Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17300B3791999-10-0808 October 1999 Proposed Tech Specs,Waiving Requirement to Perform SR 3.8.4.8 for Unit 1 Channels A,B & C on One Time Basis ML17300B3521999-09-29029 September 1999 Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7 ML17300B3321999-09-14014 September 1999 Marked-up Tech Specs Pages to TS 5.5.2 & 5.6.2,making Noted Administrative Changes ML17313B0601999-08-31031 August 1999 Rev 1 to PVNGS TS Bases Implemented Between Aug 1998 & Jul 1999 ML17313B0081999-07-14014 July 1999 Rev 2 to Inservice Insp Program Summary Manual for PVNGS Unit 1. ML17313A9571999-05-26026 May 1999 Proposed Tech Specs,Reducing Spurious Reactor Trip Hazards Associated with Setpoints While Maintaining Plant Protection ML17313A7511998-12-16016 December 1998 Rev 2 to ISI Program Summary Manual, for PVNGS Unit 3 ML17313A4181998-06-0909 June 1998 Proposed Improved Tech Specs Sections 3.5.1 & 3.5.2,revising Safety Injection tanks-operating & Safety Injection Tanks Shutdown ML17313A1141997-11-0707 November 1997 Improved TS Pages for Section 3.0, LCO & SR Applicability, Section 3.1, Reactivity Control & Section 3.2, Power Distribution Limits. Generic Change to NUREG-1432,Rev 1 Incorporated Into Section 3.0 & 3.1 ML17312B6411997-08-28028 August 1997 Proposed Tech Specs,Allowing one-time Extension of Required Surveillance Interval for Msi Sys Portion Only of ESFAS Logic ML20217Q6801997-08-22022 August 1997 Proposed Tech Specs,Clarifying Wording in TS Bases 3/4.6.1.4, Internal Pressure ML20141H7831997-07-18018 July 1997 Proposed Improved Tech Specs Section 3.8, Electrical Power Sys ML20141H7461997-07-18018 July 1997 Proposed Tech Specs,Providing Addl Info Re Improved TS Section 3.4, Rcs ML17312B0311996-11-0606 November 1996 Proposed Tech Specs 3/4.8.1.1 Re A.C. Sources - Operating ML17300B2651996-06-17017 June 1996 Proposed Tech Specs,Changing Section 1.10 & 3.2.8 & Associated Bases for Obtaining Thyroid Dcfs Used in Definition of Dose Equivalent I-131 ML17312A9451996-05-14014 May 1996 Rev 3 to Significant Condition Investigation. ML17312A6491996-04-0101 April 1996 Proposed Tech Specs,Revising TS 3/4.9.6 to Temporarily Allow Use of Hoist Instead of Refueling Machine for Movement of Fuel Assembly at Core Location A-07 ML17312A6401996-03-26026 March 1996 Proposed Tech Specs 3/4.9.6,increasing Refueling Machine Overload Cut Off Limit to 2,000 Lb,In 50 Lb Increments,For Removal of Stuck Fuel Assembly from Core Location A-06 ML17312A6321996-03-26026 March 1996 Proposed Tech Specs,Revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432 STS for C-E Plants. ML17312A6371996-03-23023 March 1996 Proposed Tech Specs,Revising TS SR 4.8.2.1.e, DC Sources, to Suspend Provision of TS 4.0.1 & 4.0.4 for Battery Capacity Testing Requirements Until Entry Into Mode 4 Following Sixth Refueling Outage ML17312A5691996-03-0505 March 1996 Revised Pages to ISI Program Summary Manual ML17312A5011996-01-17017 January 1996 Revised Page 5-1 Changing Section 5.2.2 to Include Description of Material Used for Control Element Assemblies ML17311B3221995-12-20020 December 1995 Proposed Tech Specs,Reducing Setpoint for MSIS & Rt on Low SG Pressure ML17311B3181995-12-20020 December 1995 Revised Pages to ISI Program Summary Manual ML17311B0301995-07-0303 July 1995 Proposed Tech Specs Re Temp Method to Respond to Sustained Degraded Switchyard Voltage ML17311A9771995-06-21021 June 1995 Proposed Tech Specs,Modifying Tables 3.3-4 & 3.3-5 of Section 3/4.3.2 of Esfa Sys Instrumentation ML17311A8651995-05-0202 May 1995 Proposed TS 3.1.2.6,Figure 3.1-1, Min Borated Water Vols, Relocating Elevations That Correspond to Min Required Water Vols for Spent Fuel Pool Into Site