| {{#Wiki_filter:~i,REGULATORYNFORMATIONDISTRIBUTIONSEM(RIDS)ACCESSIONNBR:8501150082.DOCDATE:85/Oi/10NOTARIZED:,NOFACIL:50-335St,LucioPlantiUnitiiFloridaPower8LightCo.AUTH',NAME'UTHORAFFILIATIONNILLIAMSEJON,FloridaPowerLLightCo.RECIP~NAMERECIPIENTAFFILIATIONMILLER'~RsOperatingReactorsBranch3DOCKET05000335 | | {{#Wiki_filter:~i,REGULATORY NFORMATION DISTRIBUTION SEM(RIDS)ACCESSION NBR:8501150082. |
| | DOCDATE:85/Oi/10NOTARIZED:, |
| | NOFACIL:50-335 St,LucioPlantiUnitiiFloridaPower8LightCo.AUTH',NAME |
| | 'UTHORAFFILIATION NILLIAMSE JON,FloridaPowerLLightCo.RECIP~NAMERECIPIENT AFFILIATION MILLER'~RsOperating ReactorsBranch3DOCKET05000335 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Forwardsaddiinforesafeloadpathsitestipgofcranecontrols8speciallifting,devicesin'esponsetoNRC830524reviewofutilresponsetoNUREG-0612'ControlofHeavyLoadsatNuclearPowerPlants."DISTRISUTIONCODE:A033DCOPIESRECEIVED:LTR)ENCLgSIZE:"JJ.TITLE:ORSubmittal:USIA"36ControlofHeavyLoadNearSpentFuel"NUREG06NOTES:OLs02'/01/7605000335RECIPIENTIDCODE/NAMENRR'RB3BCINTERNAL'CRS13NRRNEIGHBORS09NRR/DL/TAPMGNRR/DSI/ASBRGN2COPIESLTTRENCL776611111111RECIPIENTIDCODE/NAMENRRSINGHAMA01ADM/LFMBNRR/DL/DRAB12NEFILE00COPIESLTTRENCLEXTERNAL;LPDRNSIC030611NRCPDR0211TOTALNUMBEROFCOPIESREQUIRED:LTTR28ENCL27 I,>>rrhfffhIl'hH~~~~1w4~h4~hIWilWr>>rIhtpi>>wllw$4>>fff4Ft11f1I1IWWl(r44WIhFI>>FIfrhIIXV4~Fl yAhzFLORIDAPOWER&LIGHTCOMPANYJanuaryl0,l985L-85-17OfficeofNuclearReactorRegulationAttention:Mr.JamesR.Miller,ChiefOperatingReactorsBranchIII3DivisionofLicensingU.S.NuclearRegulatoryCommissionWashington,D.C.20555
| | Forwardsaddiinforesafeloadpathsitestipg ofcranecontrols8speciallifting,devicesin'esponse toNRC830524reviewofutilresponsetoNUREG-0612'Control ofHeavyLoadsatNuclearPowerPlants."DISTRISUTION CODE:A033DCOPIESRECEIVED:LTR |
| | )ENCLgSIZE:"JJ.TITLE:ORSubmittal: |
| | USIA"36ControlofHeavyLoadNearSpentFuel"NUREG 06NOTES:OLs02'/01/76 05000335RECIPIENT IDCODE/NAME NRR'RB3BCINTERNAL'CRS 13NRRNEIGHBORS09NRR/DL/TAPMG NRR/DSI/ASB RGN2COPIESLTTRENCL776611111111RECIPIENT IDCODE/NAME NRRSINGHAMA01ADM/LFMBNRR/DL/DRAB 12NEFILE00COPIESLTTRENCLEXTERNAL; LPDRNSIC030611NRCPDR0211TOTALNUMBEROFCOPIESREQUIRED: |
| | LTTR28ENCL27 I,>>rrhfffhIl'hH~~~~1w4~h4~hIWilWr>>rIhtpi>>wllw$4>>fff4Ft11f1I1IWWl(r44WIhFI>>FIfrhIIXV4~Fl yAhzFLORIDAPOWER&LIGHTCOMPANYJanuaryl0,l985L-85-17OfficeofNuclearReactorRegulation Attention: |
| | Mr.JamesR.Miller,ChiefOperating ReactorsBranchIII3DivisionofLicensing U.S.NuclearRegulatory Commission Washington, D.C.20555 |
|
| |
|
| ==DearMr.fliller:== | | ==DearMr.fliller:== |
| Re:St.LucieUnit1DocketNo.50-335ControlofHeavyLoadsAdrafttechnicalevaluationreportwasprovidedwiththeNRCletterdatedMay24,1983.ThisreportprovidedtheresultsoftheNRCcontractor'sreviewofFloridaPower8Light'sresponsetoNUREG-0612,"ControlofHeavyLoadsatNuclearPowerPlants"forSt.LucieUnit1.Additionalinformationconcerningsafeloadpaths,testingofcranecontrolsandspecialliftingdevicesisprovidedintheattachmenttothisletter.Shouldyouoryourstaffhaveanyquestionsonthisinformation,pleasecontactus.Verytrulyyours,J.W.Williams,Jr.GroupVicePresidentNuclearEnergyJWW/PLP/jsAttachmentcc:J.P.O'Reilly,RegionIIHaroldF.Reis,EsquirePNS-LI-85-016-1I~P>iSOOBDRAD0O~BSOlgppPQPPPB~~PDRPEOPLE...SERVINGPEOPLE | | Re:St.LucieUnit1DocketNo.50-335ControlofHeavyLoadsAdrafttechnical evaluation reportwasprovidedwiththeNRCletterdatedMay24,1983.ThisreportprovidedtheresultsoftheNRCcontractor's reviewofFloridaPower8Light'sresponsetoNUREG-0612, "ControlofHeavyLoadsatNuclearPowerPlants"forSt.LucieUnit1.Additional information concerning safeloadpaths, testingofcranecontrolsandspecialliftingdevicesisprovidedintheattachment tothisletter.Shouldyouoryourstaffhaveanyquestions onthisinformation, pleasecontactus.Verytrulyyours,J.W.Williams, Jr.GroupVicePresident NuclearEnergyJWW/PLP/js Attachment cc:J.P.O'Reilly, RegionIIHaroldF.Reis,EsquirePNS-LI-85-016-1 I~P>iSOOBDRAD0O~BSOlgppPQPPPB~~PDRPEOPLE... |
| ~~ATTACHMENTRe:St.LucieUnit1DocketNo.50-335ControlofHeavyLoadsFPLresponsestodraftTechnicalEvaluationReportitems.2.1GENERALGUIDELINES2.1.1NUREG-0612,OverheadHeavyLoadHandlinSystemsReviewerConclusionandRecommendationTheLicenseeshouldreevaluatetheturbinebuildinggantrycraneforcompliancewiththegeneralguidelinesofNUREG-0612.EvaluationofthoseotherhandlingsystemscurrentlysubjecttocomplianceisconsistentwithNUREG-0612guidance.~ResenseTheturbinebuildinggantrycraneispreventedfromtraveloverthesteamtrestleareabyelectricalinterlocks.Theseinterlockscanbebypassedbywayofkey-lockswitches.However,thekeytotheseswitchesisadministrativelycontrolledunderAdministrativeProcedureAP0010123,AdministrativeControlofLocks,ValvesandSwitches.ThisproceduresrequiresthattheNuclearPlantSupervisororAssistantNuclearPlantSupervisordeterminetheworktobeperformedandevaluateitseffectonplantsafetyandoperationpriortoissueofthekey.2.2.2SafeLoadPathsLGuideline1,NUREG-'0612,"Section'5.1.11j"Safeloadpathsshouldbedefinedforthemovementofheavyloadstominimizethepotentialforheavyloads,ifdropped,toimpactirradiatedfuelinthereactorvesselandinthespentfuelpool,ortoimpactsafeshutdownequipment.Thepathshouldfollow,totheextentpractical,structuralfloormembers,beams,etc.,suchthatiftheloadisdropped,thestructureismorelikelytowithstandtheimpact.Theseloadpathsshouldbedefinedinprocedures,shownonequipmentlayoutdrawings,andclearlymarkedonthefloorintheareawheretheloadistobehandled.Deviationsfromdefinedloadpathsshouldrequirewrittenalternativeproceduresapprovedbytheplantsafetyreviewcommittee."446-1 oo;1.:~~(~~isvi~I~,>>et't'lgl'J~<<L"3~>>iIlI,N ReviewerConclusionandRecommendationsSt.LucieUnit1partiallycomplieswithGuideline1ofNUREG-0612.Inordertocomplyfully,theLicenseeshouldperformthefollowing:1.Developloadpathsformajorheavyloadshandledinsideofcontainment.2.Providevisualaidstoassistthecraneoperatorinidentifyingsafeloadpathsandexclusionareas.~ResenseFPLwillpreparespecificloadpathsformajorloadswhichroutinelytakethesamerouteorrouteswhencarried.Thesepathswillbereferencedintheapplicableprocedure,andwillbesimilartotheSt.LucieUnit2pathsprovidedwithourletterL-84-327datedNovember9,1984.ThesepathswillbepreparedbyFebruary15,1985.Inaddition,FPLusesanindividualtoleadtheheavyloadoverthepathwhenhandlingisrequired.2.1.3LoadHandlingProcedures[Guideline2,NUREG-0612,Section5.1.12"Proceduresshouldbedevelopedtocoverloadhandlingoperationsforheavyloadsthatareorcouldbehandledoverorinproximitytoirradiatedfuelorsafeshutdownequipment.Ataminimum,proceduresshouldcoverhandlingofthoseloadslistedinTable3-1ofNUREG-0612.Theseproceduresshouldinclude:identificationofrequiredequipment;inspectionsandacceptancecriteriarequiredbeforemovementofload;thestepsandpropersequencetobefollowedinhandlingtheload;definingthesafepath;andotherspecialprecautions."ReviewerConclusionLoadhandlingproceduresatSt.LucieUnit1satisfyGuideline2ofNUREG-0612.~ResnseNofurtheractionisrequired.2.1.4Crane0eratorTraininGuideline3,NUREG-0612,Section5.1.13"Craneoperatorsshouldbetrained,qualifiedandconductthemselvesinaccordancewithChapter2-3ofANSI830.2-1976'OverheadandGantryCranes'. | | SERVINGPEOPLE |
| tlh>>I'IP~E>>>>I4fI>>44CE>>44 ReviewConclusionandRecommendationsCraneoperationatSt.LucieUnit1partiallycomplieswithGuideline3.TheLicenseeshouldmakethefollowingmodificationstotheexistingtrainingprogramandcraneoperatingprocedures:1.Cranemotioncontrolsshouldbetestedpriortoinitialloadmovementsoneachshiftunlessuniqueconditionsatshiftchangeprohibitthetestingofcertaincontrols.2.Specificcriteriashouldbeestablishedfordeferringupperlimitswitchtestingandshouldincludeconsiderationofoperatorresponsetimenecessarytodeenergizethecraneintheeventofacontrolsystemmalfunction.~ResenseTheSt.LucieMaintenanceCraneOperationTrainingProgramdescribesthedailytestingthatshallbeperformedtocranesbeforeoperation.Thetestingrequirementsforthecranesincludethefollowing:Dailytestingshallbeperformedtocranesbeforeoperation.1.Allupperlimitswitchesshallbecheckedonhookstobeusedwithoutaloadonthehookatthebeginningofeachworkshift.Eachmotionshallbeinchedintoitslimitswitch,orruninatlowspeeds,unlessuniqueconditionatshiftchangeprohibitsthetesting(loadalreadyonhook).2.Bridgelimitswitchesshallbecheckedatthebeginningofeachworkshift.(Thisdoesnotincludeendstops).3.Trolleylimitswitchesshallbecheckedatthebeginningofeachworkshift.Switchoncantileversforgantrycraneson1and2neednotbetestedunlesscantileversaretobeused.4.Cranemotioncontrolsshallbetestedpriortoinitialloadmovementsoneachshiftunlessuniqueconditionsatshiftchangeprohibitthetestingofcertaincontrols(loadalreadyonhook). | | ~~ATTACHMENT Re:St.LucieUnit1DocketNo.50-335ControlofHeavyLoadsFPLresponses todraftTechnical Evaluation Reportitems.2.1GENERALGUIDELINES 2.1.1NUREG-0612, OverheadHeavyLoadHandlinSystemsReviewerConclusion andRecommendation TheLicenseeshouldreevaluate theturbinebuildinggantrycraneforcompliance withthegeneralguidelines ofNUREG-0612. |
| f>>"'I<~~kl~II>~'iklIIe"~a"Nyit"fH4 2.1.5SpecialLiftingDevicesLGuideline4,NUREG-0612,Section5.1.1"SpecialliftingdevicesshouldsatisfytheguidelinesofANSIN14.6-1978,'StandardforSpecialLiftingDevicesforShippingContainersWeighing10,000Pounds(4500kg)ort1oreforNuclearMaterials'.Thisstandardsshouldapplytoallspecialliftingdeviceswhichcarryheavyloadsinareasasdefinedabove.Foroperatingplantscertaininspectionsandloadtestsmaybeacceptedinlieuofcertainmaterialrequirementsinthestandard.Inaddition,thestressdesignfactorstatedinSection3.2.1.1ofANSIN14.6shouldbebasedonthecombinedmaximumstaticanddynamicloadsthatcouldbeimpartedonthehandlingdevicebasedoncharacteristicsofthecranewhichwillbeused.ThisislieuoftheguidelineinSection3.2.1.1ofANSIN14.6whichbasesthestressdesignfactorononlytheweight(staticload)oftheloadandoftheinterveningcomponentsofthespecialhandlingdevice."ReviewerConclusionCompliancewithGuideline4cannotbedeterminedfromtheinformationprovidedbythelicensee.~ResenseSeeEnclosurel.2.1.6LiftingDevicesNotSpeciallyDesignedtGuideline5,NUREG-0612,Section5.1.15"LiftingdevicesthatarenotspeciallydesignedshouldbeinstalledandusedinaccordancewiththeguidelinesofANSIB30.9-1971,'Slings'.However,inselectingthepropersling,theloadusedshouldbethesumofthestaticandmaximumdynamicload.Theratingidentifiedontheslingshouldbeintermsofthe'staticload'hichproducesthemaximumstaticanddynamicload.Wherethisrestrictsslingstouseononlycertaincranes,theslingsshouldbeclearlymarkedastothecraneswithwhichtheymaybeused."ReviewerConclusionSt.LucieUnit1complieswithGuideline5ofNUREG-0612.ResponseNofurtheractionrequired.446-1 eetlfl~te0lfI[eettlIten"Cgt 2.1.7CranesInspection,Testing,andtIaintenance)Guideline6,NUREG-0612,Section5.1.16"Thecraneshouldbeinspected,tested,andmaintainedinaccordancewithChaper2-2ofANSIB30.2-1976,'OverheadandGantryCranes,'iththeexceptionthattestsandinspectionsshouldbeperformedpriortousewhereitisnotpracticaltomeetthefrequenciesofANSIB30.2forperiodicinspectionandtest,orwherefrequencyofcraneuseislessthanthespecifiedinspectionandtestfrequency(e.g.,'hepolarcraneinsideaPWRcontainmentmayonlybeusedevery12to18monthsduringrefuelingoperations,andisgenerallynotaccessibleduringpoweroperation.ANSIB30.2,however,callsforcertaininspectionstobeperformeddailyormonthly.Forsuchcraneshavinglimitedusage,theinspections,test,andmaintenanceshouldbeperformedpriortotheiruse)."ReviewerConclusionSt.LucieUnit1complieswithGuideline6ofNUREG-0612.~ResonseNofurtheractionrequired.2.1.8CraneDesin[Guideline7,NUREG-0612,Section5.1.1(7)j"ThecraneshouldbedesignedtomeettheapplicablecriteriaandguidelinesofChapter2-1ofANSIB30.2-1976,'OverheadandGantryCranes,'ndofCNAA-70,'SpecificationsforElectricOverheadTravelingCranes'.AnalternativetoaspecificationinANSIB30.2orCMAA-70maybeacceptedinlieuofspecificcomplianceiftheintentofthespecificationissatisfied."ReviewerConclusionCompliancewithGuideline7cannotbedeterminedfromtheinformationprovidedbytheLicensee.Furtherinformationisrequiredtocompletetheindependentevaluationofcranedesign.~ResonseInformationtoaddressthereviewerconcernsforGuideline7wasprovidedinourlettersL-83-374datedJune28,1983,andL-83-463datedAugust26,1983. | | Evaluation ofthoseotherhandlingsystemscurrently subjecttocompliance isconsistent withNUREG-0612 guidance. |
| pO~4Ie(CO 2.2INTERIMPROTECTIONMEASURES2.2.1TechnicalSecifications[InterimProtectionMeasure1,NUREG0612,Section5.31"Licensesforalloperatingreactorsnothavingasingle-failure-proofoverheadcraneinthefuelstoragepoolareashouldberevisedtoincludeaspecificationcomparabletoStandardTechnicalSpecification3.9.7,'CraneTravel-SpentFuelStoragePoolBuilding,'orPWRsandStandardTechnicalSpecification3.9.6.2,'CraneTravel,'or'BWRs',toprohibithandlingofheavyloadsoverfuelinthestoragepooluntilimplementationofmeasureswhichsatisfytheguidelinesofSection5.1."ReviewerEvaluationandConclusionSt.LucieUnit1complieswithInterimProtectionMeasurel.~ResonseNofurtheractionrequired.2.2.2AdministrativeControls[InterimProtectionMeasures2,3,4,and5,NUREG-0612,Section5.32-5.35"Proceduraloradministrativemeasures[includingsafeloadpaths,loadhandlingprocedures,craneoperatortraining,andcraneinspectionj...canbeaccomplishedinashorttimeperiodandneednotbedelayedforcompletionofevaluationsandmodificationstosatisfytheguidelinesofSection5.1ofLNUREG-0612j."ReviewerEvaluations,Conclusions,andRecommendationsEvaluations,conclusions,andrecommendationsarecontainedindiscussionsoftherespectivegeneralguidelinesinSection2.1.2,2.1.3,2.1.4,and2.1.7.~ResonseSeeresponsestoapplicablesectionsabove.446-1 | | ~ResenseTheturbinebuildinggantrycraneisprevented fromtraveloverthesteamtrestleareabyelectrical interlocks. |
