Information Notice 1989-63, Possible Submergence of Electrical Circuits Located Above the Flood Level Because of Water Intrusion and Lack of Drainage: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 14: | Line 14: | ||
| page count = 4 | | page count = 4 | ||
}} | }} | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES | ||
COMMISSION | NUCLEAR REGULATORY COMMISSION | ||
OFFICE OF NUCLEAR REACTOR REGULATION | |||
5, 1989 NRC INFORMATION | WASHINGTON, D.C. 20555 September 5, 1989 NRC INFORMATION NOTICE NO. 89-63: POSSIBLE SUBMERGENCE OF ELECTRICAL | ||
CIRCUITS LOCATED ABOVE THE FLOOD LEVEL | |||
BECAUSE OF WATER INTRUSION AND LACK OF | |||
DRAINAGE | |||
==Addressees== | ==Addressees== | ||
: | : | ||
All holders of operating | All holders of operating licenses or construction permits for nuclear power | ||
reactors. | |||
==Purpose== | ==Purpose== | ||
: This information | : | ||
This information notice is being provided to alert addressees that electrical | |||
circuits located above the plant flood level within electrical enclosures may | |||
become submerged in water because appropriate drainage has not been provided. | |||
circuits | Failure of electrical circuits during service conditions, including postulated | ||
enclosures | accidents, can occur due to submergence if water enters these enclosures and | ||
there is no provision for drainage. The electrical enclosures addressed by this | |||
notice include terminal boxes, junction boxes, pull boxes, conduits, condulets, and other enclosures for end-use equipment (such as limit switches, motor oper- ators, and electrical penetrations), the contents of which may include cables, terminal blocks, electrical splices and connectors. It is expected that reci- pients will review this information for applicability to their facilities and | |||
consider actions, as appropriate, to avoid similar problems. However, sugges- tions contained in this information notice do not constitute NRC requirements; | |||
therefore, no specific action or written response is required. | |||
==Description of Circumstances== | |||
: | |||
On March 20, 1989, the Clinton Power Station experienced an unexpected ingress | |||
of water into the drywell. About 10 feet of water from the dryer pool drained | |||
into the reactor cavity pool causing about 4 inches of standing water in the | |||
drywell. Following the event, the licensee found evidence of water intrusion | |||
in several electrical enclosures located above the flood level. These enclosures | |||
did not have drain holes. The licensee corrected the problem by drilling holes | |||
in all appropriate Junction boxes, terminal boxes, pull boxes, condulets, and | |||
enclosures | end-use equipment enclosures inside the drywell and the containment. | ||
The Monticello plant found that a junction box for RHR pump motor leads con- tained several inches of water (NRC Inspection Report 50-263/87-013-DRS). The | |||
box did not have a drain hole. The licensee initially determined that the as- sociated conduits were routed through humid areas, which could have resulted | |||
8908290014 | |||
< N 89-63 dSeptember 5, 1989 in condensation from the conduits accumulating in the box. However, the licensee | |||
later postulated that hosing down of equipment in that area may have caused water | |||
to enter the box through unsealed openings. In this instance, the circuits were | |||
found wet but not yet submerged in the accumulating water. The licensee drilled | |||
to | weep holes in all appropriate motor-lead junction boxes and other enclosures to | ||
correct the problem. | |||
During an inspection performed at Clinton Power Station from August 17 through | |||
August 21, 1987, NRC inspectors identified a terminal box without drain holes. | |||
The box was required to be environmentally qualified in accordance with the | |||
requirements of 10 CFR 50.49. Although the box was located above the postulated | |||
plant flood level, it was subject to possible water and moisture intrusion that | |||
an | could submerge the contents of the box in an accident. Subsequently, the licensee | ||
identified 156 terminal boxes without drain holes, which could affect multiple | |||
safety systems. The licensee drilled drain holes in the affected terminal boxes. | |||
During a followup inspection performed from February 6 through February 24, 1989, the NRC identified six additional junction boxes requiring drain holes. Several | |||
of these boxes contained taped electrical splices which the licensee's environ- mental qualification program had not demonstrated to be environmentally qualified | |||
to perform their required function for the required duration if they became sub- merged following a loss-of-coolant accident (LOCA). Following this finding, the | |||
licensee identified numerous other enclosures with taped splices that required | |||
drain holes. | |||
Discussion: | |||
The NRC regulation pertaining to environmental qualification specifically | |||
regarding submergence is addressed in 10 CFR 50.49(e)(6), which states that | |||
