Forwards Proposed Schedules for Submission & Requested Completion of Licensing Items
ML20245B632
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/19/1989
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-65224, TAC-65225, TAC-65482, TAC-65489, TAC-66678, TAC-66777, TAC-66778, TAC-67109, TAC-67110, TAC-67559, TAC-67960, TAC-68013, TAC-68014, TAC-68236, TAC-68237, TAC-71073, NUDOCS 8906230261
Download: ML20245B632 (7)


Text

Alabama Powtf Company

. 40 lnverness Center Parkway.

- +

'

  • Post Office Box 1295 Dirmingham, Alabama 35201 Telephone 205 868-5581-

' W. G. Hairston, til '

Senior Vice President -

Nuclear Operations

%3 ham 3%grep June-19, 1989 the southem electnc system f

10 CFR~50.90 q

l a

f Docket Nos.

50-348 50-364 l

U. S. Nuclear Regulatory Commission l

4 ATTN: Document Control Desk Washington, DC' 20555 Gentlemen:

Joseph M. Farley Nuclear Plant - Units 1 and 2 Status of Licensing Items Attached for your information are the proposed schedules for the submission and requested completion of licensing items.. Attachment 1 i

contains a prioritized listing of license amendment'and'other requests and Attachment 2'contains a listing'of other NRC related submittals.

a During 1988 nine requested licensing actions vere dispositioned.by the NRC. Alabama Power Company appreciates NRC efforts in this area.

If you have any questions, please advise.

Respectively submitted, W. G. h W

@'L-Hairston, III l

VGH,III/ JAR sle 7.56 Attachments cc:

Mr. M. L. Ernst Mr. E. A. Reeves Mr. G. F. Ma u ell 8906230261 890619 PDR ADOCK 05000348 I \\

P PDC

\\

s ATLOMNT 1 STARIS OF LIGNSE AMRMENT A!O OIHER RIOLESTS IPOPOSED ACRML REOLESifD ACRIAL AP00 APCo fBC.

!@C lEC SUBETTAL SLEKrlTAL APPROVAL AP!WNAL -

TAC IIEM IRIE DGE (S)

DGE IRTE L

RDMIES 1.

End of Life 06-30-89 12-29-89 Safety Cycle Moderator evaluation Temperature Co-vill be efficient, similar to PNP-1 and 2 Millstone 3,

.(T.S.3.1.1.3) an==wh==1t

  1. 29.

2.

Operational 07-14-89 01-12-90 Evaluation Program

Deletion, l

PNP-1 and 2 l

(T.S.6.2.3.3) q 3.

Visual Inspection 07-21-89 01-26-90 Required Surveillance prior to i

I%riodicity for July 1990.

l Inaccessible Vill be I

Snubbers,FNP-2 similar to l

FNP amend-ments M9/61.

i Safety eval-4.

Control Rod 07-28-89 02-02-90 Insertion uation vill-Limits, PNP-1 be similar arxl2 to Point (T.S.3.1.3.5)

Beach medimits j

M8/93.

5.

ESFAS Time 08-04-89 01-26-90 Response O mnge j

1 for SI, FNP-1 & 2, i

(T.S. 3/4.3.2) 1 l

l l

l l

1

_ ______ _ _________ __ - _ a

-St:tm of License Amendment arxi Other Requests Page 2-PROPOSED ACIVAL RE E TED ACITML APCo APCb

'180 NC

- l@C SlB EITAL StBEITAL APPMNAL APPlVNAL TAC ITDI IW1E IMTE (S)

DAIE IMTE j_

REMARKS 6.

Auxiliary 08-25-89 02-23-90 Building & Service Water Battery

}

Surveillance Tests, FNP-1 armi 2 (T.S.4.8.

2.3.2.c.5)

Original

]

02-09-90 7.

Removal of 08-18-89 Fire Protection request of 7-16-87 Requiremmts from Technical placed on Specifications hold by N C -

]

(Generic letter letter of~

i 88-12), FNP-1 02-24-88.

l and 2 02-26-90 8.

Auxiliary 08-25-89 Samplirg crace Period, FNP-1 and 2 (T.S.3.3.3.11) 04-20-90 Potential 9.

RHR Suction 1420-89 Valve Auto reference Closure Inter-to V0G I

lock Removal, activities FNP-1 and 2 may be (T.S. 3/4.9.8) made.

3 10.

Quadrant Pwer 07-07-89 01-05-90

)

i Tilt Ratio Alternate

'Ihimble Ilse, FNP-1 and 2 i

(T.S.3/4.2.4.2) 11.

Fiel Recon-11-16-09 05-24-90 sititution, FNP-1 and 2 (T.S.5.3) 12.

Additional ISI 09-09-88 03-0749 65482 Reliefs for 2nd 10-Year Interval, FNP-1 13.

Additional IST 09-0948 03-07-89 65489 Reliefs for 2nd 10-Year Interval, FNP-1

Attadinent 1

i Status of Lic m se

. Amendment ard Otbr Pequests

.Page 3-HOPOSED ACIUAL IEVESITD ACIUAL APCo AICo IE ITC IE SUEMrITAL SlD EITAL APPf W AL APPRWAL TAC TIEM IRTE MTE (S)

DWIE IMTE L

REMARKS 14.

Miscellaneous 03-20-89 09-1589 72876 T.S. Onnges, 72877 HP-1 ard 2 15.

