ML17319B342: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:PMPEPPINDEXINDIANA8,MICHIGANPO'djERCOMPANYDONALDC.COOKNUCLEARPLANTNMANAIedevIdentifcationNumberPMP2080EPP.001TitieEmergency PlanActivation andCondition Classification RevisionNo.fAndOatRevision24-27-82CommentsEPP.002EPP.003EPP.OOEPP;00EPP.006UnusualEventAlertSiteEmergency GeneralEmergency InitialDoseAssessment (Gaseous)
{{#Wiki_filter:PMP EPP INDEX INDIANA 8, MICHIGAN PO'djER COMPANY DONALD C.COOK NUCLEAR PLANT N MANA Iedev Identif cation Number PMP 2080 EPP.001 Ti tie Emergency Plan Activation and Condition Classification Revision No.f And Oat Revision 2 4-27-82 Comments EPP.002 EPP.003 EPP.OO EPP;00 EPP.006 Unusual Event Al ert Site Emergency General Emergency Initial Dose Assessment (Gaseous)CAiNCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81'".ev.2 4-27-82 EPP.007 EPP.008 EPP.009 EPP.010 EPP.011 EPP.012 Initial Release Assessments
CAiNCELLED 10-29-81CANCELLED 10-29-81CANCELLED 10-29-81CANCELLED 10-29-81'".ev.24-27-82EPP.007EPP.008EPP.009EPP.010EPP.011EPP.012InitialReleaseAssessments
'(Liquid)Calling Off-Duty Plant Personnel Fire Emergency Guidelines Toxic Gas Release Guidelines Natural Emergency Guidelines Initial Off-Site Notificatio Revision 0 4-1-81 Revision 1 4-29-82 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 1 4-27-82 TP-1,2-23-82 Exp NA P-1,4-30-82 Exp N/A 820b020083 820525 PDR*DOCK 05000315 F PDR R l.Da 5-5-7k  
'(Liquid)
''I PMP EPP INDEX INDIANA 85 MICHIGAN.QHER COMPANY DONALD C.COOK NUCLEAR PLA5NT PLANT MANAGER PROCEDURE Iedev Identification Number Title Revision Nc.i And Date Comments PMP 2081 EPP.014 EPP.015 EPP.016 EPP.017 EPP.018 EPP.019 EPP.020 EPP.021 EPP.022 EPP.023 Off-Site Dose Assessments Sampling and Analysis of Waterborne Releases Collection and Analysis of Liquid and Gaseous Samples Interpretation of Liquid and Gaseous Samples Transportation Accidents Involving Radioactive Material AEP Emergency Response Organization Activation and Management Activation and Operation of the Technical Support Center (TSC)Activation and Operation of the Operations Staging Area (OSA)and Personnel Accountabi 1 i ty Activation and Operation of the Recovery Center (RC)(An Emergency Operations Faci 1 i ty)Activation and Operation of the Emergency Control Center (ECC)(An Emergency Operations Facility)Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 l9 Revision 0 4-1-81 Revision 0 4-1-83 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 TP-1,2-25-82 Exp N/A Q/I i t TP-1,11-16-81 Exp N/A TP-2,3-12-82 Exp N/A TP-3,3-12-82 Exp N/A TP-1,11-16-81 Exp N/A EPP.024.Activation and Operation of the Joint Public Information Center (JPIC)(An Emergency Operations Facility)Revision 0 4-1-81 3 t I~w 0.ej IIIIDIAIIIA 8 HICHIGAII ELECTRIC COiÃPAAf V DONALD C.COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet This temporary sheet applies to (~I.>rhi Qpp'-Dug>Instruction or Procedure No.pNp ppBp Epp ppB Revision No.The following change ()new requirement (X)shall be instituted effective (Date)TEMPORARY SHEET NO.Add to Exhibit A under"Persons to be Called" by the Operations Superintendent.
CallingOff-DutyPlantPersonnel FireEmergency Guidelines ToxicGasReleaseGuidelines NaturalEmergency Guidelines InitialOff-SiteNotificatio Revision04-1-81Revision14-29-82Revision04-1-81Revision04-1-81Revision04-1-81Revision14-27-82TP-1,2-23-82 ExpNAP-1,4-30-82 ExpN/A820b020083 820525PDR*DOCK05000315FPDRRl.Da5-5-7k  
Fifth Shift Supervisor Add a section to Exhibit A Person to Nake Call Fifth Shift Supervisor Person To Be Called Fifth Shift Personnel DCR MAY 0 6 l981 Reason: Provide personnel to staff the Emergency Control Center This change should be made a permanent revision to the Instruction or Procedure:
''I PMPEPPINDEXINDIANA85MICHIGAN.QHERCOMPANYDONALDC.COOKNUCLEARPLA5NTPLANTMANAGERPROCEDURE IedevIdentification NumberTitleRevisionNc.iAndDateCommentsPMP2081EPP.014EPP.015EPP.016EPP.017EPP.018EPP.019EPP.020EPP.021EPP.022EPP.023Off-SiteDoseAssessments SamplingandAnalysisofWaterborne ReleasesCollection andAnalysisofLiquidandGaseousSamplesInterpretation ofLiquidandGaseousSamplesTransportation Accidents Involving Radioactive MaterialAEPEmergency ResponseOrganization Activation andManagement Activation andOperation oftheTechnical SupportCenter(TSC)Activation andOperation oftheOperations StagingArea(OSA)andPersonnel Accountabi 1ityActivation andOperation oftheRecoveryCenter(RC)(AnEmergency Operations Faci1ity)Activation andOperation oftheEmergency ControlCenter(ECC)(AnEmergency Operations Facility)
