IR 05000275/2006001

From kanterella
Revision as of 21:39, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Assessment Letter - Diablo Canyon Power Plant (NRC Inspection Report 05000275-06-001 & 05000323-06-001)
ML060610280
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/02/2006
From: Howell A
NRC/RGN-IV/DRP
To: Keenan J
Pacific Gas & Electric Co
References
IR-06-001
Download: ML060610280 (7)


Text

rch 2, 2006

SUBJECT:

ANNUAL ASSESSMENT LETTER - DIABLO CANYON POWER PLANT (NRC INSPECTION REPORT 05000275/2006001 AND 05000323/2006001)

Dear Mr. Keenan:

On February 7, 2006, the NRC staff completed its performance review of Diablo Canyon Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2005.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.

Overall, Diablo Canyon Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility.

While plant performance for the most recent quarter is within the Licensee Response column of the Action Matrix, there was a safety significant PI that affected the second and third quarters of the assessment cycle, which resulted in plant performance being in the Regulatory Response column for those two quarters. As discussed in our Assessment Followup Letter dated November 4, 2005, the second quarter 2005 Emergency Preparedness Drill/Exercise Performance PI documentation incorrectly included 3 of the 33 emergency drills as having been successfully completed. This PI assesses the percentage of all drill, exercise, and actual opportunities that were performed timely and accurately during the previous eight quarters.

When the Emergency Preparedness Drill/Exercise Performance PI data for the second quarter of 2005 was re-evaluated, the PI crossed the Green-to-White threshold. This error also carried over into the third quarter and when the Emergency Preparedness Drill/Exercise Performance PI data was re-evaluated, the PI again crossed the Green-to-White threshold. Pacific Gas and Electric Company has submitted corrected second and third quarter Emergency Preparedness

Pacific Gas and Electric Company -2-Drill/Exercise Performance PIs. Both quarters subsequently indicated the Emergency Preparedness Drill/Exercise Performance PI was White. Pacific Gas and Electric Company provided additional training and conducted numerous drills which were evaluated as successful.

The resulting data for the fourth quarter of 2005 indicated that the Emergency Preparedness Drill/Exercise Performance PI was Green. As noted in the following paragraph, a supplemental inspection of the root cause, extent of cause and condition, and corrective actions will be conducted.

The enclosed inspection plan details the inspection, except those related to physical protection, scheduled through September 30, 2007. Routine resident inspections are not listed due to their ongoing and continuous nature. In addition to the baseline inspections, the NRC will also be conducting inspections related to Temporary Instruction 2515/160, Pressurizer Penetration Nozzles and Steam Space Piping Connections in U.S. Pressurized Water Reactors, for Unit 2; Inspection Procedure 60853, On Site Fabrication of Components and Construction of an ISFSI [Independent Spent Fuel Storage Installation]; and a supplemental inspection utilizing Inspection Procedure 95001, Inspection for One or Two White inputs in a Strategic Performance Area, for the Emergency Preparedness Drill/Exercise Performance PI. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. William B. Jones at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Arthur T. Howell III, Director Division of Reactor Projects Dockets: 50-275 50-323 Licenses: DPR-80 DPR-82 Enclosure:

Diablo Canyon Inspection/Activity Plan

Pacific Gas and Electric Company -3-cc w/enclosure:

David H. Oatley, Vice President Diablo Canyon Independent Safety Committee and General Manager Robert R. Wellington, Esq.

Diablo Canyon Power Plant Legal Counsel P.O. Box 56 857 Cass Street, Suite D Avila Beach, CA 93424 Monterey, CA 93940 Donna Jacobs Ed Bailey, Chief Vice President, Nuclear Services Radiologic Health Branch Diablo Canyon Power Plant State Department of Health Services P.O. Box 56 P.O. Box 997414 (MS 7610)

Avila Beach, CA 93424 Sacramento, CA 95899-7414 James R. Becker, Vice President Richard F. Locke, Esq.

Diablo Canyon Operations and Pacific Gas and Electric Company Station Director, Pacific Gas and P.O. Box 7442 Electric Company San Francisco, CA 94120 Diablo Canyon Power Plant P.O. Box 3 City Editor Avila Beach, CA 93424 The Tribune 3825 South Higuera Street Sierra Club San Lucia Chapter P.O. Box 112 ATTN: Andrew Christie San Luis Obispo, CA 93406-0112 P.O. Box 15755 San Luis Obispo, CA 93406 James D. Boyd, Commissioner California Energy Commission Nancy Culver 1516 Ninth Street (MS 34)

San Luis Obispo Mothers for Peace Sacramento, CA 95814 P.O. Box 164 Pismo Beach, CA 93448 Jennifer Tang Field Representative Chairman United States Senator Barbara Boxer San Luis Obispo County Board of 1700 Montgomery Street, Suite 240 Supervisors San Francisco, CA 94111 Room 370 County Government Center Federal Emergency Management Agency San Luis Obispo, CA 93408 Region IX Karen Armes, Regional Director Truman Burns\Robert Kinosian 1111 Broadway California Public Utilities Commission Suite 1200 505 Van Ness Ave., Rm. 4102 Oakland, CA 94607 San Francisco, CA 94102-3298 The Honorable Tony Ferrara Mayor, City of Arroyo Grande P.O. Box 550 Arroyo Grande, CA 93421 The Honorable Larry Versaw

