ML13206A189

From kanterella
Revision as of 06:53, 22 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 05000275-13-004, and 05000323-13-004, Diablo Canyon Power - Notification of NRC Triennial Heat Sink Performance Inspection
ML13206A189
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/25/2013
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Halpin E D
Pacific Gas & Electric Co
References
IR-13-004
Download: ML13206A189 (6)


See also: IR 05000275/2013004

Text

July 25, 2013

Mr. Edward D. Halpin

Senior Vice President and

Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000275/2013004

AND 05000323/2013004)

AND REQUEST FOR INFORMATION

Dear Mr. Halpin

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct a triennial heat sink performance inspection at your Diablo Canyon Power

Plant. The inspection will be comprised of two reactor inspectors from the NRC Region IV office. The inspection will be conducted in accordance with NRC Inspection Procedure

71111.07, "Heat Sink Performance." The schedule for the inspection is as follows:

Onsite Inspection Dates: September 9 - 12, 2013

Experience has shown that this

inspection is resource intens

ive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to

be provided by August 26, 2013. We request, that during the onsite inspection week, you ensure that copies of analyses, evaluations, or

documentation regarding the implementation and m

aintenance of your heat exchanger program are available. Of specific interest are those documents that establish that your heat exchanger

program satisfies NRC regulatory requirement

s and conforms to applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should be

available to support the inspector at the site during the inspection.

UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511

E. Halpin - 2 -

We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mike McCoy of your licensing organization. If

there are any questions about this inspection or the material requested, please contact the

inspectors, Wayne Sifre, at 817-200-1193

or by e-mail at Wayne.Sifre@nrc.gov, or Christie Hale at 650-479-5434 or e-mail at Christie.Hale@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Offi

ce of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electr

onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 05000275, 05000323

License Nos.: DPR-80; DPR-82

Enclosure: Triennial Heat Sink Performance Inspection Request for Information

cc: Electronic Distribution for Diablo Canyon Power Plant

ML13206A189

SUNSI Review Complete Initials: WCS Non-Sensitive

Sensitive Publicly Available Non-Publicly Available SRI:EB1 RI:EB1 C:EB1 WSifre CHale TFarnholtz /RA/ /RA/ /RA/ 7/24/13 7/25/13 7/25/13

- 1 - Enclosure

Request for Information

Triennial Heat Sink Performance Inspection Diablo Canyon Power Plant

Inspection Report: 05000275/2013004, 05000323/2013004

Inspection Dates: September 9 - 12, 2013

Inspection Procedure: IP 71111.07, Triennial "Heat Sink Performance"

Inspectors: Wayne Sifre, Senior Reactor Inspector

Christie Hale, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (Certrec IMS preferred), to the attention of Wayne Sifre, by August 26, 2013. The inspector will select specific items from t

he information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.

The following heat exchangers/heat sinks have been selected for inspection:

  • Safety Injection Pump Lube Oil and Seal Water Coolers (2-2, 2-2A/B, 2-1, 2-1A/B)
  • Spent Fuel Pit Heat Exchanger (HX 2-1)

For all Generic Letter 89-13 exchangers

1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat

exchanger cavitation, or heat exchanger testing, in the previous three years

2. System health report(s) and maintenance rule system notebooks for all the Generic

Letter 89-13 heat exchangers

3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the

previous three years

4. Copies of any procedures developed to implement the recommendations of Generic Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description

5. Copies of any commitments to the Generic Letter 89-13 program

- 2 - Enclosure

For the specific heat exchangers selected:

Testing Documents

6. Copies of the two most recent completed tests confirming thermal performance for those heat exchangers which are performance tested

7. Instrument uncertainties of the instruments used during testing

8. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the

selected heat exchangers

9. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable

Cleaning Documents

10. The cleaning and inspection maintenance schedule for each heat exchanger for the next

five years

11. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger

12. Cleaning procedures with acceptance criteria for the selected heat exchangers

13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results

14. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers

Design Documents

15. Copies of the design basis documents and updated final safety analysis report pages for the selected heat exchangers

16. Provide a list of calculations with a description which currently apply to each heat

exchanger

17. Copies of vendor data sheets and design basis data for the selected heat exchangers

18. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers

19. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test

acceptance criteria)

20. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping

- 3 - Enclosure

21. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number

of tubes which can be plugged in each heat exchanger

22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger

For the ultimate heat sink or safety-related service water system:

23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)

24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable)

25. Copies of any design changes performed on the ultimate heat sink or safety-related service water system

26. Copies of procedures for a loss of ultimate heat sink or safety-related service water system 27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life

28. Copies of inspections and/or maintenance related to preventing biotic fouling

29. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety related section

30. Copy of the most recent service water flow balance test results, both as-found and as-

left 31. History of any thru-wall pipe leaks on the safety-related service water system

Inspector Contact Information:

Wayne C. Sifre Christie Hale

Senior Reactor Inspector Reactor Inspector

817-200-1193 650-479-5434

Wayne.Sifre@nrc.gov Christie.Hale@nrc.gov

Mailing Address:

U.S. NRC, Region IV Attn: Wayne C. Sifre

1600 East Lamar Blvd.

Arlington, TX 76011-4511