Procedures ML17311A8231995-04-18018 April 1995 Proposed Tech Specs Section 3/4.4.4 Re Sleeving Process for SG Tube Repair ML17312A9381995-02-0303 February 1995 Corrective Action Program. ML17311A5631994-12-28028 December 1994 Proposed TS Sections 3.9.6 & 4.9.6.1 Re Refueling Machine ML17311A5021994-12-0707 December 1994 Proposed Tech Specs,Changing Note 5 to Table 4.3-1 of TS 3/4.3.1 to Allow Verification of Shape Annealing Matrix Elements Used in Core Protection Calculators ML17311A4341994-11-30030 November 1994 Proposed TS 3/4.4.2,changing Pressurizer Code Safety Valve Lift Setting from 2,500 Psia to 2,475 Psia in LCOs 3.4.2.1 & 3.4.2.2 ML17311A3851994-10-31031 October 1994 Proposed Tech Spec Sections 3.9.6 & 4.9.6.1, Refueling Machine. ML17311A3341994-10-0909 October 1994 Proposed Tech Specs Suspending TS 4.0.1 & 4.0.4 for Battery Capacity Testing Requirements Until Mode 4 Following Fifth Refueling Outage ML17311A2171994-08-18018 August 1994 Proposed Tech Specs Adding Analytical Method Suppl Entitled, Calculative Methods for CE Large Break LOCA Evaluation Model for Analysis of CE & W Designed Nsss. ML17310B4511994-07-12012 July 1994 Proposed Tech Specs Amend to Add One Action Statement to Table 3.3-3,entry 8 ML17310B4151994-07-0101 July 1994 Proposed Tech Specs Re Reactor Coolant Cold Leg Temperature Vs Core Power Level of TS 3.2.6 ML17310B4331994-06-20020 June 1994 Proposed Tech Specs Sections 5.3.1 & 5.6.1, & New TS Section 3/4.9.13 & Bases 3/4.9.13 ML17310B4091994-06-17017 June 1994 Proposed Tech Specs Removing Five Tables of Component Lists Per GL-91-08 ML17310B1661994-03-28028 March 1994 Proposed Tech Specs Re Min Condensate Storage Tank Indicated Level ML17310B0911994-03-0202 March 1994 SG Tube Insp Plan. ML17310B0771994-02-24024 February 1994 PVNGS Unit 1 Cycle 5 Startup Rept. ML17310B0611994-02-18018 February 1994 Proposed Tech Specs Figure 3.2-1,Section 3/4.1.1.4 & Bases 3/4.1.1.4,establishing Min Temp for Criticality at 545 F for Facilities ML17310B0251994-01-27027 January 1994 Unit 2 Steam Generator Tube Insp Plan Addendum. ML17310B0001994-01-19019 January 1994 Proposed Tech Specs of AF Automatic Actuation Logic Surveillance Frequency Extension ML17310A8361993-11-16016 November 1993 Proposed Tech Specs Table 4.2-4, Min Staffing Requirements for PVNGS Emergencies, in Support of Proposed Rev to Emergency Plan ML17310A7421993-10-27027 October 1993 Revised Unit 1 SG Tube Insp Plan. ML17310A7351993-10-26026 October 1993 Proposed Tech Specs Changing Maximum Nominal Enrichment of Fuel Allowed to Be Used in Reactor Core ML17310A6501993-09-17017 September 1993 Unit 1 SG Tube Insp Plan. ML17310A6161993-09-0808 September 1993 Proposed Tech Specs Section 6.9.1.10 Re Sys 80 Inletflow Distribution to List of Methods Used to Determine Core Operating Limits 1999-09-29
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17313B0081999-07-14014 July 1999 Rev 2 to Inservice Insp Program Summary Manual for PVNGS Unit 1. ML17313A7511998-12-16016 December 1998 Rev 2 to ISI Program Summary Manual, for PVNGS Unit 3 ML17312A9451996-05-14014 May 1996 Rev 3 to Significant Condition Investigation. ML17312A5691996-03-0505 March 1996 Revised Pages to ISI Program Summary Manual ML17311B3181995-12-20020 December 1995 Revised Pages to ISI Program Summary Manual ML17312A9381995-02-0303 February 1995 Corrective Action Program. ML17310B0911994-03-0202 March 1994 SG Tube Insp Plan. ML17310B0251994-01-27027 January 1994 Unit 2 Steam Generator Tube Insp Plan Addendum. ML17310A7421993-10-27027 October 1993 Revised Unit 1 SG Tube Insp Plan. ML17310A6501993-09-17017 September 1993 Unit 1 SG Tube Insp Plan. ML20056D3951993-08-0909 August 1993 Rev 04.01 to Procedure 41AO-1ZZ08, SG Tube Leak