{{#Wiki_filter:NextEra Approach to Resolution ofTornado Missile ProtectionPoint Beach Nuclear Plant Units 1 & 2May 1, 2018 2AGENDA*Introductions*Current Status*Compensatory Measures*Resolution Strategy*Conclusion 3INTRODUCTIONS*NRC*NextEra Point Beach Team-Steve Catron, Fleet Licensing Manager-Anil Julka, Reliability & Risk Manager
{{#Wiki_filter:NextEra Approach to Resolution of Tornado Missile Protection Point Beach Nuclear Plant Units 1 & 2 May 1, 2018 2AGENDA*Introductions
*Current Status
*Compensatory Measures
*Resolution Strategy
*Conclusion 3INTRODUCTIONS
*NRC*NextEra Point Beach Team-Steve Catron, Fleet Licensing Manager-Anil Julka, Reliability & Risk Manager
-Eric Schultz, PB Licensing Manager
-Eric Schultz, PB Licensing Manager
-Lori Christensen, PB Licensing Project Manager*3 4CURRENT STATUS*Background*Initial Nonconformance Declaration (U1 & U2)-Turbine Driven Auxiliary Feedwater Pumps (TDAFPs) for unprotected steam supply piping*Extent of Condition (U1 & U2)-TDAFPs for unprotected turbine exhaust stacks-Main Steam Isolation Valves, Main Steam Safety Valves, Atmospheric Dump Valves-Emergency Diesel Generator (EDG) Fuel Oil Storage Tank T-175B*4Station implemented enforcement discretion guidance documentsEGM 15-002 and DSS-ISG-2016-01 5COMPENSATORY MEASURES*Immediate Compensatory Measures-Per DSS-ISG-2016-01 guidance*Comprehensive Compensatory Measures-Procedurally controlled measures-FLEX equipment sharing*Other Discernable Changes from Original Station Design-FLEX implementation-Station modifications (design basis and beyond design basis)*5Compensatory measures in place; original station design improved over time and enhanced ability to mitigate a tornado missile event 6RESOLUTION STRATEGY*The resolution strategy is to validate that Tornado Missile is not a significant hazard for the site-LAR submittal and approval will clear nonconformances*Options Considered for LAR Development-TMRE (Point Beach was a pilot plant)-Site-specific High Winds PRA (RG 1.200, Rev. 2)*Selected Option -Site-specific High Winds PRA (RG 1.200, Rev. 2)*6License Amendment Request will screen out tornado missile as a significant hazard for the site 7RESOLUTION STRATEGY*Site-specific High Winds PRA-Industry leader-Developed in 2013Updated to reflect as-built/as-operated plant*7Site-specific High Winds PRA is peer-reviewed to ASME Standard and Regulatory Guide 1.200, Revision 2 8CONCLUSION*Entered Enforcement Discretion Process per EGM 2015-002*License Amendment Request submittal based on Site-Specific High Winds PRA-Site PRA concludes Tornado Missile is below the regulatory threshold in the Standard Review Plan and screens out as a significant hazard*Plan to submit LAR in second half of 2018*8License Amendment Request will screen out tornado missile as a significant hazard for the site}}
-Lori Christensen, PB Licensing Project Manager
*3 4CURRENT STATUS
*Background
*Initial Nonconformance Declaration (U1 & U2)-Turbine Driven Auxiliary Feedwater Pumps (TDAFPs) for unprotected steam supply piping
*Extent of Condition (U1 & U2)-TDAFPs for unprotected turbine exhaust stacks-Main Steam Isolation Valves, Main Steam Safety Valves, Atmospheric Dump Valves-Emergency Diesel Generator (EDG) Fuel Oil Storage Tank T-175B*4Station implemented enforcement discretion guidance documentsEGM 15-002 and DSS-ISG-2016-01 5COMPENSATORY MEASURES
*Immediate Compensatory Measures-Per DSS-ISG-2016-01 guidance
*Comprehensive Compensatory Measures-Procedurally controlled measures-FLEX equipment sharing
*Other Discernable Changes from Original Station Design-FLEX implementation-Station modifications (design basis and beyond design basis)
*5Compensatory measures in place; original station design improved over time and enhanced ability to mitigate a tornado missile event 6RESOLUTION STRATEGY
*The resolution strategy is to validate that Tornado Missile is not a significant hazard for the site-LAR submittal and approval will clear nonconformances
*Options Considered for LAR Development-TMRE (Point Beach was a pilot plant)-Site-specific High Winds PRA (RG 1.200, Rev. 2)
*Selected Option -Site-specific High Winds PRA (RG 1.200, Rev. 2)
*6License Amendment Request will screen out tornado missile as a significant hazard for the site 7RESOLUTION STRATEGY
*Site-specific High Winds PRA-Industry leader-Developed in 2013Updated to reflect as-built/as-operated plant
*7Site-specific High Winds PRA is peer-reviewed to ASME Standard and Regulatory Guide 1.200, Revision 2 8CONCLUSION
*Entered Enforcement Discretion Process per EGM 2015-002
*License Amendment Request submittal based on Site-Specific High Winds PRA-Site PRA concludes Tornado Missile is below the regulatory threshold in the Standard Review Plan and screens out as a significant hazard
*Plan to submit LAR in second half of 2018
*8License Amendment Request will screen out tornado missile as a significant hazard for the site}}

Revision as of 23:38, 28 June 2018

Point Beach Nuclear Plant, Units 1 and 2 - NextEra Approach to Resolution of Tornado Missile Protection May 1, 2018
ML18108A015
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/01/2018
From:
Point Beach
To:
Division of Operating Reactor Licensing
Chawla M L, NRR/DORL/LPLIII, 415-8371
References
Download: ML18108A015 (8)


Text

NextEra Approach to Resolution of Tornado Missile Protection Point Beach Nuclear Plant Units 1 & 2 May 1, 2018 2AGENDA*Introductions

  • Current Status
  • Compensatory Measures
  • Resolution Strategy
  • Conclusion 3INTRODUCTIONS
  • NRC*NextEra Point Beach Team-Steve Catron, Fleet Licensing Manager-Anil Julka, Reliability & Risk Manager

-Eric Schultz, PB Licensing Manager

-Lori Christensen, PB Licensing Project Manager

  • 3 4CURRENT STATUS
  • Background
  • Initial Nonconformance Declaration (U1 & U2)-Turbine Driven Auxiliary Feedwater Pumps (TDAFPs) for unprotected steam supply piping
  • Comprehensive Compensatory Measures-Procedurally controlled measures-FLEX equipment sharing
  • Other Discernable Changes from Original Station Design-FLEX implementation-Station modifications (design basis and beyond design basis)
  • 5Compensatory measures in place; original station design improved over time and enhanced ability to mitigate a tornado missile event 6RESOLUTION STRATEGY
  • The resolution strategy is to validate that Tornado Missile is not a significant hazard for the site-LAR submittal and approval will clear nonconformances
  • Options Considered for LAR Development-TMRE (Point Beach was a pilot plant)-Site-specific High Winds PRA (RG 1.200, Rev. 2)
  • 6License Amendment Request will screen out tornado missile as a significant hazard for the site 7RESOLUTION STRATEGY
  • Site-specific High Winds PRA-Industry leader-Developed in 2013Updated to reflect as-built/as-operated plant
  • License Amendment Request submittal based on Site-Specific High Winds PRA-Site PRA concludes Tornado Missile is below the regulatory threshold in the Standard Review Plan and screens out as a significant hazard
  • Plan to submit LAR in second half of 2018
  • 8License Amendment Request will screen out tornado missile as a significant hazard for the site