| ~'<I'I'.l:O0~cof%fItn 2.2.3SecialReviewforHeavLoadsHandledoverthe'CoreLInterimProtectioneasure,G-,ection.3."Specialattentionshouldbegiventoprocedures,equipment,andpersonnelforthehandlingofheavyloadsoverthecore,suchasvesselinternalsorvesselinspectiontools.Thisspecialreviewshouldincludethefollowingfortheseloads:(I)reviewofproceduresforinstallationofriggingorliftingdevicesandmovementoftheloadtoassurethatsufficientdetailisprovidedandthatinstructionsareclearandconcise;(2)visualinspectionsofloadbearingcorn'ponentsofcranes,slings,andspecialliftingdevicestoidentifyflawsordeficienciesthatchouldleadtofailureofthecomponent;(3)appropriaterepairandreplacementofdefectivecomponents;and(4)verifythatthecraneoperatorshavebeenproperlytrainedandarefamiliarwithspecificproceduresusedinhandlingtheseloads,e.g.,handsignals,conductofoperations,andcontentofprocedures."ReviewerEvaluationandConclusionSt.LucieUnit1complieswithInterimProtectionMeasure6.~ResenseNofurtheractionrequired. | | Theseinterlocks canbebypassedbywayofkey-lockswitches. |
| IIIk'<<o<<gg<<rV<<l'Ig<<(C".<<<<gk(Ib<<(g(IIk<<g<<II',$I<<Vr'(I'bg4V,V~4'.<<fgIr4g.''g~Igbgg'>>4<<i(I,I4,'<<I,fImsgrrr,vi)4>>vq~~C~~'(~'b(r'(Ik..g"v''(l<<tlJt'4C~l4>>(qk~,vk,'I<<v ENCLOSURE1Re:St.LucieUnit1DocketNo.50-335ControlofHeavyLoadsANSIN14.6providesguidelinesforspecialliftingdevicesforshippingcontainersweighing10,000poundsormorefornuclearmaterials.TheguidelinesinthisstandardwererecommendedforadoptionforthespecialliftingdevicesinNUREG-0612.St.LucieUnit1complieswiththisstandardexceptforthegeneralcaseslistedbelowandthedevicespecificcasesprovidedintheattachment.Wehavedeterminedthattheexceptionsnotedareacceptableanddonotaffectthecapabilityofthespecialliftingdevicestosafelyliftthedesignatedloads.Section5.1.3Verifyingbyscheduledperiodictestingthatthespecialliftingdevicecontinuestomeetitsperformancecriteriaandcontinuestobecapableofreliableandsafeperformanceofitsfunctions,andprovidingasystemthatindicatesthedateofexpirationofthevalidityofthetest.ResponseThistestingwillbeperformedinaccordancewithSection5.3.1(2).Section5.1.6Maintainingafullrecordofthehistoryofthespecialliftingdeviceorcomponent,includingdocumentationofrequiredtesting,allusesofthedevice,anyincidentsinwhichthedeviceoranyofitspartsmayhavebeenloadedbeyondtheloadsforwhichitwasqualified,damage,distortion,replacement,repair,alterations,andinspections.ResponseTherecordsofspecialliftingdeviceswillbemaintainedintheplantworkorderfiles.446-1 | | However,thekeytotheseswitchesisadministratively controlled underAdministrative Procedure AP0010123,Administrative ControlofLocks,ValvesandSwitches. |
| ~'UtIW.I0IUUUII,~eyIUeN,N' SUMMARYOFNONCOMPLIANCETONUREG-0612-GUIDELINEg4FORTHEST.LUCIEUNITNO.1REACTORVESSELCLOSUREHEADLIFTRIGWITHANSI-N14.6-1978SpecificsectionofANSI-N14.6-1978(SummaryofParagraphandNon-compliance)3.2.6Dropweightorcharpyimpacttesting.Therearenotestreportsavailableforvitalmembersidentifiedaspiecenumbers229-03and229-06,sincethematerialwastakenfromC-Estock.Response4.1.3MaterialacceptabilitycanbedemonstratedsincethesememberswerefabricatedfromCombustionEngineeringstockwhichwaspurchasedtoCESpecificationPIF3.Verifyselectionanduseofmaterial.Therearenomilltestreportsandmaterialcertificationsavailableforitems229-03and229-06.Response5.1.5.2~Resense5.2.1ResponseMaterialacceptabilitycanbedemonstratedsincethesememberswerefabricatedfromCombustionEngineeringstockwhichwaspurchasedtoCESpecificationPIF3.Suitablemarkings.Thereisnonameplateontheclosureheadliftrig.Nameplateswerenotprovidedforthespecialliftrigs.Nameplatesarenotconsiderednecessarysincethespecialliftrigsareonlyusedtoliftdesignatedloads.Loadtestto1505andappropriateinspectionpriortoinitialuse.Therigwasnotloadtestedbythevendor.Theclosureheadliftrigwasnot150$loadtestedasthiscouldresultinoverstressingincertainlocalareasoftheliftrig.446-1 tItl SUMMARYOFNONCOMPLIANCETONUREG-0612-GUIDELINE¹4FORTHEST.LUCIEUNITNO.1INTERNALSANDUGSLIFTRIGSWITHANSI-N14.6-1978SpecificsectionofANSI-N14.6-1978(SummaryofParagraphandNon-compliance)3.2.6DeadweightorcharpyimpacttestingInternalsandUGSrigsweredeadweighttestedto1.25timesoperations)load.Nootherimpacttestperformed.~ResonseRofurthertestingiswarranted.5.2.1Loadtestto150$andappropriateinspectionpriortoinitialuse.InternalsandUGSliftrigswereloadtestedto1.25timesoperational1oad.~ResonseRofurthertestingiswarranted.446-1 0V'4'lgQIJIINIIqtgoIIll'I''0n'VtIi}} | | Thisprocedures requiresthattheNuclearPlantSupervisor orAssistant NuclearPlantSupervisor determine theworktobeperformed andevaluateitseffectonplantsafetyandoperation priortoissueofthekey.2.2.2SafeLoadPathsLGuideline 1,NUREG-'0612," |
| | Section'5. |
| | 1.11j"Safeloadpathsshouldbedefinedforthemovementofheavyloadstominimizethepotential forheavyloads,ifdropped,toimpactirradiated fuelinthereactorvesselandinthespentfuelpool,ortoimpactsafeshutdownequipment. |
| | Thepathshouldfollow,totheextentpractical, structural floormembers,beams,etc.,suchthatiftheloadisdropped,thestructure ismorelikelytowithstand theimpact.Theseloadpathsshouldbedefinedinprocedures, shownonequipment layoutdrawings, andclearlymarkedonthefloorintheareawheretheloadistobehandled.Deviations fromdefinedloadpathsshouldrequirewrittenalternative procedures approvedbytheplantsafetyreviewcommittee." |
| | 446-1 oo;1.:~~(~~isvi~I~,>>et't'lgl'J~<<L"3~>>iIlI,N ReviewerConclusion andRecommendations St.LucieUnit1partially complieswithGuideline 1ofNUREG-0612.Inordertocomplyfully,theLicenseeshouldperformthefollowing: |
| | 1.Developloadpathsformajorheavyloadshandledinsideofcontainment. |
| | 2.Providevisualaidstoassistthecraneoperatorinidentifying safeloadpathsandexclusion areas.~ResenseFPLwillpreparespecificloadpathsformajorloadswhichroutinely takethesamerouteorrouteswhencarried.Thesepathswillbereferenced intheapplicable procedure, andwillbesimilartotheSt.LucieUnit2pathsprovidedwithourletterL-84-327datedNovember9,1984.ThesepathswillbepreparedbyFebruary15,1985.Inaddition, FPLusesanindividual toleadtheheavyloadoverthepathwhenhandlingisrequired. |
| | 2.1.3LoadHandlingProcedures |
| | [Guideline 2,NUREG-0612, Section5.1.12"Procedures shouldbedeveloped tocoverloadhandlingoperations forheavyloadsthatareorcouldbehandledoverorinproximity toirradiatedfuelorsafeshutdownequipment. |
| | Ataminimum,procedures shouldcoverhandlingofthoseloadslistedinTable3-1ofNUREG-0612. |
