|
|
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:PMPEPPINDEXINDIANA8,MICHIGANPO'djERCOMPANYDONALDC.COOKNUCLEARPLANTNMANAIedevIdentifcationNumberPMP2080EPP.001TitieEmergency PlanActivation andCondition Classification RevisionNo.fAndOatRevision24-27-82CommentsEPP.002EPP.003EPP.OOEPP;00EPP.006UnusualEventAlertSiteEmergency GeneralEmergency InitialDoseAssessment (Gaseous) | | {{#Wiki_filter:PMP EPP INDEX INDIANA 8, MICHIGAN PO'djER COMPANY DONALD C.COOK NUCLEAR PLANT N MANA Iedev Identif cation Number PMP 2080 EPP.001 Ti tie Emergency Plan Activation and Condition Classification Revision No.f And Oat Revision 2 4-27-82 Comments EPP.002 EPP.003 EPP.OO EPP;00 EPP.006 Unusual Event Al ert Site Emergency General Emergency Initial Dose Assessment (Gaseous)CAiNCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81'".ev.2 4-27-82 EPP.007 EPP.008 EPP.009 EPP.010 EPP.011 EPP.012 Initial Release Assessments |
| CAiNCELLED 10-29-81CANCELLED 10-29-81CANCELLED 10-29-81CANCELLED 10-29-81'".ev.24-27-82EPP.007EPP.008EPP.009EPP.010EPP.011EPP.012InitialReleaseAssessments | | '(Liquid)Calling Off-Duty Plant Personnel Fire Emergency Guidelines Toxic Gas Release Guidelines Natural Emergency Guidelines Initial Off-Site Notificatio Revision 0 4-1-81 Revision 1 4-29-82 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 1 4-27-82 TP-1,2-23-82 Exp NA P-1,4-30-82 Exp N/A 820b020083 820525 PDR*DOCK 05000315 F PDR R l.Da 5-5-7k |
| '(Liquid) | | ''I PMP EPP INDEX INDIANA 85 MICHIGAN.QHER COMPANY DONALD C.COOK NUCLEAR PLA5NT PLANT MANAGER PROCEDURE Iedev Identification Number Title Revision Nc.i And Date Comments PMP 2081 EPP.014 EPP.015 EPP.016 EPP.017 EPP.018 EPP.019 EPP.020 EPP.021 EPP.022 EPP.023 Off-Site Dose Assessments Sampling and Analysis of Waterborne Releases Collection and Analysis of Liquid and Gaseous Samples Interpretation of Liquid and Gaseous Samples Transportation Accidents Involving Radioactive Material AEP Emergency Response Organization Activation and Management Activation and Operation of the Technical Support Center (TSC)Activation and Operation of the Operations Staging Area (OSA)and Personnel Accountabi 1 i ty Activation and Operation of the Recovery Center (RC)(An Emergency Operations Faci 1 i ty)Activation and Operation of the Emergency Control Center (ECC)(An Emergency Operations Facility)Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 l9 Revision 0 4-1-81 Revision 0 4-1-83 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 TP-1,2-25-82 Exp N/A Q/I i t TP-1,11-16-81 Exp N/A TP-2,3-12-82 Exp N/A TP-3,3-12-82 Exp N/A TP-1,11-16-81 Exp N/A EPP.024.Activation and Operation of the Joint Public Information Center (JPIC)(An Emergency Operations Facility)Revision 0 4-1-81 3 t I~w 0.ej IIIIDIAIIIA 8 HICHIGAII ELECTRIC COiÃPAAf V DONALD C.COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet This temporary sheet applies to (~I.>rhi Qpp'-Dug>Instruction or Procedure No.pNp ppBp Epp ppB Revision No.The following change ()new requirement (X)shall be instituted effective (Date)TEMPORARY SHEET NO.Add to Exhibit A under"Persons to be Called" by the Operations Superintendent. |
| CallingOff-DutyPlantPersonnel FireEmergency Guidelines ToxicGasReleaseGuidelines NaturalEmergency Guidelines InitialOff-SiteNotificatio Revision04-1-81Revision14-29-82Revision04-1-81Revision04-1-81Revision04-1-81Revision14-27-82TP-1,2-23-82 ExpNAP-1,4-30-82 ExpN/A820b020083 820525PDR*DOCK05000315FPDRRl.Da5-5-7k