dfYES oNO 0 NOT KNOWN, additional review required Expiration Date: Originator:
Revision04-1-81Revision04-1-81Revision04-1-81Revision04-1-81l9Revision04-1-81Revision04-1-83Revision04-1-81Revision04-1-81Revision04-1-81Revision04-1-81TP-1,2-25-82 ExpN/AQ/IitTP-1,11-16-81 ExpN/ATP-2,3-12-82 ExpN/ATP-3,3-12-82 ExpN/ATP-1,11-16-81 ExpN/AEPP.024.Activation andOperation oftheJointPublicInformation Center(JPIC)(AnEmergency Operations Facility)
Management Staff: Senior Reactor Operator: PNSRC te 3/'"'-~Standard Dist.List No.: Distribution:
Revision04-1-813t I~w 0.ejIIIIDIAIIIA 8HICHIGAII ELECTRICCOiÃPAAfVDONALDC.COOKNUCLEARPLANTInstruction orProcedure Temporary SheetThistemporary sheetappliesto(~I.>rhiQpp'-Dug>
Form No.4330 REVISED 7/78 FORM NO.PMI 20104 REV.2 WHITE-ORIGINAL CANARY ORIGINATOR COPY PINK-WORKING COPY
Instruction orProcedure No.pNpppBpEppppBRevisionNo.Thefollowing change()newrequirement (X)shallbeinstituted effective (Date)TEMPORARY SHEETNO.AddtoExhibitAunder"PersonstobeCalled"bytheOperations Superintendent.
~~h A~l~IlDJA jtJA 5/&#xc3;ICHlGAlIl DONALD C.COOK NUCLEAR PLANT~~4 Instruction or Procedure Temporary Sheet This temporary sheet applies tohcTw4<<o!
FifthShiftSupervisor AddasectiontoExhibitAPersontoNakeCallFifthShiftSupervisor PersonToBeCalledFifthShiftPersonnel DCRMAY06l981Reason:Providepersonnel tostafftheEmergency ControlCenterThischangeshouldbemadeapermanent revisiontotheInstruction orProcedure:
A~o opcR4>o~of+he.Erne~<>>c.g Instruction or procedure No.PHP 2081 EPP 023 Ce~~Revision No.0 TEMPORARY SHEET NO.The following change ()new requirement (X)shall be instituted effective (Date)ADD the following sentence to section 2.0 A shift supervisor shall serve as ECCM until relieved by the Radiation Control and Maste Handling Manager.Revise 3.3.to read: 3.3 Ensure appropriate radiological monitoring is performed to assure the ECC is safe, and that security is provided.ADD Steps 3.12 and 3.13 3.12 Designate an individual to communicate directly with the TSC and record event data.3.13 Hake event data available to persons reporting to the ECC.!1 Reason: Clarify operation of the Emergency Control New York arrival on-site.OCR MAY 0 6 1981 This change should be made a permanent revision to the Instruction or Procedure:
dfYESoNO0NOTKNOWN,additional reviewrequiredExpiration Date:Originator:
ES a NO 0 NOT KNOWN, addittonal review required Expiration Date: Originator:
Management Staff:SeniorReactorOperator:
Management Staff: Senior Reactcr rator: Rant Manager X 7 Standard Dist.List No.: Distribution:
PNSRCte3/'"'-~StandardDist.ListNo.:Distribution:
Form No.4330 REVISED 7/78 FORA No.PMI 201&4 REV.2 WHITE-ORIGINAL CANARY-ORIGINATOR COPY PINK-WORKING COPY 0~~}}
FormNo.4330REVISED7/78FORMNO.PMI20104REV.2WHITE-ORIGINALCANARYORIGINATOR COPYPINK-WORKINGCOPY
~~hA~l~IlDJAjtJA5/&#xc3;ICHlGAlIl DONALDC.COOKNUCLEARPLANT~~4Instruction orProcedure Temporary SheetThistemporary sheetappliestohcTw4<<o!
A~oopcR4>o~of+he.Erne~<>>c.g Instruction orprocedure No.PHP2081EPP023Ce~~RevisionNo.0TEMPORARY SHEETNO.Thefollowing change()newrequirement (X)shallbeinstituted effective (Date)ADDthefollowing sentencetosection2.0Ashiftsupervisor shallserveasECCMuntilrelievedbytheRadiation ControlandMasteHandlingManager.Revise3.3.toread:3.3Ensureappropriate radiological monitoring isperformed toassuretheECCissafe,andthatsecurityisprovided.
ADDSteps3.12and3.133.12Designate anindividual tocommunicate directlywiththeTSCandrecordeventdata.3.13Hakeeventdataavailable topersonsreporting totheECC.!1Reason:Clarifyoperation oftheEmergency ControlNewYorkarrivalon-site.OCRMAY061981Thischangeshouldbemadeapermanent revisiontotheInstruction orProcedure:
ESaNO0NOTKNOWN,addittonal reviewrequiredExpiration Date:Originator:
Management Staff:SeniorReactcrrator:RantManagerX7StandardDist.ListNo.:Distribution:
FormNo.4330REVISED7/78FORANo.PMI201&4REV.2WHITE-ORIGINALCANARY-ORIGINATOR COPYPINK-WORKINGCOPY 0~~}}