| | Theseprocedures shouldinclude:identification ofrequiredequipment;inspections andacceptance criteriarequiredbeforemovementofload;thestepsandpropersequencetobefollowedinhandlingtheload;definingthesafepath;andotherspecialprecautions." |
| | ReviewerConclusion Loadhandlingprocedures atSt.LucieUnit1satisfyGuideline 2ofNUREG-0612. |
| | ~ResnseNofurtheractionisrequired. |
| | 2.1.4Crane0eratorTraininGuideline 3,NUREG-0612, Section5.1.13"Craneoperators shouldbetrained,qualified andconductthemselves inaccordance withChapter2-3ofANSI830.2-1976 |
| | 'Overhead andGantryCranes'. |
| | tlh>>I'IP~E>>>>I4fI>>44CE>>44 ReviewConclusion andRecommendations Craneoperation atSt.LucieUnit1partially complieswithGuideline 3.TheLicenseeshouldmakethefollowing modifications totheexistingtrainingprogramandcraneoperating procedures: |
| | 1.Cranemotioncontrolsshouldbetestedpriortoinitialloadmovements oneachshiftunlessuniqueconditions atshiftchangeprohibitthetestingofcertaincontrols. |
| | 2.Specificcriteriashouldbeestablished fordeferring upperlimitswitchtestingandshouldincludeconsideration ofoperatorresponsetimenecessary todeenergize thecraneintheeventofacontrolsystemmalfunction. |
| | ~ResenseTheSt.LucieMaintenance CraneOperation TrainingProgramdescribes thedailytestingthatshallbeperformed tocranesbeforeoperation. |
| | Thetestingrequirements forthecranesincludethefollowing: |
| | Dailytestingshallbeperformed tocranesbeforeoperation. |
| | 1.Allupperlimitswitchesshallbecheckedonhookstobeusedwithoutaloadonthehookatthebeginning ofeachworkshift.Eachmotionshallbeinchedintoitslimitswitch,orruninatlowspeeds,unlessuniquecondition atshiftchangeprohibits thetesting(loadalreadyonhook).2.Bridgelimitswitchesshallbecheckedatthebeginning ofeachworkshift.(Thisdoesnotincludeendstops).3.Trolleylimitswitchesshallbecheckedatthebeginning ofeachworkshift.Switchoncantilevers forgantrycraneson1and2neednotbetestedunlesscantilevers aretobeused.4.Cranemotioncontrolsshallbetestedpriortoinitialloadmovements oneachshiftunlessuniqueconditions atshiftchangeprohibitthetestingofcertaincontrols(loadalreadyonhook). |
| | f>>"'I<~~kl~II>~'iklIIe"~a"Nyit"fH4 2.1.5SpecialLiftingDevicesLGuideline 4,NUREG-0612, Section5.1.1"Specialliftingdevicesshouldsatisfytheguidelines ofANSIN14.6-1978, |
| | 'Standard forSpecialLiftingDevicesforShippingContainers Weighing10,000Pounds(4500kg)ort1oreforNuclearMaterials'. |
| | Thisstandards shouldapplytoallspecialliftingdeviceswhichcarryheavyloadsinareasasdefinedabove.Foroperating plantscertaininspections andloadtestsmaybeacceptedinlieuofcertainmaterialrequirements inthestandard. |
| | Inaddition, thestressdesignfactorstatedinSection3.2.1.1ofANSIN14.6shouldbebasedonthecombinedmaximumstaticanddynamicloadsthatcouldbeimpartedonthehandlingdevicebasedoncharacteristics ofthecranewhichwillbeused.Thisislieuoftheguideline inSection3.2.1.1ofANSIN14.6whichbasesthestressdesignfactorononlytheweight(staticload)oftheloadandoftheintervening components ofthespecialhandlingdevice."ReviewerConclusion Compliance withGuideline 4cannotbedetermined fromtheinformation providedbythelicensee. |
| | ~ResenseSeeEnclosure l.2.1.6LiftingDevicesNotSpecially DesignedtGuideline 5,NUREG-0612, Section5.1.15"Liftingdevicesthatarenotspecially designedshouldbeinstalled andusedinaccordance withtheguidelines ofANSIB30.9-1971, |
| | 'Slings'. |
| | However,inselecting thepropersling,theloadusedshouldbethesumofthestaticandmaximumdynamicload.Theratingidentified ontheslingshouldbeintermsofthe'staticload'hich producesthemaximumstaticanddynamicload.Wherethisrestricts slingstouseononlycertaincranes,theslingsshouldbeclearlymarkedastothecraneswithwhichtheymaybeused."ReviewerConclusion St.LucieUnit1complieswithGuideline 5ofNUREG-0612. |
| | ResponseNofurtheractionrequired. |
| | 446-1 eetlfl~te0lfI[eettlIten"Cgt 2.1.7CranesInspection, Testing,andtIaintenance |
| | )Guideline 6,NUREG-0612,Section5.1.16"Thecraneshouldbeinspected, tested,andmaintained inaccordance withChaper2-2ofANSIB30.2-1976, |
| | 'Overhead andGantryCranes,'ith theexception thattestsandinspections shouldbeperformed priortousewhereitisnotpractical tomeetthefrequencies ofANSIB30.2forperiodicinspection andtest,orwherefrequency ofcraneuseislessthanthespecified inspection andtestfrequency (e.g.,'he polarcraneinsideaPWRcontainment mayonlybeusedevery12to18monthsduringrefueling operations, andisgenerally notaccessible duringpoweroperation. |
| | ANSIB30.2,however,callsforcertaininspections tobeperformed dailyormonthly.Forsuchcraneshavinglimitedusage,theinspections, test,andmaintenance shouldbeperformed priortotheiruse)."ReviewerConclusion St.LucieUnit1complieswithGuideline 6ofNUREG-0612. |
| | ~ResonseNofurtheractionrequired. |
| | 2.1.8CraneDesin[Guideline 7,NUREG-0612, Section5.1.1(7)j "Thecraneshouldbedesignedtomeettheapplicable criteriaandguidelines ofChapter2-1ofANSIB30.2-1976, |
| | 'Overhead andGantryCranes,'nd ofCNAA-70,'Specifications forElectricOverheadTraveling Cranes'.Analternative toaspecification inANSIB30.2orCMAA-70maybeacceptedinlieuofspecificcompliance iftheintentofthespecification issatisfied." |
| | ReviewerConclusion Compliance withGuideline 7cannotbedetermined fromtheinformation providedbytheLicensee. |
| | Furtherinformation isrequiredtocompletetheindependent evaluation ofcranedesign.~ResonseInformation toaddressthereviewerconcernsforGuideline 7wasprovidedinourlettersL-83-374datedJune28,1983,andL-83-463datedAugust26,1983. |
| | pO~4Ie(CO 2.2INTERIMPROTECTION MEASURES2.2.1Technical Secifications |
| | [InterimProtection Measure1,NUREG0612, Section5.31"Licenses foralloperating reactorsnothavingasingle-failure-proofoverheadcraneinthefuelstoragepoolareashouldberevisedtoincludeaspecification comparable toStandardTechnical Specification 3.9.7,'CraneTravel-SpentFuelStoragePoolBuilding, |
| | 'orPWRsandStandardTechnical Specification 3.9.6.2,'CraneTravel,'or |
| | 'BWRs',toprohibithandlingofheavyloadsoverfuelinthestoragepooluntilimplementation ofmeasureswhichsatisfytheguidelines ofSection5.1."ReviewerEvaluation andConclusion St.LucieUnit1complieswithInterimProtection Measurel.~ResonseNofurtheractionrequired. |
| | 2.2.2Administrative Controls[InterimProtection Measures2,3,4,and5,NUREG-0612, Section5.32-5.35"Procedural oradministrative measures[including safeloadpaths,loadhandlingprocedures, craneoperatortraining, andcraneinspectionj... |
| | canbeaccomplished inashorttimeperiodandneednotbedelayedforcompletion ofevaluations andmodifications tosatisfytheguidelines ofSection5.1ofLNUREG-0612j." |
