Other: ML20076E880, ML20079M106, ML20080E109, ML20100G880, ML20100G888, ML20100H212, ML20112G667, ML20127J807, ML20135B301, ML20135D754, ML20137H372, ML20137S741, ML20141P181, ML20154K144, ML20197C598, ML20197G513, ML20205C845, ML20206B459, ML20207K470, ML20211P495, ML20215E408, ML20215G100, ML20235G758
|
MONTHYEARML20076E8801983-05-17017 May 1983 Responds to NRC 830413 Order Re Environ Qualification of safety-related Electrical Equipment,Per 10CFR50.49.Environ Qualification Records Audit Will Be Completed by 831231 Project stage: Other ML20080E1091983-08-15015 August 1983 Provides Followup to Util Re Environ Qualification of safety-related Electrical Equipment. Justification for Continued Operation W/Components Not Fully Qualified Provided Project stage: Other ML20079M1061984-01-0909 January 1984 Advises NRC Re Status of Three Commitments Made in Util Concerning Environ Qualification of safety-related Electrical Equipment.Valve Actuators Tested & Successfully Passed HELB Tests Project stage: Other ML20100G8881984-09-11011 September 1984 Four-Minute Isolation of Postulated Steam Line Breaks at Fort St Vrain Nuclear Generating Station Project stage: Other ML20112G6671984-12-27027 December 1984 Informs of Efforts to Environmentally Qualify Certain post-accident Monitoring Equipment Per 10CFR50.49.Equipment Identified in Reg Guide 1.97 & Existing in Harsh Environ Will Be Qualified by 850331 Project stage: Other ML20108A2121985-02-0404 February 1985 Informs of Receipt of Generic Ltr 84-24 on 850121 & Request for Addl Info on Environ Qualification of Electrical Equipment on 850128.Responses to Both Ltrs Will Be Provided by 850328 Project stage: Request ML20100H2121985-03-25025 March 1985 Forwards Response to NRC 841227 Order Re Certification of Compliance w/10CFR50.49 (Generic Ltr 84-24).Util Previously Submitted Ltrs Re Environ Qualification of safety-related Equipment in Response to IE Bulletin 79-01B Project stage: Other ML20100G8801985-03-28028 March 1985 Forwards Addl Info Re Environ Qualification Program. Response to NRC 850128 Concerns & Summary of Completion Schedule for Outstanding Items Encl Project stage: Other ML20237L1731985-03-29029 March 1985 Notification of 850403 Meeting W/Util in Bethesda,Md to Discuss Equipment Qualification Project stage: Meeting ML20127J8071985-06-11011 June 1985 Maintains Util Position of Full Compliance w/10CFR50.49 in Response to Eh Johnson 850611 Inquiry Re Environ Qualifications of Electrical Equipment Important to Safety. Responses to Each Concern Presented in Encl Project stage: Other ML20237L1551985-06-25025 June 1985 Submits Daily Highlight.Notifies of 850702 Meeting W/Util in Bethesda,Md to Discuss State of Compliance of Plant W/ Equipment Qualification Rule 10CFR50.49 Project stage: Meeting ML20244D4841985-07-10010 July 1985 Provides Feedback on Current NRR Conclusions Re Facility Compliance W/Equipment Qualification Rule & Operator Action Needed to Terminate Design Basis Events.Summary of 850702 Meeting W/Util in Bethesda,Md Encl Project stage: Meeting ML20132B9171985-07-11011 July 1985 Discusses Resolution of Technical Issues of Aging & Operability Times Per 850702 Meeting Re Environ Qualification Program.Hold on Reactor Power to 15% Proposed as Initial Limitation Project stage: Meeting ML20132F0721985-07-19019 July 1985 Safety Evaluation Documenting Deficiencies in Licensee Program for Environ Qualification of Electric Equipment Important to Safety.Licensee Response to Generic Ltr 84-24 Inadequate.However,Operation at 15% Power Authorized Project stage: Approval ML20132F0231985-07-19019 July 1985 Forwards Safety Evaluation Re Environ Qualification of Electric Equipment Important to Safety & Authorizes Interim Operation in dry-out Mode at Max 15% of Rated Power,Based on Listed Conditions,Until Technical Review Completed Project stage: Approval ML20134M0161985-08-20020 August 1985 Submits Discussion of Technical Issues Re Environ Qualification Program Raised During Meetings W/Nrc.Aging & Operability Time Program Operator Response Time,Temp Profiles & Shutdown Cooling Paths & Equipment Evaluated Project stage: Meeting ML20135D7541985-08-30030 August 1985 Advises That Rev of Emergency Procedures Committed to in Deferred to Coincide W/Final Environ Qualification Program Documentation.Procedure Revs at This Time Will Cause More Confusion than Clarity for Operators Project stage: Other ML20135B3011985-08-30030 August 1985 Forwards Justification to Operate Facility at Reduced Power Level.Requests That NRC Provide Concurrence for Facility to Be Operated at 8% Power Level for Period of Time Not to Exceed 45 Days.Operation Does Not Pose Undue Safety Risk Project stage: Other ML20205C8451985-09-10010 September 1985 Forwards Info Supporting 850830 Request to Operate at 8% Power to Facilitate Core Dryout for 45 Days,Per 850826,0903 & 04 Telcons.Moisture Removal Needed to Maintain Conditions Prescribed in FSAR & Tech Specs Project stage: Other ML20205C4811985-09-11011 September 1985 Provides Commitment That Operating Procedures & Operator Training Described in Providing Addl Info in Support of Request to Operate at Up to 8% Power Will Be Complete Prior to Withdrawal of Control Rods Project stage: Withdrawal ML20137S7411985-09-23023 September 1985 Forwards Addl Calculations,Clarifying Util Re Predicted Fuel/Pcrv Liner Temps Resulting from Design Basis Event from 8% Power & Subsequent Reactor Cooling Utilizing Liner Cooling Sys.Calculations Confirm Original Position Project stage: Other ML20137H3721985-11-26026 November 1985 Memorandum & Order Granting Extension of 851130 Deadline for Environ Qualification of Electrical Equipment to 860531 & Approving Proposal to Allow Operation w/35% Reactor Power Limit During Interim.Served on 851127 Project stage: Other ML20151N7211985-12-27027 December 1985 Forwards Response to 851105 Request for Addl Info Needed to Determine If Environ Qualification Program Complies W/ Requirements of 10CFR50.49.Sys Description & Temp Profiles Used in Environ Qualification Program Also Encl Project stage: Request ML20141P1811986-01-29029 January 1986 Rev 00 to Justification/Analysis:Environ Qualification of Square D Pressure & Temp Switches Project stage: Other ML20141M8081986-02-14014 February 1986 Advises That DBAs Re Permanent Loss of Forced Circulation & Rapid Depressurization of Reactor Vessel Must Be Addressed in Equipment Qualification Program.Util Cooperation W/Program Mods Confirmed During 851029 Meeting Project stage: Meeting ML20154K1441986-02-28028 February 1986 Forwards Addl Info Re Environ Qualification,Per 851105 Request.Encl Info for Three Line Break Scenarios in Reactor Bldg Will Allow Independent Verification of Temp Profiles Obtained from Ga Technologies Using Computer Programs Project stage: Other ML20142A0441986-03-12012 March 1986 Summary of 860221 Onsite Meeting W/Util,Inel,D Benedetto Assoc,S&W,Tenera,Ned & NPD Re Equipment Qualification Program & Steam Line Rupture Detection & Isolation Sys Project stage: Meeting ML20141P1771986-03-14014 March 1986 Summary of 860130 Meeting W/Util,Inel,Tenera & Sargent & Lundy Re Equipment Qualification (EQ) Program.List of Attendees,Test Profiles & Review of Sample EQ Package Encl Project stage: Meeting ML20205S2591986-04-10010 April 1986 Summary of 860326 Site Meeting W/Util,Dibenedetto Assoc,Inc, Sandia & Sargent & Lundy Re Status of Qualifications of 10CFR50.49 Cables & Maint Records History Review.Viewgraphs & Attendees List Encl Project stage: Meeting ML20204A3181986-05-0101 May 1986 Provides Status Summary of Environ Qualification Program. Addl Details on Program Contained in 860501 Draft Environ Qualification Submittal.Major Equipment Replacements Listed Project stage: Draft Other ML20197G5131986-05-12012 May 1986 Requests Concurrence Re Inclusion of DBA in Environ Qualification Program Per Berkow .Util Will Not Environmentally Qualify Electric Equipment to Mitigate DBA-1 & DBA-2 Since Equipment Not Exposed to Harsh Environ Project stage: Other ML20198H4561986-05-27027 May 1986 Summary of 860505 Meeting W/Util Re Status of Equipment Qualification Program.Considerable Work Remains Before Approval of Full Power Operation Can Be Granted.Staff Recommended Util Continue to Complete Program Project stage: Meeting ML20205S2341986-06-0101 June 1986 Summary of 860502 Meeting W/Util & Inel in Bethesda,Md Re Equipment Qualification Program Problem Areas.Attendees List & Supporting Documentation Encl Project stage: Meeting ML20206R6241986-06-20020 June 1986 Forwards Environ Qualification Submittal Re Activities to Assure Compliance w/10CFR50.49 & Incorporating Comments on Draft 860502 Submittal.Evaluations Will Be Available for Review Before Request for Release to Full Power Project stage: Draft Request ML20203B6181986-07-15015 July 1986 Summary of 860613 Meeting W/Util in Bethesda,Md Re Status of Plant Equipment Qualification Program.List of Attendees, Environ Qualification of Plant Safe Shutdown Cable & Cable Qualification Binders Encl Project stage: Meeting ML20204H6531986-07-31031 July 1986 Responds to 860724 Request for Documentation Re Use of Thermal Lag Analysis in Environ Qualification of Electrical Equipment in Plant.Thermal Analysis Will Be Performed Per Rev 3 to CENPD-255-A Project stage: Request ML20206P5971986-08-15015 August 1986 Summary of 860724 Meeting W/Util,Inel,Wyle Labs,Sargent & Lundy & Tenera in Bethesda,Md Re Util Draft Documentation to Justify Qualification of safety-related Cabling at Plant. List of Attendees Encl IR 05000267/19860251986-10-30030 October 1986 Insp Rept 50-267/86-25 on 860816-0930.Violations Noted: Failure to Follow Procedures,To Review Mod Control Procedures & to Sufficiently Document Design Verification Project stage: Request ML20197C5631986-10-30030 October 1986 Forwards Draft FATE-86-117, Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept (Ter).Ter Addresses Details Used in Temp Profile Calculations Project stage: Draft Approval ML20197C5981986-10-31031 October 1986 Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analyses, Technical Evaluation Rept Project stage: Other ML20214Q0951986-11-25025 November 1986 Summary of 861027 Meeting W/Util to Discuss Schedule for Ie/Nrr Insp of Equipment Qualification Program.Attendance List & Viewgraphs Encl Project stage: Meeting ML20214U7071986-12-0202 December 1986 Summary of 861120 Meeting W/Util,Ornl,Ga Technologies & Eg&G Re Temp Profiles for Equipment Qualification.List of Attendees & Viewgraphs Encl Project stage: Meeting ML20215E4081986-12-12012 December 1986 Forwards Analyses of Three Steam Line Break Scenarios for Reactor Bldg & Three Scenarios for Turbine Bldg Using Convective Heat Transfer Coefficient of 1.0,per NRC 861120 Request Project stage: Other ML20215G1001986-12-19019 December 1986 Forwards Second Formal Submittal Re Turbine Bldg Temp Profiles Resulting from Steam Line Breaks,Per 861120 Request.Composite Temp Profile Curves Originally Submitted as Basis for Environ Qualification Program Appropriate Project stage: Other ML20207K4701986-12-31031 December 1986 Final Review of Convection Heat Transfer Coefficients Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept Project stage: Other ML20207K4021987-01-0202 January 1987 Forwards Final FATE-86-117, Review of Convection Heat Transfer Coefficient Utilized in Fort St Vrain Main Steam Line Break Analysis, Technical Evaluation Rept,For Info Project stage: Approval ML20207Q4431987-01-16016 January 1987 Confirms 870126-30 Equipment Qualification Insp,Per 870113 Meeting at Region IV Ofcs.Mgt Entrance Meeting Scheduled for 870126 at Site Visitors Ctr & Exit Meeting Tentatively Scheduled for 870130 at Plant Site Project stage: Meeting ML20210P5241987-01-29029 January 1987 Forwards Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept,In Response to Util 861212 & 19 Submittals Project stage: Draft Other ML20210P6451987-01-31031 January 1987 Draft Evaluation of Confinement Environ Temps Following High Energy Line Breaks Proposed for Fort St Vrain Environ Qualification Program, Technical Evaluation Rept Project stage: Draft Other ML20211P4951987-02-25025 February 1987 Informs of Present Status & Plans Re Completion of Environ Qualification Program,Per Open Items Identified During 870130 Site Insp.Program & Implementing Procedures to Assure Environ Qualification in Place.Status of Open Items Encl Project stage: Other 1986-10-31
[Table View] |
Text
-
O Public Service- ='!;."-l1..
P.O. Box 84o Denver, CO 80201- 0840 OSCAR R. LEE VICE PRESIDENT July 11, 1985 Fort St. Vrain Unit No. 1 P-85238 Regional Administrator Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 fI fp7 g
Arlington, Texas 76011 JUL I 61985 ld )l Attn: Mr. Eric H. Johnson L Docket No. 50-267 i
SUBJECT:
Reactor Power Level Limitations-Resolution of EQ Technical Issues
REFERENCE:
Qualification of Fort St. Vrain Safe Shutdown Equipment for Steam Environment Resulting from Pipe Ruptures Gulf GA-A12045, May 30, 1972
Dear Mr. Johnson:
As a followup to the PSC/NRC meeting of July 2,1985 on the Fort St.
Vrain (FSV) Environmental Qualification Program, PSC has the understanding that the technical issues of " Aging" and " Operability Times" require resolution prior to the facility being allowed to go to full power operation. As an initial limitation, PSC is proposing a hold on reactor power such that boilout in the economizer -
evaporator - superheater (EES) section of the steam generators (i.e.
reactor power level approximately 15%) is not achieved.
At 15% power, feedwater and main steam pressures are between 2400 psig and 2500 psig and main and hot reheat steam temperatures are between 600 degrees F and 650 degrees F. At 2400 psig, saturated conditions occur when the temperature reaches 663 degrees F. The main steam piping and the hot reheat steam piping both consist of 2 1/4 Cr. - 1 Mo. A335, Gr P22 material. In accordance with Table A-2 Appendix A of ANSI B31.1 - 1983 the allowable stress for this material at temperatures between 600 degrees F and 700 degrees F is 15 ksi. At 100% power main steam and hot reheat steam temperatures are at 1000 degrees F. The allowable stress for this material at 1000 degrees F is 7.8 ksi. Therefore, by limiting operation of the plant to steam temperatures below 650 degrees F, the safety margin of the pipir.g is increased by nearly a factor of 2 from the standpoint of allowable stresses. This increase in the allowable stress levels L' IaF' e 3 850711 72{0 0500g7 g<g j c & t#4b { sp
e ,
J significantly reduces the probability of the occurrence of a steam leak.
The cold reheat steam piping consists of carbon steel A106, Gr B piping. At 100% power, cold reheat steam conditions are 737 degrees F and 857 psig. At 15% power, cold reheat steam conditions will not exceed 375 degrees F and 180 psig. However at lower power levels (up to about 8%) the cold reheat steam temperature and pressure can be as high as 600 degrees F and 150 psig due to the use of the auxiliary boiler to supply steam to the cold reheat steam header.
Since the cold reheat steam piping will therefore experience the 600 degrees F temperature during startup to the 15% power level, although it never experiences this temperature at the 15% power level, the 600 degrees F temperature was used to calculate the material stresses.
The allowable stresses for this material specified in ANSI B31.1 are 15 ksi at 600 degrees F and 13 ksi at 737 degrees F, which results in a factor of 1.15 increase in the allowable stress margin between 15%
and 100% power.
The reduced power level results in lower peak equipment temperatures due to the lower energy release rate. Attachment 1 shows a comparison of the peak atmospheric temperatures, for the 100% and 15%
power conditions at varying distances from the steam line rupture for hot reheat piping in the turbine building and the cold reheat line in the reactor building. The 100% condition peak temperatures were obtained from the reference above. The 15% condition peak temperatures were calculated using the CONTEMPT-G computer code which is the same code that was utilized to generate the 100% results in the reference. The 375 degrees F and 180 psig steam conditions were used for the cold reheat steam pipe rupture case at 15% since these result in the highest environmental temperatures in the reactor building for all power levels up to 15%.
A 15% power level will allow the initiation of moisture dry out in the PCRV. Realistically, complete core dry out can not be achieved until higher power levels are allowed. An explicit time frame schedule to achieve this level of operation can not be predicted since the rate of core dry out is a function of moisture content and core temperatures (i.e. reactor power levels). Historically, several weeks are required to dry out the core. PSC is continuing to evaluate the Environmental Qualification profiles and plant operating conditions and, if found appropriate, justification will be submitted in a followup letter for allowing higher power levels of operation.
A followup letter will also be submitted with the predicted completion schedules for the " Aging" and " Operability Time" programs.
.. Should you have any questions concerning this matter, please contact Mr. M. H. Holmes at (303) 571-8409.
Very truly yours,
- 0. R. Lee, Vice President Electric Production ORL/JS:km t
i l
l t
l
-s a
6 f
N I
r ATTACHMENT 1 TABLE 1: Peak Temperature As A Function Of Distance From The Hot Reheat Steam Line Rupture (TurbineBuilding)
PEAK TEMPERATURE POWER LEVEL DISTANCE 100% 15%
20 ft 470 degrees F 241 degrees F 30 ft 425 degrees F 234 degrees F 50 ft 385 degrees F 221 degrees F 70 ft 375 degrees F 194 degrees F TABLE 2: Peak Temperature As A Function Of Distance From The Cold Reheat Steam Line Rupture (Reactor Building)
PEAK TEMPERATURE POWER EVEL DISTANCE 100% 15%
20 ft 400 degrees F 236 degrees F 30 ft 320 degrees F 226 degrees F Around 275 degrees F 191 degrees F PC3V