| | Fifth Shift Supervisor Add a section to Exhibit A Person to Nake Call Fifth Shift Supervisor Person To Be Called Fifth Shift Personnel DCR MAY 0 6 l981 Reason: Provide personnel to staff the Emergency Control Center This change should be made a permanent revision to the Instruction or Procedure: |
| ''I PMPEPPINDEXINDIANA85MICHIGAN.QHERCOMPANYDONALDC.COOKNUCLEARPLA5NTPLANTMANAGERPROCEDURE IedevIdentification NumberTitleRevisionNc.iAndDateCommentsPMP2081EPP.014EPP.015EPP.016EPP.017EPP.018EPP.019EPP.020EPP.021EPP.022EPP.023Off-SiteDoseAssessments SamplingandAnalysisofWaterborne ReleasesCollection andAnalysisofLiquidandGaseousSamplesInterpretation ofLiquidandGaseousSamplesTransportation Accidents Involving Radioactive MaterialAEPEmergency ResponseOrganization Activation andManagement Activation andOperation oftheTechnical SupportCenter(TSC)Activation andOperation oftheOperations StagingArea(OSA)andPersonnel Accountabi 1ityActivation andOperation oftheRecoveryCenter(RC)(AnEmergency Operations Faci1ity)Activation andOperation oftheEmergency ControlCenter(ECC)(AnEmergency Operations Facility) | | dfYES oNO 0 NOT KNOWN, additional review required Expiration Date: Originator: |
| Revision04-1-81Revision04-1-81Revision04-1-81Revision04-1-81l9Revision04-1-81Revision04-1-83Revision04-1-81Revision04-1-81Revision04-1-81Revision04-1-81TP-1,2-25-82 ExpN/AQ/IitTP-1,11-16-81 ExpN/ATP-2,3-12-82 ExpN/ATP-3,3-12-82 ExpN/ATP-1,11-16-81 ExpN/AEPP.024.Activation andOperation oftheJointPublicInformation Center(JPIC)(AnEmergency Operations Facility)
| | Management Staff: Senior Reactor Operator: PNSRC te 3/'"'-~Standard Dist.List No.: Distribution: |
| Revision04-1-813t I~w 0.ejIIIIDIAIIIA 8HICHIGAII ELECTRICCOiÃPAAfVDONALDC.COOKNUCLEARPLANTInstruction orProcedure Temporary SheetThistemporary sheetappliesto(~I.>rhiQpp'-Dug>
| | Form No.4330 REVISED 7/78 FORM NO.PMI 20104 REV.2 WHITE-ORIGINAL CANARY ORIGINATOR COPY PINK-WORKING COPY |
| Instruction orProcedure No.pNpppBpEppppBRevisionNo.Thefollowing change()newrequirement (X)shallbeinstituted effective (Date)TEMPORARY SHEETNO.AddtoExhibitAunder"PersonstobeCalled"bytheOperations Superintendent. | | ~~h A~l~IlDJA jtJA 5/ÃICHlGAlIl DONALD C.COOK NUCLEAR PLANT~~4 Instruction or Procedure Temporary Sheet This temporary sheet applies tohcTw4<<o! |
| FifthShiftSupervisor AddasectiontoExhibitAPersontoNakeCallFifthShiftSupervisor PersonToBeCalledFifthShiftPersonnel DCRMAY06l981Reason:Providepersonnel tostafftheEmergency ControlCenterThischangeshouldbemadeapermanent revisiontotheInstruction orProcedure:
| | A~o opcR4>o~of+he.Erne~<>>c.g Instruction or procedure No.PHP 2081 EPP 023 Ce~~Revision No.0 TEMPORARY SHEET NO.The following change ()new requirement (X)shall be instituted effective (Date)ADD the following sentence to section 2.0 A shift supervisor shall serve as ECCM until relieved by the Radiation Control and Maste Handling Manager.Revise 3.3.to read: 3.3 Ensure appropriate radiological monitoring is performed to assure the ECC is safe, and that security is provided.ADD Steps 3.12 and 3.13 3.12 Designate an individual to communicate directly with the TSC and record event data.3.13 Hake event data available to persons reporting to the ECC.!1 Reason: Clarify operation of the Emergency Control New York arrival on-site.OCR MAY 0 6 1981 This change should be made a permanent revision to the Instruction or Procedure: |
| dfYESoNO0NOTKNOWN,additional reviewrequiredExpiration Date:Originator:
| | ES a NO 0 NOT KNOWN, addittonal review required Expiration Date: Originator: |
| Management Staff:SeniorReactorOperator: | | Management Staff: Senior Reactcr rator: Rant Manager X 7 Standard Dist.List No.: Distribution: |