Incorporate Tech 09-29-89 03-30-90 Spec O mnges Allowed by Generic Irtter 87-09 (this revises 3.0.4 ard 4.0.3 criteria), RF-1 ard 2 16.

R move Cycle 11-17-89 0518-90 Specific Parameters fmn Tech Specs per i

Generic letter 88-16 l

l 17 Low Flow INE 09-08-89 OLO9-90 Letter only, Bases Correction, not an H P-1 and 2 amendment (T.S. Bases request.

2.2.1) 18.

Delta Flux 09-22-89 OL2L90 latter only, Deviatim not an Alarm Setpoint, uneduit RF-1 and 2 request.

(T.S. ILves 3/4.2.1) 19.

Meteorological 12-09-87 03-08-88 66777 Complete Ibta onnge, 66778 75/67 R f I and 2 (T.S.6.9.1.9) 20.

Interim ISr 03-17-88 OL30-88 67559 Complete Reliefs for 2nd 10-ymr Period, H4P-1 O' 28-88 05-12-88 67960 Conplete 21.

Reactor Vessel ISI 1rdications 054)5-88 Approval, RF-1 22.

Miysical Security None 05-27-88 65224 Complete Plan License 65225 76/68 Anndw.nt I

h

.]

. ' Attachment 1 Status,of License knendnent and Other Requests Page 4 -

PRoPosua enEL RBQUESIED EnEL APCo APCo

!@C

!@C l@C j

StBEITAL SLB EITAL-APPROVAL APPROVAL.

TAC l

I'HH IRTE IRTE (S)

DAIE IRTE RDERKS 1

23.

Renoval of 04-28-88 07-08-88 68013 Complete 68014 77/69 Onynization Omrts from.

Tech Spec Control, FNP-1 3

J arxl 2 (T.S.6.2) 05-10-88 07-18-88 68236' Complete

'l 24.

Organization Omnge of SVP 05-26-88 68237

-78/70' to VP, PtF-1~

and2(T.S.

j 6.1, 6.2, 6.5, l

6.6) 25.

Surveillance 01-28-88 08-22-88 67109 Couplete Capsule 05-2048 67110 79/71 l

I Withdrawal

Schedule, FNP-1 and 2 j

(T.S. Table t

4.4-5) 1 26.

Inservice 06-22-88 0B-31-88 66678 Complete Inspection and Testing Scidole Exemptions to Utilize latest ASME Code,Section XI, FNP-2 l

1 27.

Snubber Visual-10-26-88 12-11-88 71673 Complete l

Inspection Table 71074 l

Interpretation, HP-1 (T.S. 3/4.7.9) 28.

Updated ISI 12-16-88 06-01-90 71578 Iwtial Pitgra:n Relief 06-0B49 interim Requests, INP-2 relief granted 03-31-89.

29.

Updated IST 06-26-89 12-15-88 08-31-89 71579 Partial Program Relief interim Requests, FNP-2 relief granted 03-31-89.

'B'

- Status of Lica me Anendumt and Other Requesta Page 5 PR0KISED ACIU L REOLESITD ACIW1 APCo APCo.

IEC

<18C IEC SUBEITAL SI M ITTAL APPROVAL APP! W AL TAC ITEM DUE DA3E (S)

DE DGE

-y_

RIMES

- 30.

IEC Bulletin IE 08-29-88 04-28-89 67306 Complete by 88-02 Analysis 67307 interim

Approval, relief.'

PNP-1 and 2 12-14-88 OS M 59732 Omplete 31.

RCITS (Rx Vessellevel) 01-F 89 59733 80/72 Surveillance, 04-06-89 PNP-1 and 2 32.

Bctend 08-11-86 05-19-89 62187 Canplete Operatirs 07-22-87 62188-81n3 -

Limnse Dcpiration Date, PNP-1 and 2 JAR: sic 4.59

M TAat etr 2 SDmE W ODER IEC IMMED SBE1TAIS PROPOSED ACIML APCo APCo

!#C stb GTIAL SLDEITAL TAC nDi '

DATE DATE(S)

RH4 APES 1.

10CPR50.62 AMSAC 59092 Operational: thit 18th 59093 R.O., thit 2 5th R.O.

ISC SER issued 10-31-88.

a. Isolation Device 02-27-87 Couplete Information
b. Plant Specific 1249-87.

Complete Questions Addressed c.

tdditional Informa-04-28-88 Conplete tion

2..Startup Reports a.

thit 1, Cycle 9 01-19-90 N/A 90 days after startup

b. thit 2, Cycle 7 08-15-89 N/A 90 days after startup 3.

1988 Annual Report of 03-2949 N/A Complete Plant m anges, FNP-1 and 2 4.

1989 FSAR Update 07-01-89 N/A

5. Radial Peaking Factor Report a.

thit 1, Cycle 10 09-15-89 N/A.

b. thit 2, Cycle 7 02-22-89 N/A Complete

.j 6.

NLFE-0737, Iten II.D.1, 09-16-88 69571 Fornerly TAC #44579 ard Safety Valve Discharge 69572

  1. 44580.

Complete 7.

Annual D/G Reliability 03-29-89 Reoort 8.

Monthly Plant Status Monthly Monthly N/A L

to IEC Project Manager 9.

Status of Licensirg Seni-Annual Semi-Annual N/A Items I

JAR: sic 4.45 1

I

_ _ _ _ _ - _. _