| | ReviewerEvaluations, Conclusions, andRecommendations Evaluations, conclusions, andrecommendations arecontained indiscussions oftherespective generalguidelines inSection2.1.2,2.1.3,2.1.4,and2.1.7.~ResonseSeeresponses toapplicable sectionsabove.446-1 |
| | ~'<I'I'.l:O0~cof%fItn 2.2.3SecialReviewforHeavLoadsHandledoverthe'CoreLInterimProtection easure,G-,ection.3."Specialattention shouldbegiventoprocedures, equipment, andpersonnel forthehandlingofheavyloadsoverthecore,suchasvesselinternals orvesselinspection tools.Thisspecialreviewshouldincludethefollowing fortheseloads:(I)reviewofprocedures forinstallation ofriggingorliftingdevicesandmovementoftheloadtoassurethatsufficient detailisprovidedandthatinstructions areclearandconcise;(2)visualinspections ofloadbearingcorn'ponents ofcranes,slings,andspecialliftingdevicestoidentifyflawsordeficiencies thatchouldleadtofailureofthecomponent; (3)appropriate repairandreplacement ofdefective components; and(4)verifythatthecraneoperators havebeenproperlytrainedandarefamiliarwithspecificprocedures usedinhandlingtheseloads,e.g.,handsignals,conductofoperations, andcontentofprocedures." |
| | ReviewerEvaluation andConclusion St.LucieUnit1complieswithInterimProtection Measure6.~ResenseNofurtheractionrequired. |
| | IIIk'<<o<<gg<<rV<<l'Ig<<(C".<<<<gk(Ib<<(g(IIk<<g<<II',$I<<Vr'(I'bg4V,V~4'.<<fgIr4g.''g~Igbgg'>>4<<i(I,I4,'<<I,fImsgrrr,vi)4>>vq~~C~~'(~'b(r'(Ik..g"v''(l<<tlJt'4C~l4>>(qk~,vk,'I<<v ENCLOSURE 1Re:St.LucieUnit1DocketNo.50-335ControlofHeavyLoadsANSIN14.6providesguidelines forspecialliftingdevicesforshippingcontainers weighing10,000poundsormorefornuclearmaterials. |
| | Theguidelines inthisstandardwererecommended foradoptionforthespecialliftingdevicesinNUREG-0612. |
| | St.LucieUnit1complieswiththisstandardexceptforthegeneralcaseslistedbelowandthedevicespecificcasesprovidedintheattachment. |
| | Wehavedetermined thattheexceptions notedareacceptable anddonotaffectthecapability ofthespecialliftingdevicestosafelyliftthedesignated loads.Section5.1.3Verifying byscheduled periodictestingthatthespecialliftingdevicecontinues tomeetitsperformance criteriaandcontinues tobecapableofreliableandsafeperformance ofitsfunctions, andproviding asystemthatindicates thedateofexpiration ofthevalidityofthetest.ResponseThistestingwillbeperformed inaccordance withSection5.3.1(2). |
| | Section5.1.6Maintaining afullrecordofthehistoryofthespecialliftingdeviceorcomponent, including documentation ofrequiredtesting,allusesofthedevice,anyincidents inwhichthedeviceoranyofitspartsmayhavebeenloadedbeyondtheloadsforwhichitwasqualified, damage,distortion, replacement, repair,alterations, andinspections. |
| | ResponseTherecordsofspecialliftingdeviceswillbemaintained intheplantworkorderfiles.446-1 |
| | ~'UtIW.I0IUUUII,~eyIUeN,N' SUMMARYOFNONCOMPLIANCE TONUREG-0612 |
| | -GUIDELINE g4FORTHEST.LUCIEUNITNO.1REACTORVESSELCLOSUREHEADLIFTRIGWITHANSI-N14.6-1978 SpecificsectionofANSI-N14.6-1978 (SummaryofParagraph andNon-compliance) 3.2.6Dropweightorcharpyimpacttesting.Therearenotestreportsavailable forvitalmembersidentified aspiecenumbers229-03and229-06,sincethematerialwastakenfromC-Estock.Response4.1.3Materialacceptability canbedemonstrated sincethesememberswerefabricated fromCombustion Engineering stockwhichwaspurchased toCESpecification PIF3.Verifyselection anduseofmaterial. |
| | Therearenomilltestreportsandmaterialcertifications available foritems229-03and229-06.Response5.1.5.2~Resense5.2.1ResponseMaterialacceptability canbedemonstrated sincethesememberswerefabricated fromCombustion Engineering stockwhichwaspurchased toCESpecification PIF3.Suitablemarkings. |
| | Thereisnonameplate ontheclosureheadliftrig.Nameplates werenotprovidedforthespecialliftrigs.Nameplates arenotconsidered necessary sincethespecialliftrigsareonlyusedtoliftdesignated loads.Loadtestto1505andappropriate inspection priortoinitialuse.Therigwasnotloadtestedbythevendor.Theclosureheadliftrigwasnot150$loadtestedasthiscouldresultinoverstressing incertainlocalareasoftheliftrig.446-1 tItl SUMMARYOFNONCOMPLIANCE TONUREG-0612 |
| | -GUIDELINE |
| | ¹4FORTHEST.LUCIEUNITNO.1INTERNALS ANDUGSLIFTRIGSWITHANSI-N14. |
| | 6-1978SpecificsectionofANSI-N14.6-1978 (SummaryofParagraph andNon-compliance) 3.2.6DeadweightorcharpyimpacttestingInternals andUGSrigsweredeadweighttestedto1.25timesoperations) load.Nootherimpacttestperformed. |
| | ~ResonseRofurthertestingiswarranted. |
| | 5.2.1Loadtestto150$andappropriate inspection priortoinitialuse.Internals andUGSliftrigswereloadtestedto1.25timesoperational 1oad.~ResonseRofurthertestingiswarranted. |
| | 446-1 0V'4'lgQIJIINIIqtgoIIll'I''0n'VtIi}} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] Category:UTILITY TO NRC
MONTHYEARML17223A9401990-09-13013 September 1990 Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility ML17223A9341990-09-10010 September 1990 Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 81990-08-30030 August 1990 Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 ML17223A9201990-08-28028 August 1990 Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr ML17223A8911990-08-20020 August 1990 Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant1990-08-16016 August 1990 Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant ML17223A8751990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor IR 05000335/19900141990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing ML17223A8621990-07-25025 July 1990 Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831 ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17223A8631990-07-25025 July 1990 Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders1990-07-20020 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders ML17223A8581990-07-19019 July 1990 Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML17223A8491990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor ML17223A8521990-07-17017 July 1990 Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program IR 05000335/19900131990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17223A8421990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17223A8391990-07-0303 July 1990 Forwards Results of Beach Survey Procedure & Reduction of Field Survey Data,Per Tech Spec 4.7.6.1.1.Unit 1 Updated Fsar,Section 2.4.2.2,concluded That Dune Condition Acceptable Per Tech Spec 5.1.3 ML17223A8381990-07-0202 July 1990 Requests Termination of Operator License for s Lavelle.Util Also Requests That Ltr Be Withheld (Ref 10CFR2.790) L-90-239, Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)1990-07-0202 July 1990 Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) ML17223A8371990-06-27027 