ML20056D3961993-06-16016 June 1993 Rev 00.07 to Procedure 41EP-1R004, Excess Steam Demand, Consisting of CRS Actions & Details on Emergency Notification & Support ML20056G0111993-03-21021 March 1993 Rev 7 to Odcm ML17306A9831992-09-0303 September 1992 Window 2B08B, Rc LO Temp Over Press of Rev 5 to Procedure 40AL-9RK2B ML17306A9841992-09-0303 September 1992 Window 2B08B, SDC Ln Isol VLV Not Fully Closed of Rev 5 to Procedure 40AL-9RK2B ML17306A9851992-09-0303 September 1992 Window 2B09A, SDC Ln Isol Vlvs UV-653/654 Inverter Trbl of Procedure 40AL-9RK2B ML17306A9871992-09-0303 September 1992 Window ES2A01B, LO Press Safety Inj of Rev 2 to Procedure 41AL-1ES2A ML17306A4741991-10-30030 October 1991 Rev 2 to Nuclear Administrative & Technical Manual 76PR-9RW01, Solid Radwaste Process Control Program. ML20085L3671991-10-28028 October 1991 Emergency Response Data Sys (ERDS) Implementation Program Plan for Palo Verde Nuclear Generating Station ML17305B5521991-01-31031 January 1991 Rev 6 to Salt Deposition & Impact Monitoring Plan for Palo Verde Nuclear Generation Stations,Units 1,2 & 3. ML17305B2731990-07-31031 July 1990 PVNGS 1991 Business Plan. ML17306A5181989-10-22022 October 1989 Rev 0 to Nuclear Administrative & Technical Manual 01PR-0QQ02, Employee Concerns Program Policy. ML17306A5161989-09-28028 September 1989 DOL000483, Employee Concerns Program. ML20127J4161989-03-0808 March 1989 Procedure 2-3-89-001, Safety Equipment Status Sys ML20082D9681989-01-18018 January 1989 Rev 1 to Nuclear Administrative & Technical Manual 81AC-OCC07, Cable & Raceway Control & Tracking Sys ML20082D9721988-08-19019 August 1988 Rev 0 to Administrative Change Notice 03 to ES03.03, Cable & Raceway Control & Tracking Sys ML20082E6001988-07-11011 July 1988 Rev 0 to Administrative Change Notice 02 to ES03.03, Cable & Raceway Control & Tracking Sys ML20082D9801988-06-21021 June 1988 Rev 2 to QA02.02, QC Insps ML20082D9871988-06-0202 June 1988 Rev 0 to ES10.00, Sys Engineer Program ML20082D9901988-05-26026 May 1988 Rev 7 to 73AC-OZZ29, Engineering Evaluation Request ML20082E6221988-05-19019 May 1988 Rev 0 to Administrative Change Notice 01 to ES03.03, Cable & Raceway Control & Tracking Sys ML17304A1651988-05-10010 May 1988 Loose Part Monitoring Sys Loose Part Detection Program Rept. W/Eleven Oversize Drawings ML20082E6291987-09-0202 September 1987 Rev 0 to ES03.03A, Cable & Raceway Control & Tracking Sys ML20237H5571987-08-0303 August 1987 Public Version of Revs to Emergency Plan Implementing Procedures,Including Temporary Procedure Change Notice (Tpc) 3 to Rev 5 to EPIP-02, Emergency Classification & Tpc Notice 2 to Rev 11 to EPIP-03.W/870820 Release Memo ML20235X0961987-07-0202 July 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EPIP-56, UHS Emergency Water Supply, Rev 4 to EPIP-33, Offsite Assistance & Rev 5 to EPIP-27, Post-Accident Sampling Analysis ML17300A7801987-04-16016 April 1987 Procedure Change Notice 1 to Rev 0 to Procedure 41AO-1ZZ54, Monitoring Reactor Vessel Inventory W/Reactor Vessel Level Monitoring Sys Inoperable. W/870416 Ltr ML17303A3611987-03-20020 March 1987 Test/Retest Recovery Program Diesel Generator B & Associated Support Equipment. ML17333A1801987-03-13013 March 1987 Diesel Generator B Test Insps. ML20206N4501987-03-0606 March 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure Change Notice 02 to Rev 5 to EPIP-02, Emergency Classification, Closing Out Open Item Noted by NRC ML20212M8121987-01-28028 January 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 11 to EPIP-04 Re Alert,Site Area & General Emergency Implementing Action,Consisting of Temporary Change Notice 02T ML20214U1761986-09-11011 September 1986 Public Version of Procedure Change Notice 