Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20076N140 | 15 July 1983 | Rept of Overhead Fluid Grouting Test Program | |
ML20023D133 | 5 May 1983 | Evaluation of Pressures in Lines of Grouting Equipment - Crack Repair Borated Water Storage Tank Foundations. | |
ML20081J657 | 12 April 1983 | Test Program Status & Rev 12 - Test Schedule | |
ML18047A352 | 31 May 1982 | Epri/Marshall Electric Motor Operated Valve (Block Valve), Interim Test Data Rept. | Loop seal Stroke time |
ML18047A353 | 31 March 1982 | EPRI Summary Rept:Westinghouse Gate Valve Closure Testing Program, Revision 1 | Boric Acid |
ML20042C600 | 23 March 1982 | Test Results:Retaining Walls,Soil Boring & Testing Program. | |
ML20052F616 | 15 March 1982 | Addl Test Results,Index Property Testing - Soil Boring & Testing Program Midland Plant - Units 1 & 2,Midland,MI. | |
ML20052F620 | 9 December 1981 | Addl Test Results,Foundation Till - Perimeter Dike Soil Boring & Testing Program Midland Plant - Units 1 & 2. | |
ML20052F611 | 17 September 1981 | Addl Test Results,Foundation Sand - Baffle Dike Soil Boring & Testing Program Midland Plant - Units 1 & 2. | |
ML20010J040 | 28 August 1981 | Test Results,Foundation Soils,Auxiliary Bldg (Part 1),Soil Boring & Testing Program. | |
ML20009H256 | 8 July 1981 | Test Results:Diesel Generator Bldg Soil Boring & Testing Program Midland Plant. | |
ML20010A472 | 1 July 1981 | Test Results,Perimeter & Raffle Dike Areas Soil Boring & Testing Program,Midland Plant-Units 1 & 2,Midland,MI, Vols 1 & 2.Prepared for CPC | |
ML19350E567 | 10 June 1981 | Preliminary Test Results,Soil Boring & Testing Program, Perimeter & Baffle Dike Areas. | |
ML20063H477 | 31 August 1980 | Rept on Testing of Concrete Expansion Anchors & Grouted Anchors Installed in Concrete Blockwalls | |
ML19318C979 | 30 April 1980 | Model Testing of Containment Sump ECCS Recirculation Intakes, Prepared for Bechtel Power Co & Util | |
ML19344A357 | 29 February 1980 | Consolidation Tests. Prepared for Bechtel Power Corp | |
ML19344A356 | 29 February 1980 | Data Summary & Lab Procedures. Prepared for Bechtel Power Corp | |
ML19344A358 | 29 February 1980 | Strength Tests. Prepared for Bechtel Power Corp | |
ML19344A359 | 29 February 1980 | Miscellaneous Tests. Prepared for Bechtel Power Corp | |
ML19344A360 | 29 February 1980 | Test Pits 1,2 & 3. Prepared for Bechtel Power Corp | |
ML19329E963 | 30 September 1979 | Plate Load Test PL-2, Prepared for Bechtel Power Corp | |
ML19329E953 | 30 September 1979 | Plate Load Test PL-1, Prepared for Bechtel Power Corp |