the electrical equipment qualification program must consider submergence (if | |||
subject to being submerged). The regulation also makes reference to two | |||
guidance documents: "Guidelines for Evaluating Environmental Qualification | |||
of Class lE Electrical Equipment in Operating Reactors," November 1979 (DOR | |||
Guidelines), and NUREG-0588, "Interim Staff Position on Environmental Quali- fication of Safety-Related Electrical Equipment." NUREG-0588, Paragraph 2.2(5) | |||
states that where equipment could be submerged, it should be identified and | |||
demonstrated to be qualified by test for the duration required. DOR Guide- lines, Section 6, state that particular emphasis should be placed on common | |||
problems, such as protective enclosures installed upside down with drain holes | |||
at the top and penetrations in equipment housings for electrical connections | |||
being left unsealed or susceptible to moisture intrusion through stranded | |||
conductors. | |||
in | Water can enter and accumulate in electrical enclosures located above the | ||
flood level through various unsealed openings, including enclosure covers, conduits, and conduit fittings. Water may enter an enclosure through a run | |||
of conduit from an upper elevation or by directly impinging on unsealed | |||
openings. Steam and humidity also may enter an enclosure through conduits | |||
and unsealed openings and then condense and accumulate at the bottom of the | |||
enclosure. The content of the enclosure may become submerged as a result. | |||
Proper drain holes will prevent this. | |||
V N 89-63 September 5, 1989 Submergence could occur during service conditions, including accidents such as | |||
a LOCA or other high-energy line break. For clarity,'aicomponent is considered | |||
submerged if it is partially or completely immersed in water. Submergence of | |||
components in electrical enclosures may occur even though the enclosures are | |||
located above the plant flood level because of inadequate drainage in the | |||
enclosure. | |||
Water intrusion also may occur from hosing down the equipment during house- keeping. It is important to note that extreme care needs to be taken during | |||
such activities so that the water does not penetrate unsealed enclosure openings | |||
and travel through conduits to enclosures at lower elevations. | |||
Information Notice 84-57, "Operating Experience Related to Moisture Intrusion | |||
on Safety-Related Electrical Equipment at Commercial Power Plants," addressed | |||
watertight sealing of all electrical conduits to junction boxes and conduit-to- terminal box connection points for safety-related equipment located in areas of | |||
the reactor building as well as for areas that are potentially subject to high | |||
temperature steam or water impingement. This notice further addressed the | |||
importance of ensuring that box drain holes and equipment interfaces are in | |||
conformance with the test setup established during equipment qualification | |||
testing and with the vendor's recommendations. | |||
This information notice requires no specific action or written response. If | |||
you have any questions about the information in this notice, please contact | |||
one of the technical contacts listed below or the appropriate NRR project | |||
--manager. | |||
Charles E. Rossi, Director | |||
Division of Operational Events Assessment | |||
Office of Nuclear Reactor Regulation | |||
Technical Contacts: A. S. Gautam, NRR | |||
(301) 492-1376 H. Walker, NRR | |||
(301) 492-0867 Attachment: List of Recently Issued NRC Information Notices | |||
Attachment | |||
11 89-63 September 5, 1999 Page 1 of I | |||
of | |||
LIST OFRECENTLY ISSUED | |||
NRC!IIFORMATION NCTICES | |||
Information | Information | ||
Notice | Notice No. Subject Issuance Issued to | ||
es.62 Malfunction of Borg-Warner 8/31/89 Pressure Seal Bonnet Check All holders of OLs | |||
Valves Caused By Vertical or CPs for nuclear | |||
Misalignment of Disk power reactors. | |||
of | |||
89-61 Failure of Borg-Warner Gate 8/30/89 Valves to Close Against All holders of OLs | |||
Differential Pressure or CPs for nuclear | |||
power reactors. | |||
of | 88-468 Licensee Report of Defective | ||
8/ | Supp. 2 Refurbished Valves 8/22/89 All holders of OLs | ||
or CPs for nuclear | |||
power reactors. | |||
89-6C Maintenance of Teletherapy 8/18/PS All NRCMedical | |||
Units Teletherapy Licensect. | |||
89-59 Suppliers of Potentially | |||
of | Misrepresented Fasteners 8/16/89 All holders of OLs | ||
or CPs for nuclear | |||
power reactors. | |||
89-5S Disablement of Turbine-Driven | |||
Auxiliary Feedwater Pump Due 8/3/89 All holoers of OLs | |||
of | to Closure of One of the or CPs for PWRs. | ||
Parallel Steam Supply Valves | |||
89-57 Unqualified Electrical 7/26/89 Splices in Vendor-Supplied All holders of OLs | |||
Environmentally Qualified or CPs for nuclear | |||
Equipment power reactors. | |||
7/ | 89-56 Questionable Certification 7/20/89 of material Supplied to the All holders of OLs | ||