June 1990 Provides Details of Implementation Plan Re Recommendations & Schedular Requirements in Generic Ltr 89-10,per 891228 Ltr.Design Basis Review of safety-related motor-operated Valves & Determination of Switch Settings in Progress ML17308A4981990-06-27027 June 1990 Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions ML17223A8341990-06-19019 June 1990 Forwards Corrected Proposed Tech Spec Figure 3.4-2 Per 900207 Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Revised Low Temp Overpressure Protection Analysis Into Tech Specs ML17223A8241990-06-18018 June 1990 Forwards Revised Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1988. ML17223A8271990-06-18018 June 1990 Forwards Ma Smith 900601 Ltr to WR Cunningham of EPA Requesting Mod to Plant NPDES Permit to Permit Cleaning of Facility & to Establish Discharge Limits for Chemical Cleaning Wastes ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17223A6761990-05-31031 May 1990 Advises That Air Operated safety-related Components Will Perform All Design Basis Events,Per 881227 Ltr.All Actions Required by Generic Ltr 88-14 Complete for Plant ML17348A2651990-05-29029 May 1990 Submits Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per 10CFR26,App A.2.8(e)(4) ML17223A6741990-05-22022 May 1990 Forwards Info Re Status of 10CFR50.62 Mods to Meet ATWS Requirements as of 900515.Plant Change/Mod Package Necessary for Installing ATWS Will Be Issued by 900630.Hardware Procurement for Diverse Scram Sys Approx 90% Complete ML17223A6361990-05-0808 May 1990 Forwards Final Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. One Untraceable Circuit Breaker Installed in Unit 2 Qualified SPDS & Replaced W/Traceable Breaker ML17223A6281990-04-21021 April 1990 Forwards St Lucie Unit 2 Annual Environ Operating Rept, Vol 1 1989. ML17223A6081990-04-13013 April 1990 Responds to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Plant Supervisor Required to Remain in Control Room During Significant Changes in Power Operation & Preventive Maint Upgraded ML17223A6071990-04-0505 April 1990 Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Removal & Replacement of Cold Leg Side Plugs of Heat Number 3513 for Unit 1 Completed During Refueling Outage ML17308A4911990-04-0202 April 1990 Forwards Description & Summary of Safety Evaluations of Plant Changes/Mods Reportable Per 10CFR50.59.Repair &/Or Replacement of Protective Coatings on Surfaces Inside Bldg Pose No Unreviewed Safety Question ML17223A5931990-03-30030 March 1990 Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress ML17223A5921990-03-27027 March 1990 Forwards Addl Info on Proposed License Amend Re Increased Max Allowable Resistance Temp Detector Delay Time,Per 891219 Telcon & Advises That Util Request to Increase Plant Resistance Temp Detector Response Time Remain Unchanged ML17223A5831990-03-19019 March 1990 Forwards Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implications of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f) ML17347B6191990-03-13013 March 1990 Provides Listing of Property Insurance Programs ML17223A5531990-03-0909 March 1990 Submits Results of Investigation of Error Detected in Dose Assessment During 900124 NRC Evaluated Exercise at Plant. Operator Error Caused Keyboard Hangup Requiring Computer Restart ML17223A5451990-03-0808 March 1990 Forwards Revised Tech Specs Re Steam Generator Tube Repairs, Per 890602 Telcon & Subsequent Discussions W/Nrc ML17308A4871990-03-0707 March 1990 Forwards Response to Eight Audit Questions & Licensing Bases Criteria to Resolve Station Blackout Issue.Util Currently Has Procedures to Mitigate Effects of Hurricanes & Tornados Which Meet or Exceed NUMARC 87-00 Guidelines ML17347B5881990-03-0101 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits ML17347B6031990-02-27027 February 1990 Requests Approval to Use Code Case N-468 at Plants ML17223A5321990-02-26026 February 1990 Forwards CEN-396 (L)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2. ML20012A0011990-02-26026 February 1990 Notifies That Followup Actions Completed on Schedule & Incorporated Into Rev 25 to Plant Physical Security Plan,Per NRC 890605 Request ML17223A5411990-02-26026 February 1990 Provides Addl Info Re Proposed License Amends Re Moderator Temp Coefficient Surveillance Requirements,Per 891026 & 900109 Telcons IR 05000335/19890241990-02-22022 February 1990 Responds to Violations Noted in Insp Repts 50-335/89-24 & 50-389/89-24.Corrective Actions:Applicable Procedures Changed to Clarify Which Spaces & Blocks Required to Be Completed on Plant Work Order & QC Supervisor Counseled 1990-09-13
[Table view] |
Text
~i,REGULATORY NFORMATION DISTRIBUTION SEM(RIDS)ACCESSION NBR:8501150082.
DOCDATE:85/Oi/10NOTARIZED:,
NOFACIL:50-335 St,LucioPlantiUnitiiFloridaPower8LightCo.AUTH',NAME
'UTHORAFFILIATION NILLIAMSE JON,FloridaPowerLLightCo.RECIP~NAMERECIPIENT AFFILIATION MILLER'~RsOperating ReactorsBranch3DOCKET05000335
SUBJECT:
Forwardsaddiinforesafeloadpathsitestipg ofcranecontrols8speciallifting,devicesin'esponse toNRC830524reviewofutilresponsetoNUREG-0612'Control ofHeavyLoadsatNuclearPowerPlants."DISTRISUTION CODE:A033DCOPIESRECEIVED:LTR
)ENCLgSIZE:"JJ.TITLE:ORSubmittal:
USIA"36ControlofHeavyLoadNearSpentFuel"NUREG 06NOTES:OLs02'/01/76 05000335RECIPIENT IDCODE/NAME NRR'RB3BCINTERNAL'CRS 13NRRNEIGHBORS09NRR/DL/TAPMG NRR/DSI/ASB RGN2COPIESLTTRENCL776611111111RECIPIENT IDCODE/NAME NRRSINGHAMA01ADM/LFMBNRR/DL/DRAB 12NEFILE00COPIESLTTRENCLEXTERNAL; LPDRNSIC030611NRCPDR0211TOTALNUMBEROFCOPIESREQUIRED:
LTTR28ENCL27 I,>>rrhfffhIl'hH~~~~1w4~h4~hIWilWr>>rIhtpi>>wllw$4>>fff4Ft11f1I1IWWl(r44WIhFI>>FIfrhIIXV4~Fl yAhzFLORIDAPOWER&LIGHTCOMPANYJanuaryl0,l985L-85-17OfficeofNuclearReactorRegulation Attention:
Mr.JamesR.Miller,ChiefOperating ReactorsBranchIII3DivisionofLicensing U.S.NuclearRegulatory Commission Washington, D.C.20555
DearMr.fliller:
Re:St.LucieUnit1DocketNo.50-335ControlofHeavyLoadsAdrafttechnical evaluation reportwasprovidedwiththeNRCletterdatedMay24,1983.ThisreportprovidedtheresultsoftheNRCcontractor's reviewofFloridaPower8Light'sresponsetoNUREG-0612, "ControlofHeavyLoadsatNuclearPowerPlants"forSt.LucieUnit1.Additional information concerning safeloadpaths, testingofcranecontrolsandspecialliftingdevicesisprovidedintheattachment tothisletter.Shouldyouoryourstaffhaveanyquestions onthisinformation, pleasecontactus.Verytrulyyours,J.W.Williams, Jr.GroupVicePresident NuclearEnergyJWW/PLP/js Attachment cc:J.P.O'Reilly, RegionIIHaroldF.Reis,EsquirePNS-LI-85-016-1 I~P>iSOOBDRAD0O~BSOlgppPQPPPB~~PDRPEOPLE...
