ML20154H934: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 3
| page count = 3
| project =  
| project = TAC:67109, TAC:67110
| stage = Request
| stage = Request
}}
}}
Line 25: Line 25:
R. P. Mcdonald Senior Vice President                                                        Alabama Power the sourhem electnc system May 20, 1938 10CFR50.90 Docket Nos. 50-348 50-364 U. S. Nuclear Regulato..y Commission ATTN: Document Control Desk Vashington, DC 20555 Gentlemen:
R. P. Mcdonald Senior Vice President                                                        Alabama Power the sourhem electnc system May 20, 1938 10CFR50.90 Docket Nos. 50-348 50-364 U. S. Nuclear Regulato..y Commission ATTN: Document Control Desk Vashington, DC 20555 Gentlemen:
Joseph M. Farley Nuclear Plant - Units 1 ar.d 2 Proposed Deletion of the Surveillance Specimen Vithdraval Schedule from the Technical Specifications (TAC Nos. 67109/67110)
Joseph M. Farley Nuclear Plant - Units 1 ar.d 2 Proposed Deletion of the Surveillance Specimen Vithdraval Schedule from the Technical Specifications (TAC Nos. 67109/67110)
By letter dated January 28, 1988, Alabama Power Company requested deletion of the Surveillance Specimen Vithdrawal Schedule from the Technical Specifications. This change was considered by Alabama Power Company to be administrative in nature since the program for surveillance of reactor vessel material vould continue to be governed by 10 CFR 50 Appendix H.                        In addition, the action proposed is consistent with licensing actions recently taken by the NRC on other facilities.          However, based on subsequent conversations with the NRC Staff, a revision to this submittal is necessary in order to obtain approval of the schedule deletion. This revision supersedes our previous submittal of January 28, 1988 and entails retaining the portion of paragraph 4.4.10.1.2 which reiterates the 10CFR50, Appendix H requirement that reactor vessel material irradiation surveillance specimens shall be removed and examined to determine changes in material properties.
By {{letter dated|date=January 28, 1988|text=letter dated January 28, 1988}}, Alabama Power Company requested deletion of the Surveillance Specimen Vithdrawal Schedule from the Technical Specifications. This change was considered by Alabama Power Company to be administrative in nature since the program for surveillance of reactor vessel material vould continue to be governed by 10 CFR 50 Appendix H.                        In addition, the action proposed is consistent with licensing actions recently taken by the NRC on other facilities.          However, based on subsequent conversations with the NRC Staff, a revision to this submittal is necessary in order to obtain approval of the schedule deletion. This revision supersedes our previous submittal of January 28, 1988 and entails retaining the portion of paragraph 4.4.10.1.2 which reiterates the 10CFR50, Appendix H requirement that reactor vessel material irradiation surveillance specimens shall be removed and examined to determine changes in material properties.
Attachment 1 contains the revised proposed changed Technical Specification pages. Alabama Power Company has determined that the proposed change does not involve a significant hazards consideration. The required analysis, pursuant to 10 CFR 50.92, is provided as Attachment 2.
Attachment 1 contains the revised proposed changed Technical Specification pages. Alabama Power Company has determined that the proposed change does not involve a significant hazards consideration. The required analysis, pursuant to 10 CFR 50.92, is provided as Attachment 2.
Alabama Power Company's Plant Operations Review Committee has reviewed the proposed change and the Nuclear Operations Review Board vill review the proposed change at a future mee*.ing. It is still requested that this proposed change be approved by August 31, 1988. The License Amendment Application Fee of $150.00 as required by 10 CFR 170.21 was submitted with the January 28, 1988 request. A copy of the proposed change has been sent to Dr. C. E. Fox, the Alabama State Designee, in accordance with 10 CFR 50.91(b)(1).
Alabama Power Company's Plant Operations Review Committee has reviewed the proposed change and the Nuclear Operations Review Board vill review the proposed change at a future mee*.ing. It is still requested that this proposed change be approved by August 31, 1988. The License Amendment Application Fee of $150.00 as required by 10 CFR 170.21 was submitted with the January 28, 1988 request. A copy of the proposed change has been sent to Dr. C. E. Fox, the Alabama State Designee, in accordance with 10 CFR 50.91(b)(1).