| PNSRCte3/'"'-~StandardDist.ListNo.:Distribution:
| | Form No.4330 REVISED 7/78 FORA No.PMI 201&4 REV.2 WHITE-ORIGINAL CANARY-ORIGINATOR COPY PINK-WORKING COPY 0~~}} |
| FormNo.4330REVISED7/78FORMNO.PMI20104REV.2WHITE-ORIGINALCANARYORIGINATOR COPYPINK-WORKINGCOPY
| |
| ~~hA~l~IlDJAjtJA5/ÃICHlGAlIl DONALDC.COOKNUCLEARPLANT~~4Instruction orProcedure Temporary SheetThistemporary sheetappliestohcTw4<<o! | |
| A~oopcR4>o~of+he.Erne~<>>c.g Instruction orprocedure No.PHP2081EPP023Ce~~RevisionNo.0TEMPORARY SHEETNO.Thefollowing change()newrequirement (X)shallbeinstituted effective (Date)ADDthefollowing sentencetosection2.0Ashiftsupervisor shallserveasECCMuntilrelievedbytheRadiation ControlandMasteHandlingManager.Revise3.3.toread:3.3Ensureappropriate radiological monitoring isperformed toassuretheECCissafe,andthatsecurityisprovided. | |
| ADDSteps3.12and3.133.12Designate anindividual tocommunicate directlywiththeTSCandrecordeventdata.3.13Hakeeventdataavailable topersonsreporting totheECC.!1Reason:Clarifyoperation oftheEmergency ControlNewYorkarrivalon-site.OCRMAY061981Thischangeshouldbemadeapermanent revisiontotheInstruction orProcedure:
| |
| ESaNO0NOTKNOWN,addittonal reviewrequiredExpiration Date:Originator:
| |
| Management Staff:SeniorReactcrrator:RantManagerX7StandardDist.ListNo.:Distribution: | |
| FormNo.4330REVISED7/78FORANo.PMI201&4REV.2WHITE-ORIGINALCANARY-ORIGINATOR COPYPINK-WORKINGCOPY 0~~}}
| |
Similar Documents at Cook |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17326A1471999-05-28028 May 1999 Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2. ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA 1999-09-23
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4701996-02-0808 February 1996 In-Service Pump Test Plan, Units 1 & 2 ML17334B5661995-11-30030 November 1995 Vols I & II of Third 10-Yr Interval Long-Term Inservice Exam Plan for Class,1,2 & 3 Sys & Components for DC Cook Nuclear Plant,Unit 1, Final Plan ML17334B5671995-11-30030 November 1995 Vols I & II of Third 10-Yr Interval Long-Term Inservice Exam Plan for Class 1,2 & 3 Sys & Components for DC Cook Nuclear Plant,Unit 2, Final Plan ML17332A2521994-08-0303 August 1994 Rev 3 to Plant Manager Procedure (PMP) 12 PMP 3150 PCP.100, Radwaste Pcp. ML17332A2491994-08-0303 August 1994 Rev 7 to Plant Manager Procedure (PMP) 12 PMP 6010 OSD.001, Odcm. ML20063K0631994-02-11011 February 1994 Change Sheet 1 to Rev 5 to Plant Manager Procedure (PMP) 12 PMP 6010 RPP.304, Use of HEPA Vacuum Cleaners. W/ Updated Index,Page 14 ML17331B0441993-11-0909 November 1993 Rev 15 to Emergency Response Manual. W/931109 Ltr ML17334B4851993-08-0909 August 1993 Rev 14 to Emergency Response Manual. W/930809 Ltr ML17334B4821993-04-0202 April 1993 Rev 3 of Pump Inservice Test Program. ML17329A5431992-06-11011 June 1992 Change Sheet 7 to Rev 6 to Procedure PMP 2080 EPP.107, Notification of Plant Personnel. ML20077S7281991-03-14014 March 1991 Rev 3 to PMP 6010.OSD.001, Odcm ML17325B3791990-03-0101 March 1990 Change Sheet 1 to Rev 3 to Procedure PMP 2080 EPP.106, Initial Offsite Notification. ML17334B3551990-02-0505 February 1990 Rev 2 to DC Cook Nuclear Plant Units 1 & 2 Inservice Testing Pump Program. ML17334B3561990-02-0505 February 1990 Rev 3 to DC Cook Nuclear Plant Unit 2 Inservice Testing Valve Program. ML17334B3571990-02-0505 February 1990 Rev 3 to DC Cook Nuclear Plant Unit 1 Inservice Testing Valve Program. ML20246M2191989-03-21021 March 1989 Procedure