SERVINGPEOPLE
~~ATTACHMENT Re:St.LucieUnit1DocketNo.50-335ControlofHeavyLoadsFPLresponses todraftTechnical Evaluation Reportitems.2.1GENERALGUIDELINES 2.1.1NUREG-0612, OverheadHeavyLoadHandlinSystemsReviewerConclusion andRecommendation TheLicenseeshouldreevaluate theturbinebuildinggantrycraneforcompliance withthegeneralguidelines ofNUREG-0612.
Evaluation ofthoseotherhandlingsystemscurrently subjecttocompliance isconsistent withNUREG-0612 guidance.
~ResenseTheturbinebuildinggantrycraneisprevented fromtraveloverthesteamtrestleareabyelectrical interlocks.
Theseinterlocks canbebypassedbywayofkey-lockswitches.
However,thekeytotheseswitchesisadministratively controlled underAdministrative Procedure AP0010123,Administrative ControlofLocks,ValvesandSwitches.
Thisprocedures requiresthattheNuclearPlantSupervisor orAssistant NuclearPlantSupervisor determine theworktobeperformed andevaluateitseffectonplantsafetyandoperation priortoissueofthekey.2.2.2SafeLoadPathsLGuideline 1,NUREG-'0612,"
Section'5.
1.11j"Safeloadpathsshouldbedefinedforthemovementofheavyloadstominimizethepotential forheavyloads,ifdropped,toimpactirradiated fuelinthereactorvesselandinthespentfuelpool,ortoimpactsafeshutdownequipment.
Thepathshouldfollow,totheextentpractical, structural floormembers,beams,etc.,suchthatiftheloadisdropped,thestructure ismorelikelytowithstand theimpact.Theseloadpathsshouldbedefinedinprocedures, shownonequipment layoutdrawings, andclearlymarkedonthefloorintheareawheretheloadistobehandled.Deviations fromdefinedloadpathsshouldrequirewrittenalternative procedures approvedbytheplantsafetyreviewcommittee."
446-1 oo;1.:~~(~~isvi~I~,>>et't'lgl'J~<<L"3~>>iIlI,N ReviewerConclusion andRecommendations St.LucieUnit1partially complieswithGuideline 1ofNUREG-0612.Inordertocomplyfully,theLicenseeshouldperformthefollowing:
1.Developloadpathsformajorheavyloadshandledinsideofcontainment.
2.Providevisualaidstoassistthecraneoperatorinidentifying safeloadpathsandexclusion areas.~ResenseFPLwillpreparespecificloadpathsformajorloadswhichroutinely takethesamerouteorrouteswhencarried.Thesepathswillbereferenced intheapplicable procedure, andwillbesimilartotheSt.LucieUnit2pathsprovidedwithourletterL-84-327datedNovember9,1984.ThesepathswillbepreparedbyFebruary15,1985.Inaddition, FPLusesanindividual toleadtheheavyloadoverthepathwhenhandlingisrequired.
2.1.3LoadHandlingProcedures
[Guideline 2,NUREG-0612, Section5.1.12"Procedures shouldbedeveloped tocoverloadhandlingoperations forheavyloadsthatareorcouldbehandledoverorinproximity toirradiatedfuelorsafeshutdownequipment.
Ataminimum,procedures shouldcoverhandlingofthoseloadslistedinTable3-1ofNUREG-0612.
Theseprocedures shouldinclude:identification ofrequiredequipment;inspections andacceptance criteriarequiredbeforemovementofload;thestepsandpropersequencetobefollowedinhandlingtheload;definingthesafepath;andotherspecialprecautions."
ReviewerConclusion Loadhandlingprocedures atSt.LucieUnit1satisfyGuideline 2ofNUREG-0612.
~ResnseNofurtheractionisrequired.
2.1.4Crane0eratorTraininGuideline 3,NUREG-0612, Section5.1.13"Craneoperators shouldbetrained,qualified andconductthemselves inaccordance withChapter2-3ofANSI830.2-1976
'Overhead andGantryCranes'.
tlh>>I'IP~E>>>>I4fI>>44CE>>44 ReviewConclusion andRecommendations Craneoperation atSt.LucieUnit1partially complieswithGuideline 3.TheLicenseeshouldmakethefollowing modifications totheexistingtrainingprogramandcraneoperating procedures:
1.Cranemotioncontrolsshouldbetestedpriortoinitialloadmovements oneachshiftunlessuniqueconditions atshiftchangeprohibitthetestingofcertaincontrols.
2.Specificcriteriashouldbeestablished fordeferring upperlimitswitchtestingandshouldincludeconsideration ofoperatorresponsetimenecessary todeenergize thecraneintheeventofacontrolsystemmalfunction.
~ResenseTheSt.LucieMaintenance CraneOperation TrainingProgramdescribes thedailytestingthatshallbeperformed tocranesbeforeoperation.
Thetestingrequirements forthecranesincludethefollowing:
Dailytestingshallbeperformed tocranesbeforeoperation.
1.Allupperlimitswitchesshallbecheckedonhookstobeusedwithoutaloadonthehookatthebeginning ofeachworkshift.Eachmotionshallbeinchedintoitslimitswitch,orruninatlowspeeds,unlessuniquecondition atshiftchangeprohibits thetesting(loadalreadyonhook).2.Bridgelimitswitchesshallbecheckedatthebeginning ofeachworkshift.(Thisdoesnotincludeendstops).3.Trolleylimitswitchesshallbecheckedatthebeginning ofeachworkshift.Switchoncantilevers forgantrycraneson1and2neednotbetestedunlesscantilevers aretobeused.4.Cranemotioncontrolsshallbetestedpriortoinitialloadmovements oneachshiftunlessuniqueconditions atshiftchangeprohibitthetestingofcertaincontrols(loadalreadyonhook).
f>>"'I<~~kl~II>~'iklIIe"~a"Nyit"fH4 2.1.5SpecialLiftingDevicesLGuideline 4,NUREG-0612, Section5.1.1"Specialliftingdevicesshouldsatisfytheguidelines ofANSIN14.6-1978,
'Standard forSpecialLiftingDevicesforShippingContainers Weighing10,000Pounds(4500kg)ort1oreforNuclearMaterials'.
Thisstandards shouldapplytoallspecialliftingdeviceswhichcarryheavyloadsinareasasdefinedabove.Foroperating plantscertaininspections andloadtestsmaybeacceptedinlieuofcertainmaterialrequirements inthestandard.
Inaddition, thestressdesignfactorstatedinSection3.2.1.1ofANSIN14.6shouldbebasedonthecombinedmaximumstaticanddynamicloadsthatcouldbeimpartedonthehandlingdevicebasedoncharacteristics ofthecranewhichwillbeused.Thisislieuoftheguideline inSection3.2.1.1ofANSIN14.6whichbasesthestressdesignfactorononlytheweight(staticload)oftheloadandoftheintervening components ofthespecialhandlingdevice."ReviewerConclusion Compliance withGuideline 4cannotbedetermined fromtheinformation providedbythelicensee.
~ResenseSeeEnclosure l.2.1.6LiftingDevicesNotSpecially DesignedtGuideline 5,NUREG-0612, Section5.1.15"Liftingdevicesthatarenotspecially designedshouldbeinstalled andusedinaccordance withtheguidelines ofANSIB30.9-1971,
'Slings'.
However,inselecting thepropersling,theloadusedshouldbethesumofthestaticandmaximumdynamicload.Theratingidentified ontheslingshouldbeintermsofthe'staticload'hich producesthemaximumstaticanddynamicload.Wherethisrestricts slingstouseononlycertaincranes,theslingsshouldbeclearlymarkedastothecraneswithwhichtheymaybeused."ReviewerConclusion St.LucieUnit1complieswithGuideline 5ofNUREG-0612.
ResponseNofurtheractionrequired.
446-1 eetlfl~te0lfI[eettlIten"Cgt 2.1.7CranesInspection, Testing,andtIaintenance
)Guideline 6,NUREG-0612,Section5.1.16"Thecraneshouldbeinspected, tested,andmaintained inaccordance withChaper2-2ofANSIB30.2-1976,
'Overhead andGantryCranes,'ith theexception thattestsandinspections shouldbeperformed priortousewhereitisnotpractical tomeetthefrequencies ofANSIB30.2forperiodicinspection andtest,orwherefrequency ofcraneuseislessthanthespecified inspection andtestfrequency (e.g.,'he polarcraneinsideaPWRcontainment mayonlybeusedevery12to18monthsduringrefueling operations, andisgenerally notaccessible duringpoweroperation.
ANSIB30.2,however,callsforcertaininspections tobeperformed dailyormonthly.Forsuchcraneshavinglimitedusage,theinspections, test,andmaintenance shouldbeperformed priortotheiruse)."ReviewerConclusion St.LucieUnit1complieswithGuideline 6ofNUREG-0612.
~ResonseNofurtheractionrequired.
2.1.8CraneDesin[Guideline 7,NUREG-0612, Section5.1.1(7)j "Thecraneshouldbedesignedtomeettheapplicable criteriaandguidelines ofChapter2-1ofANSIB30.2-1976,
'Overhead andGantryCranes,'nd ofCNAA-70,'Specifications forElectricOverheadTraveling Cranes'.Analternative toaspecification inANSIB30.2orCMAA-70maybeacceptedinlieuofspecificcompliance iftheintentofthespecification issatisfied."
ReviewerConclusion Compliance withGuideline 7cannotbedetermined fromtheinformation providedbytheLicensee.
Furtherinformation isrequiredtocompletetheindependent evaluation ofcranedesign.~ResonseInformation toaddressthereviewerconcernsforGuideline 7wasprovidedinourlettersL-83-374datedJune28,1983,andL-83-463datedAugust26,1983.
pO~4Ie(CO 2.2INTERIMPROTECTION MEASURES2.2.1Technical Secifications
[InterimProtection Measure1,NUREG0612, Section5.31"Licenses foralloperating reactorsnothavingasingle-failure-proofoverheadcraneinthefuelstoragepoolareashouldberevisedtoincludeaspecification comparable toStandardTechnical Specification 3.9.7,'CraneTravel-SpentFuelStoragePoolBuilding,
'orPWRsandStandardTechnical Specification 3.9.6.2,'CraneTravel,'or
'BWRs',toprohibithandlingofheavyloadsoverfuelinthestoragepooluntilimplementation ofmeasureswhichsatisfytheguidelines ofSection5.1."ReviewerEvaluation andConclusion St.LucieUnit1complieswithInterimProtection Measurel.~ResonseNofurtheractionrequired.
2.2.2Administrative Controls[InterimProtection Measures2,3,4,and5,NUREG-0612, Section5.32-5.35"Procedural oradministrative measures[including safeloadpaths,loadhandlingprocedures, craneoperatortraining, andcraneinspectionj...
canbeaccomplished inashorttimeperiodandneednotbedelayedforcompletion ofevaluations andmodifications tosatisfytheguidelines ofSection5.1ofLNUREG-0612j."
ReviewerEvaluations, Conclusions, andRecommendations Evaluations, conclusions, andrecommendations arecontained indiscussions oftherespective generalguidelines inSection2.1.2,2.1.3,2.1.4,and2.1.7.~ResonseSeeresponses toapplicable sectionsabove.446-1
~'<I'I'.l:O0~cof%fItn 2.2.3SecialReviewforHeavLoadsHandledoverthe'CoreLInterimProtection easure,G-,ection.3."Specialattention shouldbegiventoprocedures, equipment, andpersonnel forthehandlingofheavyloadsoverthecore,suchasvesselinternals orvesselinspection tools.Thisspecialreviewshouldincludethefollowing fortheseloads:(I)reviewofprocedures forinstallation ofriggingorliftingdevicesandmovementoftheloadtoassurethatsufficient detailisprovidedandthatinstructions areclearandconcise;(2)visualinspections ofloadbearingcorn'ponents ofcranes,slings,andspecialliftingdevicestoidentifyflawsordeficiencies thatchouldleadtofailureofthecomponent; (3)appropriate repairandreplacement ofdefective components; and(4)verifythatthecraneoperators havebeenproperlytrainedandarefamiliarwithspecificprocedures usedinhandlingtheseloads,e.g.,handsignals,conductofoperations, andcontentofprocedures."
ReviewerEvaluation andConclusion St.LucieUnit1complieswithInterimProtection Measure6.~ResenseNofurtheractionrequired.
IIIk'<<o<<gg<<rV<<l'Ig<<(C".<<<<gk(Ib<<(g(IIk<<g<<II',$I<<Vr'(I'bg4V,V~4'.<<fgIr4g.g~Igbgg'>>4<<i(I,I4,'<<I,fImsgrrr,vi)4>>vq~~C~~'(~'b(r'(Ik..g"v(l<<tlJt'4C~l4>>(qk~,vk,'I<<v ENCLOSURE 1Re:St.LucieUnit1DocketNo.50-335ControlofHeavyLoadsANSIN14.6providesguidelines forspecialliftingdevicesforshippingcontainers weighing10,000poundsormorefornuclearmaterials.
Theguidelines inthisstandardwererecommended foradoptionforthespecialliftingdevicesinNUREG-0612.
St.LucieUnit1complieswiththisstandardexceptforthegeneralcaseslistedbelowandthedevicespecificcasesprovidedintheattachment.
Wehavedetermined thattheexceptions notedareacceptable anddonotaffectthecapability ofthespecialliftingdevicestosafelyliftthedesignated loads.Section5.1.3Verifying byscheduled periodictestingthatthespecialliftingdevicecontinues tomeetitsperformance criteriaandcontinues tobecapableofreliableandsafeperformance ofitsfunctions, andproviding asystemthatindicates thedateofexpiration ofthevalidityofthetest.ResponseThistestingwillbeperformed inaccordance withSection5.3.1(2).
Section5.1.6Maintaining afullrecordofthehistoryofthespecialliftingdeviceorcomponent, including documentation ofrequiredtesting,allusesofthedevice,anyincidents inwhichthedeviceoranyofitspartsmayhavebeenloadedbeyondtheloadsforwhichitwasqualified, damage,distortion, replacement, repair,alterations, andinspections.
ResponseTherecordsofspecialliftingdeviceswillbemaintained intheplantworkorderfiles.446-1
~'UtIW.I0IUUUII,~eyIUeN,N' SUMMARYOFNONCOMPLIANCE TONUREG-0612
-GUIDELINE g4FORTHEST.LUCIEUNITNO.1REACTORVESSELCLOSUREHEADLIFTRIGWITHANSI-N14.6-1978 SpecificsectionofANSI-N14.6-1978 (SummaryofParagraph andNon-compliance) 3.2.6Dropweightorcharpyimpacttesting.Therearenotestreportsavailable forvitalmembersidentified aspiecenumbers229-03and229-06,sincethematerialwastakenfromC-Estock.Response4.1.3Materialacceptability canbedemonstrated sincethesememberswerefabricated fromCombustion Engineering stockwhichwaspurchased toCESpecification PIF3.Verifyselection anduseofmaterial.
Therearenomilltestreportsandmaterialcertifications available foritems229-03and229-06.Response5.1.5.2~Resense5.2.1ResponseMaterialacceptability canbedemonstrated sincethesememberswerefabricated fromCombustion Engineering stockwhichwaspurchased toCESpecification PIF3.Suitablemarkings.
Thereisnonameplate ontheclosureheadliftrig.Nameplates werenotprovidedforthespecialliftrigs.Nameplates arenotconsidered necessary sincethespecialliftrigsareonlyusedtoliftdesignated loads.Loadtestto1505andappropriate inspection priortoinitialuse.Therigwasnotloadtestedbythevendor.Theclosureheadliftrigwasnot150$loadtestedasthiscouldresultinoverstressing incertainlocalareasoftheliftrig.446-1 tItl SUMMARYOFNONCOMPLIANCE TONUREG-0612
-GUIDELINE
¹4FORTHEST.LUCIEUNITNO.1INTERNALS ANDUGSLIFTRIGSWITHANSI-N14.
6-1978SpecificsectionofANSI-N14.6-1978 (SummaryofParagraph andNon-compliance) 3.2.6DeadweightorcharpyimpacttestingInternals andUGSrigsweredeadweighttestedto1.25timesoperations) load.Nootherimpacttestperformed.
~ResonseRofurthertestingiswarranted.
5.2.1Loadtestto150$andappropriate inspection priortoinitialuse.Internals andUGSliftrigswereloadtestedto1.25timesoperational 1oad.~ResonseRofurthertestingiswarranted.
446-1 0V'4'lgQIJIINIIqtgoIIll'I0n'VtIi