ML20009H256
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20009H256 | |
Person / Time | |
---|---|
Site: | Midland |
Issue date: | 07/08/1981 |
From: | Campbell L, Ladd R WOODWARD-CLYDE CONSULTANTS, INC. |
To: | |
Shared Package | |
ML20009H254 | List: |
References | |
NUDOCS 8108070106 | |
Download: ML20009H256 (350) | |
Similar Documents at Midland | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20138Q3871985-12-13013 December 1985
[Table view]Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20090L7491984-05-0404 May 1984 Rev 11 to Procedure 7220-C-230(Q), Tech Specs for Subcontract for Operating Onsite Batch Plant & Furnishing Concrete ML20090K7691984-05-0202 May 1984 Rev 6 to Procedure 7220-C-210, Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes. Incomplete Rev 7 to Procedure 7220-C-211, Tech Spec for Backfill & Related Info,Including Spec Change Notices,Encl ML20090K7661984-05-0202 May 1984 Rev 7 to Procedure 7220-C-210, Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20076N1401983-07-15015 July 1983 Rept of Overhead Fluid Grouting Test Program ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20023D1331983-05-0505 May 1983 Evaluation of Pressures in Lines of Grouting Equipment - Crack Repair Borated Water Storage Tank Foundations. ML20081J6571983-04-12012 April 1983 Test Program Status & Rev 12 - Test Schedule ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl 1985-12-13 Category:TEST REPORT MONTHYEARML20076N1401983-07-15015 July 1983
[Table view]Rept of Overhead Fluid Grouting Test Program ML20023D1331983-05-0505 May 1983 Evaluation of Pressures in Lines of Grouting Equipment - Crack Repair Borated Water Storage Tank Foundations. ML20081J6571983-04-12012 April 1983 Test Program Status & Rev 12 - Test Schedule ML18047A3521982-05-31031 May 1982 Epri/Marshall Electric Motor Operated Valve (Block Valve), Interim Test Data Rept. ML18047A3531982-03-31031 March 1982 EPRI Summary Rept:Westinghouse Gate Valve Closure Testing Program, Revision 1 ML20042C6001982-03-23023 March 1982 Test Results:Retaining Walls,Soil Boring & Testing Program ML20052F6161982-03-15015 March 1982 Addl Test Results,Index Property Testing - Soil Boring & Testing Program Midland Plant - Units 1 & 2,Midland,MI. ML20052F6201981-12-0909 December 1981 Addl Test Results,Foundation Till - Perimeter Dike Soil Boring & Testing Program Midland Plant - Units 1 & 2. ML20032E7201981-10-0101 October 1981 Test Results,Svc Water Structure Soil Boring & Testing Program ML20052F6111981-09-17017 September 1981 Addl Test Results,Foundation Sand - Baffle Dike Soil Boring & Testing Program Midland Plant - Units 1 & 2 ML20010J0401981-08-28028 August 1981 Test Results,Foundation Soils,Auxiliary Bldg (Part 1),Soil Boring & Testing Program ML20009H2561981-07-0808 July 1981 Test Results:Diesel Generator Bldg Soil Boring & Testing Program Midland Plant ML20010A4721981-07-0101 July 1981 Test Results,Perimeter & Raffle Dike Areas Soil Boring & Testing Program,Midland Plant-Units 1 & 2,Midland,MI, Vols 1 & 2.Prepared for CPC ML19350E5671981-06-10010 June 1981 Preliminary Test Results,Soil Boring & Testing Program, Perimeter & Baffle Dike Areas ML20063H4771980-08-31031 August 1980 Rept on Testing of Concrete Expansion Anchors & Grouted Anchors Installed in Concrete Blockwalls ML19318C9791980-04-30030 April 1980 Model Testing of Containment Sump ECCS Recirculation Intakes, Prepared for Bechtel Power Co & Util ML19344A3561980-02-29029 February 1980 Data Summary & Lab Procedures. Prepared for Bechtel Power Corp ML19344A3571980-02-29029 February 1980 Consolidation Tests. Prepared for Bechtel Power Corp ML19344A3581980-02-29029 February 1980 Strength Tests. Prepared for Bechtel Power Corp ML19344A3591980-02-29029 February 1980 Miscellaneous Tests. Prepared for Bechtel Power Corp ML19344A3601980-02-29029 February 1980 Test Pits 1,2 & 3. Prepared for Bechtel Power Corp ML19329E9631979-09-30030 September 1979 Plate Load Test PL-2, Prepared for Bechtel Power Corp ML19329E9531979-09-30030 September 1979 Plate Load Test PL-1, Prepared for Bechtel Power Corp ML20090K7921979-07-31031 July 1979 Review of Us Testing Field & Lab Const Test Data on Soils Used as Fill. Related Info Encl ML20090L8421976-11-22022 November 1976 Compacted Fill Density Rept. Related Info Encl 1983-07-15 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20009H256&oldid=4651148"