Revision as of 10:03, 6 July 2018

Public Version of Procedure Temporary Sheets for Plant Manager Emergency Plan Procedures PMP 2080 EPP.008 Re Calling off-duty Plant Personnel & PMP 2081 EPP.023 Re Operation of Emergency Control Ctr
ML17319B342
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/06/1982
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17319B340 List:
References
PROC-820506-01, NUDOCS 8206020083
Download: ML17319B342 (7)


Text

PMP EPP INDEX INDIANA 8, MICHIGAN PO'djER COMPANY DONALD C.COOK NUCLEAR PLANT N MANA Iedev Identif cation Number PMP 2080 EPP.001 Ti tie Emergency Plan Activation and Condition Classification Revision No.f And Oat Revision 2 4-27-82 Comments EPP.002 EPP.003 EPP.OO EPP;00 EPP.006 Unusual Event Al ert Site Emergency General Emergency Initial Dose Assessment (Gaseous)CAiNCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81'".ev.2 4-27-82 EPP.007 EPP.008 EPP.009 EPP.010 EPP.011 EPP.012 Initial Release Assessments

'(Liquid)Calling Off-Duty Plant Personnel Fire Emergency Guidelines Toxic Gas Release Guidelines Natural Emergency Guidelines Initial Off-Site Notificatio Revision 0 4-1-81 Revision 1 4-29-82 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 1 4-27-82 TP-1,2-23-82 Exp NA P-1,4-30-82 Exp N/A 820b020083 820525 PDR*DOCK 05000315 F PDR R l.Da 5-5-7k

I PMP EPP INDEX INDIANA 85 MICHIGAN.QHER COMPANY DONALD C.COOK NUCLEAR PLA5NT PLANT MANAGER PROCEDURE Iedev Identification Number Title Revision Nc.i And Date Comments PMP 2081 EPP.014 EPP.015 EPP.016 EPP.017 EPP.018 EPP.019 EPP.020 EPP.021 EPP.022 EPP.023 Off-Site Dose Assessments Sampling and Analysis of Waterborne Releases Collection and Analysis of Liquid and Gaseous Samples Interpretation of Liquid and Gaseous Samples Transportation Accidents Involving Radioactive Material AEP Emergency Response Organization Activation and Management Activation and Operation of the Technical Support Center (TSC)Activation and Operation of the Operations Staging Area (OSA)and Personnel Accountabi 1 i ty Activation and Operation of the Recovery Center (RC)(An Emergency Operations Faci 1 i ty)Activation and Operation of the Emergency Control Center (ECC)(An Emergency Operations Facility)Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 l9 Revision 0 4-1-81 Revision 0 4-1-83 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 TP-1,2-25-82 Exp N/A Q/I i t TP-1,11-16-81 Exp N/A TP-2,3-12-82 Exp N/A TP-3,3-12-82 Exp N/A TP-1,11-16-81 Exp N/A EPP.024.Activation and Operation of the Joint Public Information Center (JPIC)(An Emergency Operations Facility)Revision 0 4-1-81 3 t I~w 0.ej IIIIDIAIIIA 8 HICHIGAII ELECTRIC COiÃPAAf V DONALD C.COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet This temporary sheet applies to (~I.>rhi Qpp'-Dug>Instruction or Procedure No.pNp ppBp Epp ppB Revision No.The following change ()new requirement (X)shall be instituted effective (Date)TEMPORARY SHEET NO.Add to Exhibit A under"Persons to be Called" by the Operations Superintendent.

Fifth Shift Supervisor Add a section to Exhibit A Person to Nake Call Fifth Shift Supervisor Person To Be Called Fifth Shift Personnel DCR MAY 0 6 l981 Reason: Provide personnel to staff the Emergency Control Center This change should be made a permanent revision to the Instruction or Procedure:

dfYES oNO 0 NOT KNOWN, additional review required Expiration Date: Originator:

Management Staff: Senior Reactor Operator: PNSRC te 3/'"'-~Standard Dist.List No.: Distribution:

Form No.4330 REVISED 7/78 FORM NO.PMI 20104 REV.2 WHITE-ORIGINAL CANARY ORIGINATOR COPY PINK-WORKING COPY

~~h A~l~IlDJA jtJA 5/ÃICHlGAlIl DONALD C.COOK NUCLEAR PLANT~~4 Instruction or Procedure Temporary Sheet This temporary sheet applies tohcTw4<<o!

A~o opcR4>o~of+he.Erne~<>>c.g Instruction or procedure No.PHP 2081 EPP 023 Ce~~Revision No.0 TEMPORARY SHEET NO.The following change ()new requirement (X)shall be instituted effective (Date)ADD the following sentence to section 2.0 A shift supervisor shall serve as ECCM until relieved by the Radiation Control and Maste Handling Manager.Revise 3.3.to read: 3.3 Ensure appropriate radiological monitoring is performed to assure the ECC is safe, and that security is provided.ADD Steps 3.12 and 3.13 3.12 Designate an individual to communicate directly with the TSC and record event data.3.13 Hake event data available to persons reporting to the ECC.!1 Reason: Clarify operation of the Emergency Control New York arrival on-site.OCR MAY 0 6 1981 This change should be made a permanent revision to the Instruction or Procedure:

ES a NO 0 NOT KNOWN, addittonal review required Expiration Date: Originator:

Management Staff: Senior Reactcr rator: Rant Manager X 7 Standard Dist.List No.: Distribution:

Form No.4330 REVISED 7/78 FORA No.PMI 201&4 REV.2 WHITE-ORIGINAL CANARY-ORIGINATOR COPY PINK-WORKING COPY 0~~