ML101020385

From kanterella
Jump to navigation Jump to search

Acceptance Review
ML101020385
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/12/2010
From: Lyon C
Watts Bar Special Projects Branch
To: Humphreys M
Energy Northwest
Lyon C (415-2296)
References
TAC ME3582, TAC ME3714
Download: ML101020385 (2)


Text

From: Lyon, Fred Sent: Monday, April 12, 2010 12:19 PM To: 'Humphreys, Michael C.'

Cc: 'Walli, Lori A.'

Subject:

Acceptance Review (TAC Nos. ME3582 and ME3714)

By letter dated March 11, 2010, Energy Northwest submitted relief request nos. 3ISI-10 and 3ISI-11, in accordance with 10 CFR 50.55a(a)(3)(i). The relief requests are for the 3rd 10-year ISI interval at Columbia Generating Station.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of the relief requests. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the relief requests in terms of regulatory requirements and the protection of public health and safety and the environment.

If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

E-mail Properties Mail Envelope Properties ()

Subject:

Acceptance Review (TAC Nos. ME3582 and ME3714)

Sent Date: 04/12/2010 12:12:24 PM Received Date: 04/12/2010 12:18:00 PM From: Lyon, Fred Created By: Fred.Lyon@nrc.gov Recipients:

MCHUMPHREYS@energy-northwest.com ('Humphreys, Michael C.')

Tracking Status: None LWALLI@energy-northwest.com ('Walli, Lori A.')

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 11275 04/12/2010

Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: