ML21137A001

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074
ML21137A001
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/14/2021
From: Mahesh Chawla
NRC/NRR/DORL/LPL4
To: Ronnie Garcia
Energy Northwest, Office of Nuclear Reactor Regulation
References
L-2021-LLA-0074
Download: ML21137A001 (3)


Text

From: Chawla, Mahesh Sent: Friday, May 14, 2021 4:16 PM To: 'Garcia, Richard M.'

Cc: Mitchell, Jeff; Gibson, Lauren; James, Lois; Hiser, Allen; Josey, Jeffrey; Merker, Lindsay; Hernandez, Nick; Dixon-Herrity, Jennifer; Wengert, Thomas

Subject:

LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074

Dear Mr. Garcia,

By letter dated April 28, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21118A812), Energy Northwest (the licensee) submitted a license amendment request for Columbia Generating Station (Columbia). This amendment request is to remove license condition (LC) 2.C.(34) and revise LC 2.C.(35). LC 2.C.(34) is no longer applicable as the Columbia Final Safety Analysis Report (FSAR) has been updated to include the License Renewal (LR) commitments set forth in the reference. The revision to LC 2.C.(35) clarifies that future changes to the license renewal commitments (LRC), as dictated by operating experience (OE), are made under the provisions of 10 CFR 50.59. The proposed changes do not result in changes to the Technical Specifications or operating requirements of Columbia.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal and discussions during the pre-licensing meeting on March 31, 2021 (Meeting Summary dated May 3, 2021(ADAMS Accession No. ML21112A351)), the NRC staff has estimated that this licensing request will take approximately 160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br /> to complete. The NRC staff expects to complete this

review in approximately 12 months, which is May 14, 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Mahesh Chawla, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ph: 301-415-8371

Hearing Identifier: NRR_DRMA Email Number: 1190 Mail Envelope Properties (MN2PR09MB5113C0348A7DC49C0A772519F1509)

Subject:

LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) -

EPID L-2021-LLA-0074 Sent Date: 5/14/2021 4:16:00 PM Received Date: 5/14/2021 4:16:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:

"Mitchell, Jeff" <Jeffrey.Mitchell2@nrc.gov>

Tracking Status: None "Gibson, Lauren" <Lauren.Gibson@nrc.gov>

Tracking Status: None "James, Lois" <Lois.James@nrc.gov>

Tracking Status: None "Hiser, Allen" <Allen.Hiser@nrc.gov>

Tracking Status: None "Josey, Jeffrey" <Jeffrey.Josey@nrc.gov>

Tracking Status: None "Merker, Lindsay" <lindsay.merker@nrc.gov>

Tracking Status: None "Hernandez, Nick" <Nicholas.Hernandez@nrc.gov>

Tracking Status: None "Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Wengert, Thomas" <Thomas.Wengert@nrc.gov>

Tracking Status: None

"'Garcia, Richard M.'" <rmgarcia@energy-northwest.com>

Tracking Status: None Post Office: MN2PR09MB5113.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4102 5/14/2021 4:16:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: