Text
March 2, 2006
SUBJECT:
ANNUAL ASSESSMENT LETTER - DIABLO CANYON POWER PLANT (NRC INSPECTION REPORT 05000275/2006001 AND 05000323/2006001)
Dear Mr. Keenan:
On February 7, 2006, the NRC staff completed its performance review of Diablo Canyon Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2005.
The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.
Overall, Diablo Canyon Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility.
While plant performance for the most recent quarter is within the Licensee Response column of the Action Matrix, there was a safety significant PI that affected the second and third quarters of the assessment cycle, which resulted in plant performance being in the Regulatory Response column for those two quarters. As discussed in our Assessment Followup Letter dated November 4, 2005, the second quarter 2005 Emergency Preparedness Drill/Exercise Performance PI documentation incorrectly included 3 of the 33 emergency drills as having been successfully completed. This PI assesses the percentage of all drill, exercise, and actual opportunities that were performed timely and accurately during the previous eight quarters.
When the Emergency Preparedness Drill/Exercise Performance PI data for the second quarter of 2005 was re-evaluated, the PI crossed the Green-to-White threshold. This error also carried over into the third quarter and when the Emergency Preparedness Drill/Exercise Performance PI data was re-evaluated, the PI again crossed the Green-to-White threshold. Pacific Gas and Electric Company has submitted corrected second and third quarter Emergency Preparedness
Pacific Gas and Electric Company
- 2 -
Drill/Exercise Performance PIs. Both quarters subsequently indicated the Emergency Preparedness Drill/Exercise Performance PI was White. Pacific Gas and Electric Company provided additional training and conducted numerous drills which were evaluated as successful.
The resulting data for the fourth quarter of 2005 indicated that the Emergency Preparedness Drill/Exercise Performance PI was Green. As noted in the following paragraph, a supplemental inspection of the root cause, extent of cause and condition, and corrective actions will be conducted.
The enclosed inspection plan details the inspection, except those related to physical protection, scheduled through September 30, 2007. Routine resident inspections are not listed due to their ongoing and continuous nature. In addition to the baseline inspections, the NRC will also be conducting inspections related to Temporary Instruction 2515/160, Pressurizer Penetration Nozzles and Steam Space Piping Connections in U.S. Pressurized Water Reactors, for Unit 2; Inspection Procedure 60853, On Site Fabrication of Components and Construction of an ISFSI [Independent Spent Fuel Storage Installation]; and a supplemental inspection utilizing Inspection Procedure 95001, Inspection for One or Two White inputs in a Strategic Performance Area, for the Emergency Preparedness Drill/Exercise Performance PI. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. William B. Jones at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Arthur T. Howell III, Director Division of Reactor Projects Dockets: 50-275 50-323 Licenses: DPR-80 DPR-82 Enclosure:
Diablo Canyon Inspection/Activity Plan
Pacific Gas and Electric Company
- 3 -
cc w/enclosure:
David H. Oatley, Vice President and General Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424 Sierra Club San Lucia Chapter ATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406 Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408 Truman Burns\\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 94102-3298 Diablo Canyon Independent Safety Committee Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414 Richard F. Locke, Esq.
