{{#Wiki_filter:NextEra Approach to Resolution ofTornado Missile ProtectionPoint Beach Nuclear Plant Units 1 & 2May 1, 2018 2AGENDA*Introductions*Current Status*Compensatory Measures*Resolution Strategy*Conclusion 3INTRODUCTIONS*NRC*NextEra Point Beach Team-Steve Catron, Fleet Licensing Manager-Anil Julka, Reliability & Risk Manager | {{#Wiki_filter:NextEra Approach to Resolution ofTornado Missile ProtectionPoint Beach Nuclear Plant Units 1 & 2May 1, 2018 2AGENDA*Introductions*Current Status*Compensatory Measures*Resolution Strategy*Conclusion 3INTRODUCTIONS*NRC*NextEra Point Beach Team-Steve Catron, Fleet Licensing Manager-Anil Julka, Reliability & Risk Manager | ||
-Eric Schultz, PB Licensing Manager | -Eric Schultz, PB Licensing Manager | ||
-Lori Christensen, PB Licensing Project Manager*3 4CURRENT STATUS*Background*Initial Nonconformance Declaration (U1 & U2)-Turbine Driven Auxiliary Feedwater Pumps (TDAFPs) for unprotected steam supply piping*Extent of Condition (U1 & U2)-TDAFPs for unprotected turbine exhaust stacks-Main Steam Isolation Valves, Main Steam Safety Valves, Atmospheric Dump Valves-Emergency Diesel Generator (EDG) Fuel Oil Storage Tank T-175B*4Station implemented enforcement discretion guidance documentsEGM 15-002 and DSS-ISG-2016-01 5COMPENSATORY MEASURES*Immediate Compensatory Measures-Per DSS-ISG-2016-01 guidance*Comprehensive Compensatory Measures-Procedurally controlled measures-FLEX equipment sharing*Other Discernable Changes from Original Station Design-FLEX implementation-Station modifications (design basis and beyond design basis)*5Compensatory measures in place; original station design improved over time and enhanced ability to mitigate a tornado missile event 6RESOLUTION STRATEGY*The resolution strategy is to validate that Tornado Missile is not a significant hazard for the site-LAR submittal and approval will clear nonconformances*Options Considered for LAR Development-TMRE (Point Beach was a pilot plant)-Site-specific High Winds PRA (RG 1.200, Rev. 2)*Selected Option -Site-specific High Winds PRA (RG 1.200, Rev. 2)*6License Amendment Request will screen out tornado missile as a significant hazard for the site 7RESOLUTION STRATEGY*Site-specific High Winds PRA-Industry leader-Developed in 2013Updated to reflect as-built/as-operated plant*7Site-specific High Winds PRA is peer-reviewed to ASME Standard and Regulatory Guide 1.200, Revision 2 8CONCLUSION*Entered Enforcement Discretion Process per EGM 2015-002*License Amendment Request submittal based on Site-Specific High Winds PRA-Site PRA concludes Tornado Missile is below the regulatory threshold in the Standard Review Plan and screens out as a significant hazard*Plan to submit LAR in second half of 2018*8License Amendment Request will screen out tornado missile as a significant hazard for the site | -Lori Christensen, PB Licensing Project Manager*3 4CURRENT STATUS*Background*Initial Nonconformance Declaration (U1 & U2)-Turbine Driven Auxiliary Feedwater Pumps (TDAFPs) for unprotected steam supply piping*Extent of Condition (U1 & U2)-TDAFPs for unprotected turbine exhaust stacks-Main Steam Isolation Valves, Main Steam Safety Valves, Atmospheric Dump Valves-Emergency Diesel Generator (EDG) Fuel Oil Storage Tank T-175B*4Station implemented enforcement discretion guidance documentsEGM 15-002 and DSS-ISG-2016-01 5COMPENSATORY MEASURES*Immediate Compensatory Measures-Per DSS-ISG-2016-01 guidance*Comprehensive Compensatory Measures-Procedurally controlled measures-FLEX equipment sharing*Other Discernable Changes from Original Station Design-FLEX implementation-Station modifications (design basis and beyond design basis)*5Compensatory measures in place; original station design improved over time and enhanced ability to mitigate a tornado missile event 6RESOLUTION