IR 05000397/2015401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 20: Line 20:
{{#Wiki_filter:" " September 1, 2015  
{{#Wiki_filter:" " September 1, 2015  


Mr. Mark Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968
Mr. Mark Chief Executive Officer  
 
Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968


SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR COLUMBIA GENERATING STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000397/2015401)
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR COLUMBIA GENERATING STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000397/2015401)


==Dear Mr. Reddemann:==
==Dear Mr. Reddemann:==
On August 11, 2015, the NRC completed its mid-cycle performance review of Columbia Generating Station. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.
On August 11, 2015, the NRC completed its mid-cycle performance review of Columbia Generating Station. The results of that rev iew have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.


The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.


While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
Line 36: Line 39:


Sincerely,/RA/
Sincerely,/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-397 License No. NPF-21  
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety  
 
Docket No. 50-397 License No. NPF-21  


===Enclosure:===
===Enclosure:===
Line 42: Line 47:


cc w/encl:
cc w/encl:
Mr. Kurt R. Gosney Security Operations Manager Energy Northwest Columbia Generating Station PE-30 76 North Power Plant Loop Richland, WA 99352 cc w/o encl:
Mr. Kurt R. Gosney Security Operations Manager Energy Northwest  
 
Columbia Generating Station PE-30 76 North Power Plant Loop Richland, WA 99352  
 
cc w/o encl:
Electronic Distribution
Electronic Distribution
}}
}}

Revision as of 20:40, 30 June 2018

Non-Public Security Inspection Plan for Columbia Generating Station (NRC Physical Security Inspection Report Number 05000397/2015401)
ML15244B101
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/01/2015
From: Haire M S
Plant Support Branch-1
To: Reddemann M E
Energy Northwest
References
IR 2015401
Download: ML15244B101 (4)


Text

" " September 1, 2015

Mr. Mark Chief Executive Officer

Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR COLUMBIA GENERATING STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000397/2015401)

Dear Mr. Reddemann:

On August 11, 2015, the NRC completed its mid-cycle performance review of Columbia Generating Station. The results of that rev iew have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 50-397 License No. NPF-21

Enclosure:

Inspection Plan

cc w/encl:

Mr. Kurt R. Gosney Security Operations Manager Energy Northwest

Columbia Generating Station PE-30 76 North Power Plant Loop Richland, WA 99352

cc w/o encl:

Electronic Distribution