Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20076N14015 July 1983Rept of Overhead Fluid Grouting Test Program
ML20023D1335 May 1983Evaluation of Pressures in Lines of Grouting Equipment - Crack Repair Borated Water Storage Tank Foundations.
ML20081J65712 April 1983Test Program Status & Rev 12 - Test Schedule
ML18047A35231 May 1982Epri/Marshall Electric Motor Operated Valve (Block Valve), Interim Test Data Rept.Loop seal
Stroke time
ML18047A35331 March 1982EPRI Summary Rept:Westinghouse Gate Valve Closure Testing Program, Revision 1Boric Acid
ML20042C60023 March 1982Test Results:Retaining Walls,Soil Boring & Testing Program.
ML20052F61615 March 1982Addl Test Results,Index Property Testing - Soil Boring & Testing Program Midland Plant - Units 1 & 2,Midland,MI.
ML20052F6209 December 1981Addl Test Results,Foundation Till - Perimeter Dike Soil Boring & Testing Program Midland Plant - Units 1 & 2.
ML20052F61117 September 1981Addl Test Results,Foundation Sand - Baffle Dike Soil Boring & Testing Program Midland Plant - Units 1 & 2.
ML20010J04028 August 1981Test Results,Foundation Soils,Auxiliary Bldg (Part 1),Soil Boring & Testing Program.
ML20009H2568 July 1981Test Results:Diesel Generator Bldg Soil Boring & Testing Program Midland Plant.
ML20010A4721 July 1981Test Results,Perimeter & Raffle Dike Areas Soil Boring & Testing Program,Midland Plant-Units 1 & 2,Midland,MI, Vols 1 & 2.Prepared for CPC
ML19350E56710 June 1981Preliminary Test Results,Soil Boring & Testing Program, Perimeter & Baffle Dike Areas.
ML20063H47731 August 1980Rept on Testing of Concrete Expansion Anchors & Grouted Anchors Installed in Concrete Blockwalls
ML19318C97930 April 1980Model Testing of Containment Sump ECCS Recirculation Intakes, Prepared for Bechtel Power Co & Util
ML19344A35729 February 1980Consolidation Tests. Prepared for Bechtel Power Corp
ML19344A35629 February 1980Data Summary & Lab Procedures. Prepared for Bechtel Power Corp
ML19344A35829 February 1980Strength Tests. Prepared for Bechtel Power Corp
ML19344A35929 February 1980Miscellaneous Tests. Prepared for Bechtel Power Corp
ML19344A36029 February 1980Test Pits 1,2 & 3. Prepared for Bechtel Power Corp
ML19329E96330 September 1979Plate Load Test PL-2, Prepared for Bechtel Power Corp
ML19329E95330 September 1979Plate Load Test PL-1, Prepared for Bechtel Power Corp