MS-3.2.1.9-1B, Maint & Surveillance Ite Medium Voltage Switchgear Equipment ML17325B0511988-12-0909 December 1988 Interim Acceptance Criteria for Safety-Related Piping Sys. ML17334B1491987-10-0505 October 1987 Rev 2 to DC Cook Nuclear Plant Unit 1 Inservice Testing Valve Program. ML17334B1501987-10-0505 October 1987 Rev 2 to DC Cook Nuclear Plant Unit 2 Inservice Testing Valve Program. ML20212A3191986-10-0202 October 1986 Rev 1 to Procedure 12 PMP 4021 TRP.001, Reactor Trip Review ML17324A9301986-05-29029 May 1986 Rev 0 to Procedure 1MHP2140.082.001, Maint Procedure for Repowering RHR Pump. ML17324A9321986-05-29029 May 1986 Rev 0 to Procedure 1MHP2140.082.003, Maint Procedure for Repowering Pressurizer Backup Heaters. ML17324A9331986-05-29029 May 1986 Rev 0 to Procedure 1MHP2140.082.005, Maint Procedure for Repowering Containment Valves. ML17324A9341986-05-29029 May 1986 Rev 0 to Procedure 1 Thp 6030 IMP.304, Pressurizer PORV Cable Repair. ML17324A9351986-05-29029 May 1986 Rev 0 to Procedure 1 Thp 6030 IMP.305, App R Post-Fire Repowering of In-Containment Valves. ML17334A9711986-05-22022 May 1986 Rev 0 to Procedure 12-OHP 4023.100.001, Unit 1 Emergency Remote Shutdown. ML20213F6011986-05-15015 May 1986 Rev 1 to Procedure PMP 6010.OSD.001, Offsite Dose Calculation Manual ML17324A9001986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part Iv,Training for Donald C Cook Nuclear Plant Emergency Operating Procedures. ML17324A8991986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part Ii,Writers Guide for Donald C Cook Nuclear Plant Emergency Operating Procedures. ML17324A8971986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part I,Specific Technical Guidelines for Donald C Cook Nuclear Plant. ML18005A0161986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part III, Verification/Validation for Donald C Cook Nuclear Plant Emergency Operating Procedures. ML20195C5361986-03-15015 March 1986 Public Version of Emergency Response Manual for DC Cook Nuclear Plant ML20141D7121986-02-28028 February 1986 Rev 0 to Master Insp Plan ML20137J6061985-12-17017 December 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 2 to Erp 2.07, Outside Agency Liaison, Rev 1 to Erp 2.08, Initial Assessment Group Runner & Rev 2 to Erp 5.01.W/860117 Release Memo ML17334A9441985-11-0505 November 1985 Change Sheet 1 of Rev 9 to Spec DCCFP101QCN, Matl & Application Spec - Initial & Repair Installations, Revising App D Silicon Foam Scope of Work to Identify New Fire Barriers & for Cross Referencing Fire Zones ML17334A9191985-10-15015 October 1985 Implementation Plan of Reg Guide 1.97,Rev 3 for Donald C Cook Nuclear Plant Units 1 & 2, Status Rept 1999-05-07
[Table view] |
Text
PMP EPP INDEX INDIANA 8, MICHIGAN PO'djER COMPANY DONALD C.COOK NUCLEAR PLANT N MANA Iedev Identif cation Number PMP 2080 EPP.001 Ti tie Emergency Plan Activation and Condition Classification Revision No.f And Oat Revision 2 4-27-82 Comments EPP.002 EPP.003 EPP.OO EPP;00 EPP.006 Unusual Event Al ert Site Emergency General Emergency Initial Dose Assessment (Gaseous)CAiNCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81'".ev.2 4-27-82 EPP.007 EPP.008 EPP.009 EPP.010 EPP.011 EPP.012 Initial Release Assessments
'(Liquid)Calling Off-Duty Plant Personnel Fire Emergency Guidelines Toxic Gas Release Guidelines Natural Emergency Guidelines Initial Off-Site Notificatio Revision 0 4-1-81 Revision 1 4-29-82 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 1 4-27-82 TP-1,2-23-82 Exp NA P-1,4-30-82 Exp N/A 820b020083 820525 PDR*DOCK 05000315 F PDR R l.Da 5-5-7k