STRATEGY*The resolution strategy is to validate that Tornado Missile is not a significant hazard for the site-LAR submittal and approval will clear nonconformances*Options Considered for LAR Development-TMRE (Point Beach was a pilot plant)-Site-specific High Winds PRA (RG 1.200, Rev. 2)*Selected Option -Site-specific High Winds PRA (RG 1.200, Rev. 2)*6License Amendment Request will screen out tornado missile as a significant hazard for the site 7RESOLUTION STRATEGY*Site-specific High Winds PRA-Industry leader-Developed in 2013Updated to reflect as-built/as-operated plant*7Site-specific High Winds PRA is peer-reviewed to ASME Standard and Regulatory Guide 1.200, Revision 2 8CONCLUSION*Entered Enforcement Discretion Process per EGM 2015-002*License Amendment Request submittal based on Site-Specific High Winds PRA-Site PRA concludes Tornado Missile is below the regulatory threshold in the Standard Review Plan and screens out as a significant hazard*Plan to submit LAR in second half of 2018*8License Amendment Request will screen out tornado missile as a significant hazard for the site}} | ||
}} |
Revision as of 21:29, 17 May 2018
ML18108A015 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 05/01/2018 |
From: | Point Beach |
To: | Division of Operating Reactor Licensing |
Chawla M L, NRR/DORL/LPLIII, 415-8371 | |
References | |
Download: ML18108A015 (8) | |
Text
NextEra Approach to Resolution ofTornado Missile ProtectionPoint Beach Nuclear Plant Units 1 & 2May 1, 2018 2AGENDA*Introductions*Current Status*Compensatory Measures*Resolution Strategy*Conclusion 3INTRODUCTIONS*NRC*NextEra Point Beach Team-Steve Catron, Fleet Licensing Manager-Anil Julka, Reliability & Risk Manager
-Eric Schultz, PB Licensing Manager
-Lori Christensen, PB Licensing Project Manager*3 4CURRENT STATUS*Background*Initial Nonconformance Declaration (U1 & U2)-Turbine Driven Auxiliary Feedwater Pumps (TDAFPs) for unprotected steam supply piping*Extent of Condition (U1 & U2)-TDAFPs for unprotected turbine exhaust stacks-Main Steam Isolation Valves, Main Steam Safety Valves, Atmospheric Dump Valves-Emergency Diesel Generator (EDG) Fuel Oil Storage Tank T-175B*4Station implemented enforcement discretion guidance documentsEGM 15-002 and DSS-ISG-2016-01 5COMPENSATORY MEASURES*Immediate Compensatory Measures-Per DSS-ISG-2016-01 guidance*Comprehensive Compensatory Measures-Procedurally controlled measures-FLEX equipment sharing*Other Discernable Changes from Original Station Design-FLEX implementation-Station modifications (design basis and beyond design basis)*5Compensatory measures in place; original station design improved over time and enhanced ability to mitigate a tornado missile event 6RESOLUTION STRATEGY*The resolution strategy is to validate that Tornado Missile is not a significant hazard for the site-LAR submittal and approval will clear nonconformances*Options Considered for LAR Development-TMRE (Point Beach was a pilot plant)-Site-specific High Winds PRA (RG 1.200, Rev. 2)*Selected Option -Site-specific High Winds PRA (RG 1.200, Rev. 2)*6License Amendment Request will screen out tornado missile as a significant hazard for the site 7RESOLUTION STRATEGY*Site-specific High Winds PRA-Industry leader-Developed in 2013Updated to reflect as-built/as-operated plant*7Site-specific High Winds PRA is peer-reviewed to ASME Standard and Regulatory Guide 1.200, Revision 2 8CONCLUSION*Entered Enforcement Discretion Process per EGM 2015-002*License Amendment Request submittal based on Site-Specific High Winds PRA-Site PRA concludes Tornado Missile is below the regulatory threshold in the Standard Review Plan and screens out as a significant hazard*Plan to submit LAR in second half of 2018*8License Amendment Request will screen out tornado missile as a significant hazard for the site