Defense Department by Nuclear or CPs for nuclear | |||
Suppliers | |||
power reactors. | |||
7/ | 89-45, Metalclad, Low-Voltage 7/6/89 Supp. 1 Power Circuit Breakers All holders of OLs | ||
- RefawblisheWthl Substamlard- or CPs for nuclear | |||
Parts power reactbirs | |||
89-55 Degradation of Containment 6/30/69 All holders of OLs | |||
Isolation Capability by a or CPs for nuclear | |||
High-Energy Line Break powrer reactors. | |||
OL | |||
* Operating License | |||
CP* Construction Permit | |||
UNITED STATES | |||
===NUCLEAR REGULATORY COMMISSION=== | |||
FIRST CLASS MAIL | |||
WASHINGTON, D.C. 20555 POSTAGE b FEES PAID | |||
USNRC | |||
OFFICIAL BUSINESS PERMIT Ne. G-E7 PENALTY FOR PRIVATE USE, $300 | |||
120555003956 1 1CO1CV1CY1FB1 US NRC-OIRM | |||
DIV OF INFO SUP SVCS | |||
CHIEF | |||
RECORDS & ARCHIVES SVCS SECT | |||
DC 20555}} | W/F PD-122 WASHINGTON DC 20555}} | ||
{{Information notice-Nav}} | {{Information notice-Nav}} | ||
Revision as of 02:33, 24 November 2019
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, D.C. 20555 September 5, 1989 NRC INFORMATION NOTICE NO. 89-63: POSSIBLE SUBMERGENCE OF ELECTRICAL
CIRCUITS LOCATED ABOVE THE FLOOD LEVEL
BECAUSE OF WATER INTRUSION AND LACK OF
DRAINAGE
Addressees
All holders of operating licenses or construction permits for nuclear power
reactors.
Purpose
This information notice is being provided to alert addressees that electrical
circuits located above the plant flood level within electrical enclosures may
become submerged in water because appropriate drainage has not been provided.
Failure of electrical circuits during service conditions, including postulated
accidents, can occur due to submergence if water enters these enclosures and
there is no provision for drainage. The electrical enclosures addressed by this
notice include terminal boxes, junction boxes, pull boxes, conduits, condulets, and other enclosures for end-use equipment (such as limit switches, motor oper- ators, and electrical penetrations), the contents of which may include cables, terminal blocks, electrical splices and connectors. It is expected that reci- pients will review this information for applicability to their facilities and
consider actions, as appropriate, to avoid similar problems. However, sugges- tions contained in this information notice do not constitute NRC requirements;
therefore, no specific action or written response is required.
Description of Circumstances
On March 20, 1989, the Clinton Power Station experienced an unexpected ingress
of water into the drywell. About 10 feet of water from the dryer pool drained
into the reactor cavity pool causing about 4 inches of standing water in the
drywell. Following the event, the licensee found evidence of water intrusion
in several electrical enclosures located above the flood level. These enclosures
did not have drain holes. The licensee corrected the problem by drilling holes
in all appropriate Junction boxes, terminal boxes, pull boxes, condulets, and
end-use equipment enclosures inside the drywell and the containment.
The Monticello plant found that a junction box for RHR pump motor leads con- tained several inches of water (NRC Inspection Report 50-263/87-013-DRS). The
box did not have a drain hole. The licensee initially determined that the as- sociated conduits were routed through humid areas, which could have resulted
8908290014
< N 89-63 dSeptember 5, 1989 in condensation from the conduits accumulating in the box. However, the licensee
later postulated that hosing down of equipment in that area may have caused water
to enter the box through unsealed openings. In this instance, the circuits were
found wet but not yet submerged in the accumulating water. The licensee drilled
weep holes in all appropriate motor-lead junction boxes and other enclosures to
correct the problem.
During an inspection performed at Clinton Power Station from August 17 through
August 21, 1987, NRC inspectors identified a terminal box without drain holes.
The box was required to be environmentally qualified in accordance with the
requirements of 10 CFR 50.49. Although the box was located above the postulated
plant flood level, it was subject to possible water and moisture intrusion that
could submerge the contents of the box in an accident. Subsequently, the licensee
identified 156 terminal boxes without drain holes, which could affect multiple
safety systems. The licensee drilled drain holes in the affected terminal boxes.
During a followup inspection performed from February 6 through February 24, 1989, the NRC identified six additional junction boxes requiring drain holes. Several
of these boxes contained taped electrical splices which the licensee's environ- mental qualification program had not demonstrated to be environmentally qualified
to perform their required function for the required duration if they became sub- merged following a loss-of-coolant accident (LOCA). Following this finding, the
licensee identified numerous other enclosures with taped splices that required
drain holes.