3 to Rev 10 to Emergency Plan Implementing Procedure EPIP-3, Notification of Unusual Event Implementing Actions. W/860925 Release Memo ML20205E5391986-07-29029 July 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to EPIP-23, Fire Fighting, Rev 5 to EPIP-02, Emergency Classification & Rev 11 to EPIP-04, Alert,Site Area.. ML20211Q5951986-07-10010 July 1986 Public Version of Rev 10 to EPIP-03, Notification of Unusual Event Implementing Actions & Rev 4 to EPIP-15, Protective Action Guidelines. W/Procedure Change Notices 1 & 2 to EPIP-03 ML20212N2671986-07-0303 July 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 5 to EPIP-02, Emergency Classification & Rev 10 to EPIP-03, Notification of Unusual Event Implementing Actions ML17300A3731986-06-25025 June 1986 Rev 0 to Pump & Valve Inservice Testing Program, for Units 1,2 & 3 ML17300A2611986-05-29029 May 1986 Rev 0 to Inservice Insp Program Summary Manual. ML20155K1011986-04-17017 April 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 10 to EPIP-03 Re Notification of Unusual Event Implementing Actions & Rev 9 to EPIP-04 Re Alert Implementing Actions.W/Grimsley 860521 Release Memo ML20206E5991986-04-0808 April 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Index,Cancellation of Rev 2 to EPIP-28, Personnel Monitoring & Decontamination & Cancellation of Rev 2 to EPIP-29 ML17299B1791986-03-11011 March 1986 Public Version of Revised Emergency Plan Implememting Procedures EPIP 11,EPIP 19 & EPIP 20 & Revs 1 to Administrative Procedures 7N409.08.00 & 7N409.09.00, respectively.W/860409 Release Memo ML17299B0501986-02-21021 February 1986 Rev 2 to Operations Procedure 42AO-2ZZ50, Venting Charging Pumps. 1999-07-14
[Table view] |
Text
03/20/87 page 1 of 6 PALO VERDE NUCLEAR GENERATING STATION TEST/RETEST RECOVERY PROGRAM DIESEL GENERATOR"B" AND ASSOCIATED SUPPORT EQUIPMENT The following test/retest outline has been developed to summarize testing activities that will demonstrate the capability of Unit 3 Diesel Generator"B" and its support equipment.
Additional testing beyond that which is normally required is also identified herein to demonstrate that Diesel Generator"B"'ngine repair was conducted successfully,.
The following tests are scheduled to be performed.
1.COOPER ENERGY, (Initial Test)2.73PE-3DG01, (Mech.preop.carry over test)3.73PE-3PE01, (Elect.preop.carry over test)32ST-'9PE01, (El'e'ct.,surveillance test))5.'1ST-9DG01, (Mech.surveillance test)6.73ST-3DG01, (Integrated
'Safeguards test)10bi4~pO530 os><@gal A g704o ggCg 05@gal 0
03/20/87 page 2 of 6 UNIT 3 DIESEL GENERATOR"B" TEST/INSPECTIONS 1.0 COOPER ENERGY INITIAL TEST:.1.1 Web deflection measurements will be verified and recorded prior to the initial start.1.2 On the initial start DGB will be operated for approxi-mately 15 minutes, at no load.Continuous observation of engine operating parameters will be monitored, (i.e., temp, pressure, speed 8 vibration).
1.3 After the initial run all crankcase doors will be removed and the following performed:
1.3.1 All bearing caps (main and rod)will be inspected for unusual hot spots.1.3.2 1.3.3 1.3.4 Visual inspection for signs of water leaks.Hand check chains and tighteners.
General inspection of all exposed components for any signs of stress.1.3.5 If all inspections are satisfactory, DGB will be made ready for break-in.1.4 Break-in will require an initi'al 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> no load run followed by loading in 25X increments thru lOOX.A 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> time period will be imposed at each level of load before proceeding to the next level.All engine operating parameters will be in continuous observation and recorded on an hourly bases.