I PMP EPP INDEX INDIANA 85 MICHIGAN.QHER COMPANY DONALD C.COOK NUCLEAR PLA5NT PLANT MANAGER PROCEDURE Iedev Identification Number Title Revision Nc.i And Date Comments PMP 2081 EPP.014 EPP.015 EPP.016 EPP.017 EPP.018 EPP.019 EPP.020 EPP.021 EPP.022 EPP.023 Off-Site Dose Assessments Sampling and Analysis of Waterborne Releases Collection and Analysis of Liquid and Gaseous Samples Interpretation of Liquid and Gaseous Samples Transportation Accidents Involving Radioactive Material AEP Emergency Response Organization Activation and Management Activation and Operation of the Technical Support Center (TSC)Activation and Operation of the Operations Staging Area (OSA)and Personnel Accountabi 1 i ty Activation and Operation of the Recovery Center (RC)(An Emergency Operations Faci 1 i ty)Activation and Operation of the Emergency Control Center (ECC)(An Emergency Operations Facility)Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 l9 Revision 0 4-1-81 Revision 0 4-1-83 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 TP-1,2-25-82 Exp N/A Q/I i t TP-1,11-16-81 Exp N/A TP-2,3-12-82 Exp N/A TP-3,3-12-82 Exp N/A TP-1,11-16-81 Exp N/A EPP.024.Activation and Operation of the Joint Public Information Center (JPIC)(An Emergency Operations Facility)Revision 0 4-1-81 3 t I~w 0.ej IIIIDIAIIIA 8 HICHIGAII ELECTRIC COiÃPAAf V DONALD C.COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet This temporary sheet applies to (~I.>rhi Qpp'-Dug>Instruction or Procedure No.pNp ppBp Epp ppB Revision No.The following change ()new requirement (X)shall be instituted effective (Date)TEMPORARY SHEET NO.Add to Exhibit A under"Persons to be Called" by the Operations Superintendent.
Fifth Shift Supervisor Add a section to Exhibit A Person to Nake Call Fifth Shift Supervisor Person To Be Called Fifth Shift Personnel DCR MAY 0 6 l981 Reason: Provide personnel to staff the Emergency Control Center This change should be made a permanent revision to the Instruction or Procedure:
dfYES oNO 0 NOT KNOWN, additional review required Expiration Date: Originator:
Management Staff: Senior Reactor Operator: PNSRC te 3/'"'-~Standard Dist.List No.: Distribution:
Form No.4330 REVISED 7/78 FORM NO.PMI 20104 REV.2 WHITE-ORIGINAL CANARY ORIGINATOR COPY PINK-WORKING COPY
~~h A~l~IlDJA jtJA 5/ÃICHlGAlIl DONALD C.COOK NUCLEAR PLANT~~4 Instruction or Procedure Temporary Sheet This temporary sheet applies tohcTw4<<o!
A~o opcR4>o~of+he.Erne~<>>c.g Instruction or procedure No.PHP 2081 EPP 023 Ce~~Revision No.0 TEMPORARY SHEET NO.The following change ()new requirement (X)shall be instituted effective (Date)ADD the following sentence to section 2.0 A shift supervisor shall serve as ECCM until relieved by the Radiation Control and Maste Handling Manager.Revise 3.3.to read: 3.3 Ensure appropriate radiological monitoring is performed to assure the ECC is safe, and that security is provided.ADD Steps 3.12 and 3.13 3.12 Designate an individual to communicate directly with the TSC and record event data.3.13 Hake event data available to persons reporting to the ECC.!1 Reason: Clarify operation of the Emergency Control New York arrival on-site.OCR MAY 0 6 1981 This change should be made a permanent revision to the Instruction or Procedure:
ES a NO 0 NOT KNOWN, addittonal review required Expiration Date: Originator:
Management Staff: Senior Reactcr rator: Rant Manager X 7 Standard Dist.List No.: Distribution:
Form No.4330 REVISED 7/78 FORA No.PMI 201&4 REV.2 WHITE-ORIGINAL CANARY-ORIGINATOR COPY PINK-WORKING COPY 0~~