Latest revision as of 06:22, 10 December 2021

Application for Amends to Licenses NPF-2 & NPF-8,retaining Portion of Paragraph 4.4.10.1.2 Which Reiterates 10CFR50, App H Requirement That Reactor Vessel Matl Irradiation Surveillance Specimens Shall Be Removed & Examined
ML20154H934
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/20/1988
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20154H938 List:
References
TAC-67109, TAC-67110, NUDOCS 8805260119
Download: ML20154H934 (3)


Text

,. .. . . ..

i Altbsma Power Company

. 600 North 18th Strtet

. Post Clffice Box 2M1 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 L

R. P. Mcdonald Senior Vice President Alabama Power the sourhem electnc system May 20, 1938 10CFR50.90 Docket Nos. 50-348 50-364 U. S. Nuclear Regulato..y Commission ATTN: Document Control Desk Vashington, DC 20555 Gentlemen:

Joseph M. Farley Nuclear Plant - Units 1 ar.d 2 Proposed Deletion of the Surveillance Specimen Vithdraval Schedule from the Technical Specifications (TAC Nos. 67109/67110)

By letter dated January 28, 1988, Alabama Power Company requested deletion of the Surveillance Specimen Vithdrawal Schedule from the Technical Specifications. This change was considered by Alabama Power Company to be administrative in nature since the program for surveillance of reactor vessel material vould continue to be governed by 10 CFR 50 Appendix H. In addition, the action proposed is consistent with licensing actions recently taken by the NRC on other facilities. However, based on subsequent conversations with the NRC Staff, a revision to this submittal is necessary in order to obtain approval of the schedule deletion. This revision supersedes our previous submittal of January 28, 1988 and entails retaining the portion of paragraph 4.4.10.1.2 which reiterates the 10CFR50, Appendix H requirement that reactor vessel material irradiation surveillance specimens shall be removed and examined to determine changes in material properties.

Attachment 1 contains the revised proposed changed Technical Specification pages. Alabama Power Company has determined that the proposed change does not involve a significant hazards consideration. The required analysis, pursuant to 10 CFR 50.92, is provided as Attachment 2.

Alabama Power Company's Plant Operations Review Committee has reviewed the proposed change and the Nuclear Operations Review Board vill review the proposed change at a future mee*.ing. It is still requested that this proposed change be approved by August 31, 1988. The License Amendment Application Fee of $150.00 as required by 10 CFR 170.21 was submitted with the January 28, 1988 request. A copy of the proposed change has been sent to Dr. C. E. Fox, the Alabama State Designee, in accordance with 10 CFR 50.91(b)(1).

,o /

8805260119 880520 PDR ADOCK 05000348 l P DCD lf}l f I

_ --- _ - - - - -- ]

, ' U. S. Nuclear Regulatory Commission Page 2 If there are any questions, please advise.

Respectfully submitted, ALABAMA POWER COMPANY ld,). NAM N R. P. Mcdonald

  • RPM / JAR: dst-TS1V8.22 SVORN TO AND SUBSCRIBED BEFORE ME Enclosure cc: Mr. L. B. Long THIS DAY OF \ od , 1988 Dr. J. N. Grace
  • Mr. E. A. Reeves o ryPublicQT Mr. W. H. Bradford Dr. C. E. Fox Hy Co ission Expirest S-%-?8 h

l

, . _ , - , _ . . . . _ _ _ - . _ _ _ ,_.-_ _ ___. , - - . . . - - .__ ,__. m_, __. __

6 ATTACHMENT 1 Proposed Changed Pages Unit 1 Revision Page 3/4 4 27 Replace I Page 3/4 4-28 Replace-Page B3/4 4-8 Replace Unit 2 Revision Fage 3/4 4-27 Replace Page 3/4 4-28 Replace Page B3/4 4-8 Replace 9

9 4

?

L

)

TS1V8.23 -

t r

- , -,.-,,--.w-, ,,,-, ., , -=. --,..,., ,,. ,.-,,r-.------.n~ .

.n,-, a - ,-, - -e,-.,,nn,r,, , - , - - , . , , nr... -e,--,.---,---