MONTHYEARGO2-16-096, License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate2016-06-28028 June 2016 License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate Project stage: Request ML16218A3902016-08-0808 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (Mur) Power Uprate (from 3486 Mwt to 3544 Mwt) Project stage: Acceptance Review GO2-16-124, Response to License Amendment Request, Opportunity to Supplement2016-08-18018 August 2016 Response to License Amendment Request, Opportunity to Supplement Project stage: Supplement ML16243A3662016-09-0101 September 2016 Acceptance of Requested Licensing Action Measurement Uncertainty Recapture Project stage: Acceptance Review ML16246A2812016-09-14014 September 2016 Request for Withholding Information from Public Disclosure, 6/9/16 Affidavit Executed by J. Harrison, GE-Hitachi and 6/14/16 Affidavit Executed by N. Wilmshurst, EPRI, Related to NEDC-33853P, Revision 0 Project stage: Withholding Request Acceptance ML16207A0162016-09-14014 September 2016 Request for Withholding from Public Disclosure - 5/18/16 Affidavit Executed by E. Hauser, Caldon Ultrasonics Technology Center, Cameron Engineering Report ER-1074, Revision 0 Project stage: Other ML16207A0332016-09-14014 September 2016 Request for Withholding from Public Disclosure - 5/18/16 Affidavit Executed by E. Hauser, Caldon Ultrasonics Technology Center, Cameron Engineering Report ER-1049, Revision 3 Project stage: Other ML16302A0392016-10-27027 October 2016 NRR E-mail Capture - Request for Additional Information, Columbia Mur LAR: Fire Protection Project stage: RAI ML16306A2942016-11-0101 November 2016 NRR E-mail Capture - Request for Additional Information, Columbia Mur LAR: Esgb, Coating and FAC, CAC MF8060 Project stage: RAI ML16323A1192016-11-16016 November 2016 NRR E-mail Capture - Eicb RAIs for Columbia Mur Project stage: RAI ML16327A1842016-11-22022 November 2016 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate Project stage: RAI GO2-16-161, Response to Request for Additional Information, Columbia Mur LAR: Esgb, Coating and FAC2016-12-0808 December 2016 Response to Request for Additional Information, Columbia Mur LAR: Esgb, Coating and FAC Project stage: Response to RAI ML17006A0902017-01-0404 January 2017 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate Project stage: RAI ML17006A0922017-01-0404 January 2017 NRR E-mail Capture - Eicb RAIs for Columbia Mur Project stage: RAI GO2-17-015, Energy Northwest - Transmittal of Response to Request for Additional Information, Columbia Mur LAR: Electrical Instrument and Controls Branch (Eicb) and Reactor Systems Branch (Srxb)2017-01-12012 January 2017 Energy Northwest - Transmittal of Response to Request for Additional Information, Columbia Mur LAR: Electrical Instrument and Controls Branch (Eicb) and Reactor Systems Branch (Srxb) Project stage: Response to RAI GO2-17-049, Response to Request for Additional Information, Columbia Mur LAR Evib Rais, Enclosure 22017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais, Enclosure 2 Project stage: Response to RAI ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais Project stage: Request ML17087A5692017-04-12012 April 2017 Request for Withholding Information from Public Disclosure for Columbia Generating Station Project stage: Withholding Request Acceptance 2016-08-18
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML21032A2872021-02-0808 February 2021 Acceptance Letter for On-Site Cooling System Sediment Disposal Request ML19133A2032019-05-0707 May 2019 Acceptance Review for EPID L-2019-LLA-0068 Columbia 2.C(11) LAR ML19129A1822019-03-26026 March 2019 Acceptance Review for (EPID L-2019-LLA-0034) Control Room HVAC Change LAR ML16243A3662016-09-0101 September 2016 Acceptance of Requested Licensing Action Measurement Uncertainty Recapture ML13266A0302013-09-23023 September 2013 Acceptance Review Email, Request to Adopt TSTF-477, Revision 3, Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystem, Using Consolidated Line Item Improvement Process ML1213904702012-05-18018 May 2012 Acceptance Review Email, Request for One-time Exemption from 10 CFR 50.36a(a)(2) Submittal Date for Radioactive Effluent Release Report ML1210702222012-04-16016 April 2012 Acceptance Review Email, License Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla ML1205200362012-02-19019 February 2012 Acceptance Review Email, License Amendment Request, Administrative and Editorial Changes to Technical Specifications Related to Change in Software and to Adopt TSTF-GG-05-01 Revision 1 Writer'S Guide ML1109803882011-04-0808 April 2011 Acceptance Review Email, License Amendment Request, Administrative Changes to Delete or Modify Expired License Conditions ML1031304742010-11-0909 November 2010 Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.1.7, Standby Liquid Control (SLC) System, to Support Increase in Boron-10 Enrichment ML1025905992010-09-16016 September 2010 Acceptance Review ML1022103722010-08-0909 August 2010 Acceptance Review for License Amendment Request Re Approval of Cyber Security Plan ML1013701432010-05-17017 May 2010 Acceptance Review for License Amendment Request, Revise Technical Specifications Relating to Traversing In-Core Probe Containment Isolation Valve Instrumentation ML1010203852010-04-12012 April 2010 Acceptance Review ML1008104172010-03-22022 March 2010 Acceptance Review Email, License Amendment Request, Revise Technical Specification (TS) 3.1.3, Control Rod Operability, and TS 3.1.5, Control Rod Scram Accumulators ML0909800262009-04-0808 April 2009 E-Mail Acceptance Review for License Amendment Request 2024-04-15
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 1, 2016 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
COLUMBIA GENERATING STATION-ACCEPTANCE OF REQUESTED LICENSING ACTION RE: MEASUREMENT UNCERTAINTY RECAPTURE (CAC NO. MF8060)
Dear Mr. Reddemann:
By letter dated June 28, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16183A365) as supplemented by letter dated August 18, 2016 (ADAMS Accession No. ML16231A511), Energy Northwest submitted a license amendment for Columbia Generating Station. The proposed amendment would revise the operating license and technical specification to implement an increase in rated thermal power from the current licensed thermal power of 3486 megawatts thermal (MWt) to a measurement uncertainty recapture thermal power of 3544 MWt. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.
The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. During the acceptance review process insufficiencies were identified by the NRC staff which were submitted in the supplemental letter dated August 18, 2016 stated above.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
M. Reddeman If you have any questions, please contact me at (301) 415-5136 or via e-mail at John.Klos@nrc.gov.
J n los, Project Manager Plan Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397 cc: Distribution via Listserv
ML16243A366 OFFICE NRR/DORL/LPL4-1/PM NRR/DORL/LPL4-1/LA NRR/DORL/LPL4-1 /BC NRR/DORL/LPL4-1 /PM NAME JKlos JBurkhardt(PBlechman for) BPascarelli JKlos DATE 8/31/16 8/31/16 8/31/16 9/1 /16