Discussion:
The NRC regulation pertaining to environmental qualification specifically
regarding submergence is addressed in 10 CFR 50.49(e)(6), which states that
the electrical equipment qualification program must consider submergence (if
subject to being submerged). The regulation also makes reference to two
guidance documents: "Guidelines for Evaluating Environmental Qualification
of Class lE Electrical Equipment in Operating Reactors," November 1979 (DOR
Guidelines), and NUREG-0588, "Interim Staff Position on Environmental Quali- fication of Safety-Related Electrical Equipment." NUREG-0588, Paragraph 2.2(5)
states that where equipment could be submerged, it should be identified and
demonstrated to be qualified by test for the duration required. DOR Guide- lines, Section 6, state that particular emphasis should be placed on common
problems, such as protective enclosures installed upside down with drain holes
at the top and penetrations in equipment housings for electrical connections
being left unsealed or susceptible to moisture intrusion through stranded
conductors.
Water can enter and accumulate in electrical enclosures located above the
flood level through various unsealed openings, including enclosure covers, conduits, and conduit fittings. Water may enter an enclosure through a run
of conduit from an upper elevation or by directly impinging on unsealed
openings. Steam and humidity also may enter an enclosure through conduits
and unsealed openings and then condense and accumulate at the bottom of the
enclosure. The content of the enclosure may become submerged as a result.
Proper drain holes will prevent this.
V N 89-63 September 5, 1989 Submergence could occur during service conditions, including accidents such as
a LOCA or other high-energy line break. For clarity,'aicomponent is considered
submerged if it is partially or completely immersed in water. Submergence of
components in electrical enclosures may occur even though the enclosures are
located above the plant flood level because of inadequate drainage in the
enclosure.
Water intrusion also may occur from hosing down the equipment during house- keeping. It is important to note that extreme care needs to be taken during
such activities so that the water does not penetrate unsealed enclosure openings
and travel through conduits to enclosures at lower elevations.
Information Notice 84-57, "Operating Experience Related to Moisture Intrusion
on Safety-Related Electrical Equipment at Commercial Power Plants," addressed
watertight sealing of all electrical conduits to junction boxes and conduit-to- terminal box connection points for safety-related equipment located in areas of
the reactor building as well as for areas that are potentially subject to high
temperature steam or water impingement. This notice further addressed the
importance of ensuring that box drain holes and equipment interfaces are in
conformance with the test setup established during equipment qualification
testing and with the vendor's recommendations.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
one of the technical contacts listed below or the appropriate NRR project
--manager.
Charles E. Rossi, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical Contacts: A. S. Gautam, NRR
(301) 492-1376 H. Walker, NRR
(301) 492-0867 Attachment: List of Recently Issued NRC Information Notices
Attachment
11 89-63 September 5, 1999 Page 1 of I
LIST OFRECENTLY ISSUED
NRC!IIFORMATION NCTICES
Information
Notice No. Subject Issuance Issued to
es.62 Malfunction of Borg-Warner 8/31/89 Pressure Seal Bonnet Check All holders of OLs
Valves Caused By Vertical or CPs for nuclear
Misalignment of Disk power reactors.
89-61 Failure of Borg-Warner Gate 8/30/89 Valves to Close Against All holders of OLs
Differential Pressure or CPs for nuclear
power reactors.88-468 Licensee Report of Defective
Supp. 2 Refurbished Valves 8/22/89 All holders of OLs
or CPs for nuclear
power reactors.
89-6C Maintenance of Teletherapy 8/18/PS All NRCMedical
Units Teletherapy Licensect.
89-59 Suppliers of Potentially
Misrepresented Fasteners 8/16/89 All holders of OLs
or CPs for nuclear
power reactors.
89-5S Disablement of Turbine-Driven
Auxiliary Feedwater Pump Due 8/3/89 All holoers of OLs
to Closure of One of the or CPs for PWRs.
Parallel Steam Supply Valves
89-57 Unqualified Electrical 7/26/89 Splices in Vendor-Supplied All holders of OLs
Environmentally Qualified or CPs for nuclear
Equipment power reactors.
89-56 Questionable Certification 7/20/89 of material Supplied to the All holders of OLs
Defense Department by Nuclear or CPs for nuclear
Suppliers
power reactors.
89-45, Metalclad, Low-Voltage 7/6/89 Supp. 1 Power Circuit Breakers All holders of OLs
- RefawblisheWthl Substamlard- or CPs for nuclear
Parts power reactbirs
89-55 Degradation of Containment 6/30/69 All holders of OLs
Isolation Capability by a or CPs for nuclear
High-Energy Line Break powrer reactors.
- Operating License
CP* Construction Permit
UNITED STATES
NUCLEAR REGULATORY COMMISSION
FIRST CLASS MAIL
WASHINGTON, D.C. 20555 POSTAGE b FEES PAID
OFFICIAL BUSINESS PERMIT Ne. G-E7 PENALTY FOR PRIVATE USE, $300
120555003956 1 1CO1CV1CY1FB1 US NRC-OIRM
DIV OF INFO SUP SVCS
CHIEF
RECORDS & ARCHIVES SVCS SECT
W/F PD-122 WASHINGTON DC 20555