials available to the lead NRC Region IV EP Inspector (R. Alexander) in electronic format using the online document portal of the stations choice, by COB on Monday, October 19, 2020.
This request does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This e-mail and its enclosures will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.