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)
Sacramento, CA 95814 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111 Federal Emergency Management Agency Region IX Karen Armes, Regional Director 1111 Broadway Suite 1200 Oakland, CA 94607 The Honorable Tony Ferrara Mayor, City of Arroyo Grande P.O. Box 550 Arroyo Grande, CA 93421 The Honorable Larry Versaw
Pacific Gas and Electric Company
- 4 -
Mayor, City of Grover Beach 154 S. 8th Street Grover Beach, CA 93483 The Honorable Janice Peters Mayor, City of Morro Bay 595 Harbor Street Morro Bay, CA 93442 The Honorable Dave Romero Mayor, City of San Luis Obispo 990 Palm Street San Luis Obispo, CA 93401 The Honorable Mary Ann Reiss Mayor, City of Pismo Beach 760 Mattie Road Pismo Beach, CA 93449 David Edge, County Administrative Officer San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Harry Ovitt, Supervisor District One San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Shirley Bianchi, Supervisor District Two San Luis Obispo County Board of Supervisors County Government Center, Room 370 San Luis Obispo, CA 93408 Jerry Lenthall, Supervisor District Three San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Khatchik Achadjian, Supervisor District Four San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 James Patterson, Supervisor District Five San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Institute of Nuclear Power Operations (INPO)
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339
Pacific Gas and Electric Company
- 5 -
Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (TWJ)
Branch Chief, DRP/B (WBJ)
Senior Project Engineer, DRP/E (RAK1)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
V. Dricks, PAO (VLD)
W. Maier, RSLO (WAM)
C. Gordon (CJG)
DRS Branch Chiefs (JAC, ATG, LJS, MPS1)
T. Bergman, Chief, TRPS, OEDO (TAB)
S. Richards, Deputy Director, DIRS, NRR (SAR)
C. Holden, Deputy Director, DORL, NRR (CFH)
C. Haney, Director, DORL, NRR (CXH)
D. Terao, Chief, LPLG, DORL, NRR (DXT)
A. Wang, NRR Project Manager for DC (ABW)
RidsNrrDirsIpab SUNSI Review Completed: _wbj__ ADAMS: : Yes G No Initials: _wbj___
- Publicly Available G Non-Publicly Available G Sensitive
- Non-Sensitive S:\\DRP\\DRPDIR\\EOC 05\\Assessment Letters\\DC.wpd C:DRP/B D:DRS D:DRP WBJones;df DDChamberlain ATHowell III
/RA/
RJCaniano for
/RA/
2/22/06 2/23/06 2/27/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Diablo Canyon Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2006 08:31:22 Report 22
95001
- OB SUPPLEMENTAL Supplemental Program 04/03/2006 04/07/2006 1, 2 95001 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area
EB1-08P
- ISI U2 Baseline Inspections 04/24/2006 05/05/2006
7111108P IP Inservice Inspection Activities - PWR
TI - 160
- PRESSURIZER PENETRATION AND STEAM SPACE Safety Issues 04/17/2006 05/23/2006
2515/160 IP Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
RP-ORS
- OCCUPATIONAL RADIATION SAFETY Baseline Inspections 04/24/2006 04/28/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/24/2006 04/28/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 04/24/2006 04/28/2006 1, 2 71151 IP Performance Indicator Verification
EB2-52B
- DC PIR INSPECTION Baseline Inspections 06/05/2006 06/09/2006 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 06/19/2006 06/23/2006 1, 2 71152B IP Identification and Resolution of Problems
EB2-12B
- MAINTENANCE RULE BIENNIAL Baseline Inspections 07/10/2006 07/14/2006 1, 2 7111112B IP Maintenance Effectiveness
RP-ORS
- OCCUPATIONAL RADIATION SAFETY Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 07/31/2006 08/04/2006 1, 2 71151 IP Performance Indicator Verification
EB1-21
- CDB Baseline Inspections 09/11/2006 09/15/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 09/25/2006 10/06/2006 1, 2 7111121 IP Component Design Bases Inspection
EP1
- EMERG PREPARDNESS EXERCISE Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/23/2006 10/27/2006 1, 2 71151 IP Performance Indicator Verification
EB2-07B
- HX PERFORMANCE Baseline Inspections 11/13/2006 11/17/2006 1, 2 7111107B IP Heat Sink Performance
RP TEAM
- RP SAFETY TEAM Baseline Inspections 12/04/2006 12/08/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 12/04/2006 12/08/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program
EXAM
- INITIAL EXAM Not Applicable 02/12/2007 02/16/2007
X02326 DIABLO CANYON UNIT 1 INITAL EXAM (3/5/07)
Not Applicable 02/12/2007 02/16/2007
X02327 DIABLO CANYON UNIT 2 INITIAL EXAM (3/5/07)
Not Applicable 03/05/2007 03/09/2007
X02326 DIABLO CANYON UNIT 1 INITAL EXAM (3/5/07)
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Diablo Canyon Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2006 08:31:22 Report 22
EXAM
- INITIAL EXAM Not Applicable 03/05/2007 03/09/2007
X02327 DIABLO CANYON UNIT 2 INITIAL EXAM (3/5/07)
REQUAL
- BIENNIAL REQUALIFICATION Baseline Inspections 06/04/2007 06/08/2007 1, 2 7111111B IP Licensed Operator Requalification Program
EP2
- EP PROGRAM Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/16/2007 07/20/2007 1, 2 71151 IP Performance Indicator Verification
EB02/17
- 50.59 & PERMANENT PLANT MODS Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111117B IP Permanent Plant Modifications This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.