0 0 03/20/87 page 3 of 6 1.5 Interim inspection after break-in loading.1.5.1 1.5.2 Check for external leaks and distress.After 30 minutes following shutdown remove crankcase doors and immediately check the crankshaft web deflection per CB manual.1.5.3 Visually check inside of crankcase for abnormalities.
1.5.4 Review logs for abnormalities, if none are found replace crankcase doors.1.5.5 Start and gradually increase load to 100X over a two hour period.1.5.6 Increase load to 110X and hold for two hours.2.0 73PE-3DG01, (MECH.PREOP.CARRY OVER TEST)2.1 During performance of this test, DGB will be tested to those test objectives required to re-establish engine control and alarm functions.
3.0 73PE-3PE01, (ELECT.PREOP.CARRY OVER TEST)3.1 D'uring performance o'f this preoperational carry over test, DGB will'be subjected to about 92.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> at various load configurations.
88.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> will be at 100X load with 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 110X load.Approximately 40.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of the 100X-load time will be required for the 35 starts.The remaining 48.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> at 100X load will be performed after 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 110X.Acceptance criteria for the 35 starts requires that load be 50X or greater.In this case 100X load will be maintained during each of the 35 start runs.4.0 32ST-9PEOl, (ELECT.SURVEILLANCE TEST)4.1 This surveillance test does not load DGB and has a short run time of about one half hour.No mechanical inspec-tions are performed on the engine.Mechanical and elect-rical measurements are taken on the generator to verify that the diesel generator and its associated electrical equipment are in an operable condition.
~li
'03/20/87 page 4 of 6 5.0 31ST-9DG01, (MECH.SURVEILLANCE TEST)5.1 DGB surveillance testing will require two analyzer runs.One prior to disassembly and inspection, followed by a final one after reassembly.
The total run time for this test will be approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.5.2 The following mechanical inspections are performed.
5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 5.2'.6 5.2.7 5.2.8 5.2.9 5.2.10 5.2.11 5.2.12 Foundation Fastener Torque Checks Engine Analysis Hot Bearing Temperature Checks Hot Web Deflection Readings Crankshaft Main Bearing Clearances Connecting Rod Bearing Clearances Internal Inspection Inspect Rocker Arm Assemblies Adjust Tappets and Check.Camshaft Timing Auxiliary Drive Inspections Main Thrust Bearing Clearance Checks'5.2.13 Turbo Charger Inspection 5.2.14 5.2.15 Cold Meb Deflections
'J Camshaft Visual Che'ck 5.2.16 Air Timing, Checks'5.2.17 Post'Maintenance En'gine Analysis 5.2.18 5.2.19 Number 9 Bearin Shells Removed and Visuall Ins ected for Abnormal Near Number 9 Crank Pin will be Examined b Penetrant Ins ection 0 li 03/20/87 page 5 of 6 6.0 73ST-3DG01, (INTEGRATED SAFEGUARDS TEST)6.1 The integrated safeguards test will require approximately 33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> of engine run time.Loading of.DGB will include 25X load thru llOX.Approximately 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> of the 33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> will be spent at 100X or greater load.This test is to ensure that the Diesel Generator and associated support equipment will be able to support the plant as the different conditions are experienced through the performance of this Test, (i.e., LOCA, LOP, AFAS-l, AFAS-2 etc.).
03/20/87 page 6 of 6 UNIT 3 DIESEL GENERATOR"B" TEST TIME
SUMMARY
X LOAD COOPER INITIAL TEST 73PE-3DG01 ENGINE MECH.73PE-3PE01 32ST-9PE01 31ST-9DG01 ENG/GEN GEN.ENGINE ELECT.ELECT.MECH.73ST-3DG01, SAFEGUARDS SYSTEMS RUN TIME TOTAL 1.0.5.5.5 5.5 8.0 25 2.0.5.5.5 3.5 50 2.0.5.5 3.5 75 2.0.5.5.5 3.5 100 wi 4 0 4 88.5 8.0 24.0 124.5 110 TOTAL HOURS 13.0.0 92.5.5 10.0 2.0 33.0 6.0 149.0~TEST HOURS AT OR ABOVE 1007o LOAD THAT ARE IN ADDITION TO THOSE REQUIRED BY PVNGS FSAR 5 REG.GUIDE COMMITMENTS.
0 II