ML20090F553

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Accepted: Columbia Relief Request, EPID: L-2020-LLR-0035
ML20090F553
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/30/2020
From: John Klos
NRC/NRR/DORL/LPL4
To: Wolfgramm D
Energy Northwest
References
L-2020-LLR-0035
Download: ML20090F553 (2)


Text

From: Klos, John Sent: Monday, March 30, 2020 2:44 PM To: Wolfgramm, Desiree M.

Cc: Klos, John

Subject:

Accepted: Columbia Relief Request, PID: L-2020-LLR-0035

Desiree, By letter dated February 26, 2020, Energy Northwest submitted a relief request for Columbia Generating Station. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is February 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

Thank you, John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O9D22 NRC/NRR/DORL/LPL4, MS O9E3 Washington, DC 20555-0001 301.415.5136, John.Klos@NRC.gov

Hearing Identifier: NRR_DRMA Email Number: 500 Mail Envelope Properties (BL0PR0901MB32178F9A595915CFC88700FDE3CB0)

Subject:

Accepted: Columbia Relief Request, PID: L-2020-LLR-0035 Sent Date: 3/30/2020 2:43:42 PM Received Date: 3/30/2020 2:43:44 PM From: Klos, John Created By: John.Klos@nrc.gov Recipients:

"Klos, John" <John.Klos@nrc.gov>

Tracking Status: None "Wolfgramm, Desiree M." <dmwolfgramm@energy-northwest.com>

Tracking Status: None Post Office: BL0PR0901MB3217.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2688 3/30/2020 2:43:44 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: