|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G7461999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Cooper Nuclear Station ML20212C5001999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station ML20210R0381999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Cooper Nuclear Station ML20209E1061999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Cns.With ML20195K2851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Cooper Nuclear Station.With ML20206P9751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Cooper Nuclear Station ML20205Q0891999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Cooper Nuclear Station.With ML20204C9751999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Cooper Nuclear Station ML20199E6751999-01-14014 January 1999 Monthly Operating Rept for Dec 1998 for Cooper Nuclear Station ML20198D2471998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Cooper Nuclear Station.With ML20195F8601998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Cooper Nuclear Station.With ML20154L5381998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Cooper Nuclear Station.With ML20153B1101998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Cooper Nuclear Station ML20237C0591998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Cooper Nuclear Station ML20236R0931998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Cooper Nuclear Station ML20249A7701998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Cooper Nuclear Station ML20247G0951998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Cooper Nuclear Station ML20216G5331998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Cooper Nuclear Station ML20248L3521998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Cooper Nuclear Station ML20202G9331998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Cooper Nuclear Station ML20198P0081997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Cooper Nuclear Station,Consisting of Operating Data Rept & Unit Shutdown Rept,Per GL 97-02 ML20203J2251997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Cooper Nuclear Station ML20199D2381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Cooper Nuclear Station ML20198J7461997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Cooper Nuclear Station ML20217A8091997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Cooper Nuclear Station ML20210L0551997-07-31031 July 1997 Monthly Operating Rept for July 1997 for CNS ML20149D8911997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Cooper Nuclear Station ML20148L9641997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Cooper Nuclear Station ML20141D4801997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Cooper Nuclear Station ML20137W4851997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Cooper Nuclear Station ML20141D5061997-03-31031 March 1997 Corrected Monthly Operating Rept for Mar 1997 for Cooper Nuclear Station ML20136G3721997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for CNS ML20134M6511997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Cooper Nuclear Plant ML20133N2991996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Cooper Nuclear Station ML20132D0921996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Cooper Nuclear Station ML20134K7421996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Cooper Nuclear Station ML20129A9421996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Cooper Nuclear Station ML20117M8491996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Cooper Nuclear Station ML20116M7391996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Cooper Nuclear Station ML20115H3991996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Cooper Nuclear Station ML20112J1841996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Cooper Nuclear Station ML20112A6851996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Cooper Nuclear Station ML20107E9691996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Cooper Nuclear Station ML20106G9681996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Cooper Nuclear Station ML20100F7051996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Cooper Nuclear Station ML20100F7081995-12-31031 December 1995 Corrected Page for Monthly Operating Rept for Dec 1995 for Cooper Nuclear Station ML20096B8941995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Cooper Nuclear Station ML20095E0591995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Cooper Nuclear Station ML20094H9711995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Cooper Nuclear Station ML20093E5621995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Cooper Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212K9781999-09-30030 September 1999 Safety Evaluation Accepting USI A-46 Implementation Program ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217G7461999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Cooper Nuclear Station ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212C5001999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station ML20211D6491999-08-25025 August 1999 Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy ML20210R0381999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Cooper Nuclear Station ML20210J2921999-07-29029 July 1999 Special Rept:On 990406,OG TS & Associated Charcoal Absorbers Were Removed from Svc.Caused by Scheduled Maint on Hpci. Evaluation of Offsite Effluent Release Dose Effects Was Performed to Ensure Plant Remained in Compliance ML20209H8281999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20211A9981999-07-12012 July 1999 Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209E1061999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Cns.With ML20196B3851999-06-17017 June 1999 Summary Rept of Facility Changes,Test & Experiments,Per 10CFR50.59 for Period 970901-990331.Summary of Commitment Changes Made During Same Time Period Also Encl ML20195K2851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Cooper Nuclear Station.With ML20206P0481999-05-12012 May 1999 Safety Evaluation Concluding That NPP Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at CNS & Adequately Addressed Actions Requested in GL 96-05 ML20206J0811999-05-0404 May 1999 Rev 14 to CNS QA Program for Operation ML20206P9751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Cooper Nuclear Station ML20205Q0891999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Cooper Nuclear Station.With ML20204G8951999-03-15015 March 1999 CNS Inservice Insp Summary Rept Fall 1998 Refueling Outage (RFO-18) ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20204B3701999-03-11011 March 1999 SER Accepting Third 10-year Interval Inservice Insp Plan Requests for Relief for RI-17,Rev 1 and RI-25,Rev 0.Request for Relief RI-13,Rev 2 Involving Snubber Testing & Is Being Evaluated in Separate Report ML20204C9751999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Cooper Nuclear Station ML20199E6751999-01-14014 January 1999 Monthly Operating Rept for Dec 1998 for Cooper Nuclear Station ML20195B9191998-12-31031 December 1998 1998 NPPD Annual Rept. with ML20196J9641998-12-0707 December 1998 Safety Evaluation Accepting Licensee Third 10-yr Interval Inservice Insp Plan Request for Relief RI-27,rev 1 ML20198D2471998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Cooper Nuclear Station.With ML20196A2861998-11-23023 November 1998 SER Re Core Spray Piping Weld for Cooper Nuclear Station. Staff Concluded That Operation During Cycle 19 Acceptable with Indication re-examined During RFO 18 ML20196A5241998-11-23023 November 1998 Safety Evaluation Accepting Proposed Alternative to Use UT Techniques Qualified to Objectives of App Viil as Implemented by PDI Program in Performing RPV Shell Weld & Shell to Flange Weld Examinations ML20196A5061998-11-23023 November 1998 Safety Evaluation Re Flaw Indication Found in Main Steam Nozzle to Shell Weld NVE-BD-N3A at Cns.Plant Can Be Safely Operated for at Least One Fuel Cycle with Indication in as-is Condition ML20196C4241998-11-20020 November 1998 Rev 1 to Cooper Nuclear Station COLR Cycle 19 ML20195H1761998-11-17017 November 1998 SER Authorizing Proposed Alternative in Relief Requests RV-06,RV-07,RV-09,RV-11,RV-12 & RV-15 Pursuant to 10CFR50.55a(a)(3)(ii).RV-08 Granted Pursuant to 10CFR50.55a(f)(6)(i) & RV-13 Acceptable Under OM-10 ML20195F8601998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Cooper Nuclear Station.With ML20155D9961998-10-31031 October 1998 Rev 0 to GE-NE-B13-01980-24, Fracture Mechanics Evaluation on Observed Indication at N3A Steam Outlet Nozzle to Shell Weld at Cooper Nuclear Station ML20154Q5661998-10-0505 October 1998 Rev 0 to CNS COLR Cycle 19 ML20154L5381998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Cooper Nuclear Station.With ML20151Z6141998-09-16016 September 1998 SER Accepting Util Responses to NRC Bulletin 95-002 for Cooper Nuclear Station ML20154F7931998-08-31031 August 1998 Rev 0 to J11-03354-10, Supplemental Reload Licensing Rept for CNS Reload 18,Cycle 19 ML20153B1101998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Cooper Nuclear Station ML20237E7771998-08-20020 August 1998 Revised COLR Cycle 18 for Cooper Nuclear Station ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C0591998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Cooper Nuclear Station ML20236R9131998-07-20020 July 1998 SER Accepting Rev 13 to Quality Assurance Program for Operation Policy Document for Plant ML20236P2971998-07-0707 July 1998 Rev 2 to NPPD CNS Strategy for Achieving Engineering Excellence ML20236R0931998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Cooper Nuclear Station ML20249A7701998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Cooper Nuclear Station ML20247G6131998-05-13013 May 1998 Part 21 Rept Re Defect Contained in Automatic Switch Co, Solenoid Valves,Purchased Under Purchase Order (Po) 970161. Caused by Presence of Brass Strands.Replaced Defective Valves ML20247G0951998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Cooper Nuclear Station ML20237B6861998-04-24024 April 1998 Vols I & II to CNS 1998 Biennial Emergency Exercise Scenario, Scheduled for 980609 ML20217A1531998-04-16016 April 1998 Closure to Interim Part 21 Rept Submitted to NRC on 970929. New Date Established for Completion of Level I & 2 Setpoint Project Committed to in .Final Approval of Setpoint Calculations Will Be Completed by 980531 ML20216G5331998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Cooper Nuclear Station 1999-09-30
[Table view] |
Text
. 6 OPERATING DATA REPORT DOCKET NO. 050-298 DATE 10-6-82 COMPLETED BY P. L. Ballinger TELEPHONE 40Z-625-3311 OPERATING STATUS Cooper Nuclear Station Notes
- 1. Unit Name:
- 2. Reporting Period:
September 1982
- 3. Licensed Thennal Power (MWt): 2381
- 4. Nameplate Rating (Gross MWe): 836
- 5. Design Electrical Rating (Net MWe): 778
- 6. Maximum Dependable Capacity (Gross MWe): 787 754
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted.lf Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr to.Date Cumulative
- 11. Hours in Reporting Period 720.0 6.551.0 72,336.0
- 12. Number Of Hours Resetor Was Critical 705.4 5,306.0 59,192.4 0.0 0.0 >
0.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 696.5 5,246.7 58,204.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,511,832.0 11,380,032.0 115,068,510.0
- 17. Gross Electrical Energy Generated (MWH) 503,570.0 _, 3,772,701.0 36,253,488.0 486,715.0 3,651,395.0 34,948,773.0
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Seavice Factor 96.7 80.1 80.5
- 20. Unit Availability Factor 96.7 80.1 80.5
- 21. Unit Capacity Factor (Using MDC Net) 88.5 73.0 63.2 62.1 l
- 22. Unit Capacity Factor (Using DER Net) 86.9 71.6
- 23. Unit Forced Outage Rate 3.3 3.1 3.9
- 24. Shutdowns Schedul-d Over Next 6 Months (Type. Date,and Duration of Each1:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY cl COMMERCIAL OPERATION C'211110346 821006 PDR ADOCK 05000298 toc 7, R FDR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-298 Cooper Nuclear Station UNIT DATE October 6, 1982 COMPLETED BY P. L. Ballinger t
TELEPHONE 402-825-3811
~
MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 764 37 728 2 758 13 729 3 759 39 714 .
4 304 20 728 3 130 728 21 6 493 22 728 7 534 ,3 729 8 639 24 730 9 731 25 743 10 720 700 26 1I 717 ----
27 731 12 698 ;g 751 13 713 29 773 14 705 30 729 694 ___
15 3, 16 725 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
+ - t DOCKET NO. 050-298 UNIT SIIUIDOWNS AND POWER REDUCTIONS UNIT N AME Cooper Nuclear Station DATE october 6 1982 P. L. Ballinger COMPLETED BY REPORT MONTil s a m- amk a r TELEPHONE 402-825-3811
- "E e
, [] E 3j $Y5 Licensee ,E g, g, No. Date i 3g jj$ Event p mU g3 o Action to Prevent Recurrence H
$ 5 3 e @ =g Report e u
o O
NA NA An electronic component in the "A" 82-8 820904 F 23.5 A 3 NA feedwater pump controller shorted out causing the "A" W loop flow to reduce to nearly zero flow. The reactor water level decreased to the trip leve L and the reactor scrammed. The failed component in the W pump controller was replaced and the plant was re-turned to operation.
1 I
' 3 4 1 2 F: Forced Reason: Methtxt: Exhibit G -Instructions A. Equipment Failure (Explain) 1-Manual for Preparation of Data S: Scheduled 2-Manual Scram. Entry Sheets for Licensee n-Meintenance or Test C-Refueling 3 Automatic Scram. Event Report ILER) Fde t N1IRIT;-
D Regulatory Restriction 4-Other (Explain) 0161) l E-Operator Training & License Examination -
F Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source l')/77 ) Il-Other (Explaini -
l
e - g*
Attachment B OPERATIONS NARRATIVE Cooper Nuclear Station September 1982 The plant operated the month of September with only one unscheduled shutdown. On September 4, 1982, an electronic component in the "A" feedwater pump control system failed causing the "A" FW loop flow to drop to nearly zero flow. Reactor water level decreased to the trip level and the reactor scrammed. Although the "B" FW automatically increased its flow to compensate for the loss of the "A" FW loop flow, it was insufficient to prevent the reactor scram. The failed component in the FW control system was replaced and the plant was returned to operation.
1 t
4
- - - _ -. - .-.