ML20065G926: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:--                                .        ._
{{#Wiki_filter:}}
i 4
* 4                                                                                                                          J
* COOPER NUCLE AA STATON P.o. BOX 96. BROWNVILLE, NEBRASKA 68321 Nebraska Public Power District              _  _
                                                                                                '"Sq={""_                                y l
CNSS948587 April 8, 1994 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555
 
==Subject:==
Monthly Operating Status Report for March, Docket No. 50-298.
Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for March 1994. The report includes Operating Status,
.                Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of
!                Operating Experience, j                Should you have any comments, or require additional information regarding this l                report, please contact me.
i Sincerely, R. L. Gardner l                Plant Manager RLG:JRD: dis l                Enclosures l
cc:      G. D. Watson L. J. Callan l
l l
l40004 9404130365 940331 PDR
                                                                                                            /
R      ADOCK 05000298                                                            f l {i j                                                  PDR    .
                  .' !      i' ,,'''* ;                  '
_I
                          = , <., _ - _                              . _ _ . _ . _ . _-
                                                                                                                    . - .__ - _ ,        a
 
OPERATING DATA REPORT DOCKET NO,            050-0298
                        .                                                                                        UNIT        CNS DATE        April 8. 1994 OPERATING STATUS                                                                                TELEPHONE            (402) 825-5396
: 1.          Unit Nam 6.          COODer Nuclear Station                          Notes
: 3.          Reporting Period:              March 1994
: 3.          Ucensed Thermal Power (MWt):            2381
: 4.          Nameplate Rating (Gross MWe):            836
: 5.          Design Electrical Rating (Not MWe):              778
: 6.          Maximum Dependable Capacity (Gross MWe):              787
: 7.          Maximum Dependable Capacity (Not MWe):                764
: 8.          If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
I
[        0.          Power Level To Which Restricted, if Any (Not MWe):
: 10.          Reasons For Restriction, if Any:
l This Month                  Yr.-to-Date              Cumulative
                                                                                                                                                    ]
: 11.          Hours in Reporting Period                                          744.0                      2.160.0              173.137.0  '
: 12.          Number of Hours Reactor Was Critical                              343.4                      1.759.4              131.873.2
: 13.          Reactor Reserve Shutdown Hours                                        0.0                        0.0                    0.0
: 14.          Hours Generator On-Une                                            300,0                      1.716.0              129.962.3
: 15.          Unit Reserve Shutdown Hours                                            0.0                        0.0 -                  0.0
: 16.          Gross Thermal Energy Generated (MWH)                          541.152.0                  3.849.168.0          268.207.060.0
: 17.          Gross Electric Energy Generated (MWH)                        173.806.0                  1.276.995.0          87.098.893.0
: 18.          Net Electric Energy Generated (MWH)                          167.887.0                  1.237.289.0            84.108.467.0
: 10.          Unit Service Factor                                                  40.3                        79.4                  75.1
: 20.          Unit Availability Factor                                              40.3                        79.4                  75.1 1
: 21.          Unit Capacity Factor (Using MDC Net)                                  29.5                        75.0                  63.6
: 22.          Unit Capacity Factor (Using DER Net)                                  29A.                        73.6                  62.4
: 23.          Unit Forced Outage Rate                                              59.7                        20.6                    4.5
: 24.          Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l      25.          If Shut Down At End of Report Period, Estimated Date of Startup:
: 26.          Units in Test Status (Prior to Commercial Operation):    Forecast                    Achieved INITIAL CRITICAlfTY INITIAL ELECTRICITY COMMERCIAL OPERATION i
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-0298 UNIT  CNS DATE  ADril 8,  1994 TELEPHONE  (402) 825-5396 MONTH        March 1994 DAY    AVERAGE DAILY POWER LEVEL    DAY      AVERAGE DAILY POWER LEVEL (MWe-Net)                              (MWe-Net) 1                  742              17                          0-2                  551              18                          0 3                      0            19                          0 4                      0            20                          0 5                      0            21                          0 1
1 6                      0            22                          0 7                      0            23                          0 8                      0            24                          62 9                      0            25                        526 10                    0            26                        709 11                    0            27                        759 12                    0            28                        771 r      13                    93            29                        770 14                  179              30                        769 15                  144              31                        769 16                  152 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
I i
 
UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                                                                                  ,
                                                                                                                                                                                                                                                                      ^
DOCKET NO.                        050 &298                        '_
UNIT NAME                        Cooper Nuclear Station DATE                            April 8.1994                  =
,                                                                                                                                                                                                        COMPLETED BY                    J. R. Dedic' TELEPHONE                        (402) 825-5396 REPORT MONTH March 1994                                                                                                                                                                        ,
i Method Of                                              Licensee                                                            Cause & Corrective Duration                      Shutting                                                      Event          System'      Cornponent'                            Action to 2                                                                                                                                    Prevent Recurrence No.            Date                    Type'      (Hours)      Reason        Down Reactor'                                                  Report            Code            Code 94-3        3/2/94                      F        256.5            A              3                                                        94 G4              JJ              RJX        Partial closure of turbine governor valves due to turbine control sysem mat'uncbon retutting in a reactor high flux and subsequent automatic                                          !
scram. Replaced failed power supplies.
94-4        3/16/94                      F        187.5            A              2                                                              N/A          N/A            N/A        Vatve RHR-MO-27A failed surveillance testing.
Repaired RHR-MO-27A.                                                                !
t 6
h i
i i
1    F: Fo ced                          2    Reason:                                                                                                    3 Method:                    4    Exhibit G - Instructions for S: Scheduled                              A- Equipment Failure (Explain)                                                                                1 - Manual                      Preparation of Data Entry                                                            .
B - Maintenance or Test                                                                                      2 - Manual Scram                Sheets for tJcensee Event C - Refueling                                                                                                3 - Automatic Scram            Report (LER) File (NUREG0161)
D - Regulatory Restriction                                                                                    4 - Continued E - Operator Training & License Examination                                                                  5 - Reduced Load              5 Exhicit 1- Same Source F- Administrative                                                                                            6 - Other                                                                                                            i G - Operational Error (Explain)
H - Other (Explain) i 1
 
OPERATIONS NARRATIVE COOPER NUCLEAR STATION March 1994 Cooper Station operated at 100 percent for the month of March with the following exceptions:
: 1.      March 1 - Derate to perform RPS surveillance testing.
: 2.      March 2 Automatic scram due to high neutron flux caused by partial closure of turbine governor valves resulting from turbine -
control system malfunction.
: 3.      March 17 Manual scram to repair valve RHR-MO-27A.
A unit capacity factor of 29.5 percent (MDC Net) was attained for the month of March.
                                                                            .    . . . . .}}

Revision as of 00:46, 31 March 2020

Monthly Operating Rept for Mar 1993 for Cooper Nuclear Station.W/940408 Ltr
ML20065G926
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/31/1994
From: Dedic J, Gardner R
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CNSS948587, NUDOCS 9404130365
Download: ML20065G926 (5)


Text