05000282/LER-1998-005, Forwards LER 98-005-01,re Inoperability of Actuation Logic for MSIV in Certain Flooding Conditions from Feedwater Line Break.Commitments Made within Ltr,Encl: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[05000282/LER-1998-005]]
{{Adams
| number = ML20247R287
| issue date = 05/22/1998
| title = Forwards LER 98-005-01,re Inoperability of Actuation Logic for MSIV in Certain Flooding Conditions from Feedwater Line Break.Commitments Made within Ltr,Encl
| author name = Sorensen J
| author affiliation = NORTHERN STATES POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000282
| license number =
| contact person =
| document report number = NUDOCS 9805290109
| package number = ML20247R290
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
}}
{{LER
| Title = Forwards LER 98-005-01,re Inoperability of Actuation Logic for MSIV in Certain Flooding Conditions from Feedwater Line Break.Commitments Made within Ltr,Encl
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000282
| LER year = 2098
| LER number = 5
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:_____                                                          .                                  .
Northern States Power Company          l l
Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch. Minnesota 55089                  i May 22,1998                                                  10 CFR Part 50 Section 50.73 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306              DPR-60 LER 1-98-05, Supplement 1 Inoperability of Actuation Logic for Main Steam isolation Valves in Certain Flooding Conditions from a Feedwater Line Break This supplement to LER 1-98-05 describes an additionalinstance where a postulated feedwater line break induced flood could have rendered Unit 2 Train A MSIV manual actuation inoperable. This instance was not reported via the Emergency Notification System because it was not reportable in accordance with 10 CFR 50.72.
l In the report, we reiterated two NRC commitments (previously submitted with the original LER on April 22,1998) indicated as the Corrective Actions section statements in bold italics. No additional commitments have been made as a result of the additional              ;
occurrence.
1 i
b 9905290109 900522 PDR    ADOCK 05000282 S                    PDR u-      - - - -
 
USNRC                                            NORTHERN STATES POWER COMPANY May 21,1998 Page 2 Please. contact us if you require additional information related to these events.
Joel P Sorensen Plant Manager Prairie Island Nuclear Generating Plant l
c:  Regional Administrator - Region 111, NRC NRR Project Manager, NRC Senior Resident inspector, NRC Kris Sanda, State of Minnesota Attachment l
                                                                                            >
}}
 
{{LER-Nav}}

Latest revision as of 00:41, 3 February 2022

Forwards LER 98-005-01,re Inoperability of Actuation Logic for MSIV in Certain Flooding Conditions from Feedwater Line Break.Commitments Made within Ltr,Encl
ML20247R287
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 05/22/1998
From: Sorensen J
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247R290 List:
References
NUDOCS 9805290109
Download: ML20247R287 (2)


LER-2098-005, Forwards LER 98-005-01,re Inoperability of Actuation Logic for MSIV in Certain Flooding Conditions from Feedwater Line Break.Commitments Made within Ltr,Encl
Event date:
Report date:
2822098005R00 - NRC Website

text

_____ . .

Northern States Power Company l l

Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch. Minnesota 55089 i May 22,1998 10 CFR Part 50 Section 50.73 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 LER 1-98-05, Supplement 1 Inoperability of Actuation Logic for Main Steam isolation Valves in Certain Flooding Conditions from a Feedwater Line Break This supplement to LER 1-98-05 describes an additionalinstance where a postulated feedwater line break induced flood could have rendered Unit 2 Train A MSIV manual actuation inoperable. This instance was not reported via the Emergency Notification System because it was not reportable in accordance with 10 CFR 50.72.

l In the report, we reiterated two NRC commitments (previously submitted with the original LER on April 22,1998) indicated as the Corrective Actions section statements in bold italics. No additional commitments have been made as a result of the additional  ;

occurrence.

1 i

b 9905290109 900522 PDR ADOCK 05000282 S PDR u- - - - -

USNRC NORTHERN STATES POWER COMPANY May 21,1998 Page 2 Please. contact us if you require additional information related to these events.

Joel P Sorensen Plant Manager Prairie Island Nuclear Generating Plant l

c: Regional Administrator - Region 111, NRC NRR Project Manager, NRC Senior Resident inspector, NRC Kris Sanda, State of Minnesota Attachment l

>