Pacific Gas and Electric Company -4-Mayor, City of Grover Beach James Patterson, Supervisor District Five 154 S. 8th Street San Luis Obispo County Board of Grover Beach, CA 93483 Supervisors 1055 Monterey Street, Suite D430 The Honorable Janice Peters San Luis Obispo, CA 93408 Mayor, City of Morro Bay 595 Harbor Street Institute of Nuclear Power Operations (INPO)

Morro Bay, CA 93442 Records Center 700 Galleria Parkway SE, Suite 100 The Honorable Dave Romero Atlanta, GA 30339 Mayor, City of San Luis Obispo 990 Palm Street San Luis Obispo, CA 93401 The Honorable Mary Ann Reiss Mayor, City of Pismo Beach 760 Mattie Road Pismo Beach, CA 93449 David Edge, County Administrative Officer San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Harry Ovitt, Supervisor District One San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Shirley Bianchi, Supervisor District Two San Luis Obispo County Board of Supervisors County Government Center, Room 370 San Luis Obispo, CA 93408 Jerry Lenthall, Supervisor District Three San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Khatchik Achadjian, Supervisor District Four San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408

Pacific Gas and Electric Company -5-Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (TWJ)

Branch Chief, DRP/B (WBJ)

Senior Project Engineer, DRP/E (RAK1)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

V. Dricks, PAO (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (JAC, ATG, LJS, MPS1)

T. Bergman, Chief, TRPS, OEDO (TAB)

S. Richards, Deputy Director, DIRS, NRR (SAR)

C. Holden, Deputy Director, DORL, NRR (CFH)

C. Haney, Director, DORL, NRR (CXH)

D. Terao, Chief, LPLG, DORL, NRR (DXT)

A. Wang, NRR Project Manager for DC (ABW)

RidsNrrDirsIpab SUNSI Review Completed: _wbj__ ADAMS: : Yes G No Initials: _wbj___

Publicly Available G Non-Publicly Available G Sensitive : Non-Sensitive S:\DRP\DRPDIR\EOC 05\Assessment Letters\DC.wpd C:DRP/B D:DRS D:DRP WBJones;df DDChamberlain ATHowell III

/RA/ RJCaniano for /RA/

2/22/06 2/23/06 2/27/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Page 1 of 2 Diablo Canyon 03/01/2006 08:31:22 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 95001 - OB SUPPLEMENTAL 1 1, 2 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 04/03/2006 04/07/2006 Supplemental Program EB1-08P - ISI U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/24/2006 05/05/2006 Baseline Inspections TI - 160 - PRESSURIZER PENETRATION AND STEAM SPACE 2 2 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 04/17/2006 05/23/2006 Safety Issues RP-ORS - OCCUPATIONAL RADIATION SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/24/2006 04/28/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/24/2006 04/28/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 04/24/2006 04/28/2006 Baseline Inspections EB2-52B - DC PIR INSPECTION 4 1, 2 IP 71152B Identification and Resolution of Problems 06/05/2006 06/09/2006 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 06/19/2006 06/23/2006 Baseline Inspections EB2-12B - MAINTENANCE RULE BIENNIAL 1 1, 2 IP 7111112B Maintenance Effectiveness 07/10/2006 07/14/2006 Baseline Inspections RP-ORS - OCCUPATIONAL RADIATION SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/31/2006 08/04/2006 Baseline Inspections EB1-21 - CDB 8 1, 2 IP 7111121 Component Design Bases Inspection 09/11/2006 09/15/2006 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 09/25/2006 10/06/2006 Baseline Inspections EP1 - EMERG PREPARDNESS EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections EB2-07B - HX PERFORMANCE 1 1, 2 IP 7111107B Heat Sink Performance 11/13/2006 11/17/2006 Baseline Inspections RP TEAM - RP SAFETY TEAM 5 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/04/2006 12/08/2006 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 12/04/2006 12/08/2006 Baseline Inspections EXAM - INITIAL EXAM 5 1 X02326 DIABLO CANYON UNIT 1 INITAL EXAM (3/5/07) 02/12/2007 02/16/2007 Not Applicable 2 X02327 DIABLO CANYON UNIT 2 INITIAL EXAM (3/5/07) 02/12/2007 02/16/2007 Not Applicable 1 X02326 DIABLO CANYON UNIT 1 INITAL EXAM (3/5/07) 03/05/2007 03/09/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Diablo Canyon 03/01/2006 08:31:22 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EXAM - INITIAL EXAM 5 2 X02327 DIABLO CANYON UNIT 2 INITIAL EXAM (3/5/07) 03/05/2007 03/09/2007 Not Applicable REQUAL - BIENNIAL REQUALIFICATION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 06/04/2007 06/08/2007 Baseline Inspections EP2 - EP PROGRAM 1 1, 2 IP 7111402 Alert and Notification System Testing 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/16/2007 07/20/2007 Baseline Inspections EB02/17 - 50.59 & PERMANENT PLANT MODS 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 09/10/2007 09/14/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.