ML063250191: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED | {{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | ||
Southern Nuclear Operating Company, Inc.ATTN:Mr. L. M. | November 20, 2006 | ||
Birmingham, AL | EA-06-013 | ||
AND 05000366/2006- | Southern Nuclear Operating Company, Inc. | ||
On August 18, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an | ATTN: Mr. L. M. Stinson | ||
Vice President - Hatch Project | |||
P. O. Box 1295 | |||
Birmingham, AL 35201-1295 | |||
SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC MATERIAL CONTROL AND | |||
ACCOUNTING PROGRAM INSPECTION REPORT NO. 05000321/2006-401 | |||
AND 05000366/2006-401 | |||
Dear Mr. Stinson: | |||
On August 18, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection | |||
of the material control and accounting program at the Edwin I. Hatch Nuclear Plant. The | |||
purpose of the inspection was to review the circumstances pertaining to the reported discovery | purpose of the inspection was to review the circumstances pertaining to the reported discovery | ||
of fragments of irradiated fuel rods in the Unit 1 Spent Fuel Pool which were not included in | of fragments of irradiated fuel rods in the Unit 1 Spent Fuel Pool which were not included in | ||
your annual physical inventories of Special Nuclear Material (SNM) and the reported loss of | your annual physical inventories of Special Nuclear Material (SNM) and the reported loss of | ||
SNM in the form of approximately 18 inches (in the aggregate) of an irradiated fuel rod. | SNM in the form of approximately 18 inches (in the aggregate) of an irradiated fuel rod. The | ||
enclosed inspection report documents the inspection findings, which were discussed during an | enclosed inspection report documents the inspection findings, which were discussed during an | ||
exit meeting on August 18, 2006, with Mr. Dennis Madison and other members of your staff. | exit meeting on August 18, 2006, with Mr. Dennis Madison and other members of your staff. | ||
The inspection results were further discussed with members of your staff during a telephone | The inspection results were further discussed with members of your staff during a telephone | ||
conversation on September 27, 2006.The inspection examined activities conducted under your license as they relate to safety | conversation on September 27, 2006. | ||
The inspection examined activities conducted under your license as they relate to safety and | |||
compliance with the Commissions rules and regulations and with the conditions of your license. | |||
Within these areas, the inspection consisted of a selected examination of procedures and | Within these areas, the inspection consisted of a selected examination of procedures and | ||
representative records, observations of activities, and interviews with personnel.Based on the results of this inspection, an apparent violation of 10 CFR 74.19 was | representative records, observations of activities, and interviews with personnel. | ||
Enforcement Policy. | Based on the results of this inspection, an apparent violation of 10 CFR 74.19 was identified | ||
; select What We Do , Enforcement, then Enforcement Policy. | and is being considered for escalated enforcement action in accordance with the NRC | ||
inspection exit meeting. | Enforcement Policy. The current Enforcement Policy is included on the NRCs Web site at | ||
enforcement conference in order to enable the NRC to make an enforcement decision. | www.nrc.gov; select What We Do, Enforcement, then Enforcement Policy. The | ||
OFFICIAL USE ONLY - SECURITY-RELATED | circumstances surrounding the apparent violation, the significance of the issues, and the need | ||
date of this letter or (2) request a predecisional enforcement conference. | for lasting and effective corrective action were discussed with members of your staff at the | ||
held, it will be open for public observation. | inspection exit meeting. As a result, it may not be necessary to conduct a predecisional | ||
within 7 days of the date of this letter to notify the NRC of your intended response.If you choose to provide a written response, it should be clearly marked as a "Response to | enforcement conference in order to enable the NRC to make an enforcement decision. | ||
and should include for each apparent violation: | OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | ||
SNC 2 | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
Before the NRC makes its enforcement decision, we are providing you an opportunity to either: | |||
(1) respond to the apparent violation(s) addressed in this inspection report within 30 days of the | |||
date of this letter or (2) request a predecisional enforcement conference. If a conference is | |||
held, it will be open for public observation. Please contact Scott Shaeffer at (404)562-4521 | |||
within 7 days of the date of this letter to notify the NRC of your intended response. | |||
If you choose to provide a written response, it should be clearly marked as a "Response to An | |||
Apparent Violation in Inspection Report No. 50-321/2006-401, 50-366/2006-401; EA-06-013" | |||
and should include for each apparent violation: (1) the reason for the apparent violation, or, if | |||
contested, the basis for disputing the apparent violation; (2) the corrective steps that have been | contested, the basis for disputing the apparent violation; (2) the corrective steps that have been | ||
taken and the results achieved; (3) the corrective steps that will be taken to avoid further | taken and the results achieved; (3) the corrective steps that will be taken to avoid further | ||
violations; and (4) the date when full compliance will be achieved. | violations; and (4) the date when full compliance will be achieved. Your response may | ||
reference or include previously docketed correspondence, if the correspondence adequately | reference or include previously docketed correspondence, if the correspondence adequately | ||
addresses the required response. | addresses the required response. If an adequate response is not received within the time | ||
specified or an extension of time has not been granted by the NRC, the NRC will proceed with | specified or an extension of time has not been granted by the NRC, the NRC will proceed with | ||
its enforcement decision or schedule a predecisional enforcement conference.In accordance with 10 CFR 2.390 and the | its enforcement decision or schedule a predecisional enforcement conference. | ||
Publicly Available Records (PARS) component of | In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be | ||
is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The | available electronically for public inspection in the NRC Public Document Room or from the | ||
available for public inspection. Should you have any questions concerning this letter, please contact Mr. Shaeffer.Sincerely,/RA/Charles A. Casto, | Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS | ||
is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public | |||
OFFICIAL USE ONLY - SECURITY-RELATED | Electronic Reading Room). However, because of the security-related concerns contained in the | ||
General Manager, Plant Hatch | enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be | ||
Southern Nuclear Operating Company, Inc. | available for public inspection. | ||
11028 Hatch Parkway North | Should you have any questions concerning this letter, please contact Mr. Shaeffer. | ||
Baxley, GA | Sincerely, | ||
Bin B-022 | /RA/ | ||
Charles A. Casto, Director | |||
Division of Reactor Projects | |||
Docket Nos. 50-321, 50-366 | |||
License Nos. DPR-57, NPF-5 | |||
Enclosure: Inspection Report No. 50-321/2006-401 and 50-366/2006-401 | |||
w/Attachment: Supplemental Information | |||
(Official Use Only - Security-Related Information) | |||
cc w/encl: (see page 3) | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
SNC 3 | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
cc w/encl: Manager, Radioactive Materials Program | |||
D. R. Madison Department of Natural Resources | |||
General Manager, Plant Hatch 4244 International Parkway | |||
Southern Nuclear Operating Company, Inc. Suite 114 | |||
11028 Hatch Parkway North Atlanta, GA 30354 | |||
Baxley, GA 31513 | |||
Chairman | |||
Bentina C. Terry Appling County Commissioners | |||
Southern Nuclear Operating Company, Inc. 69 Tippins St., Suite 201 | |||
Bin B-022 Baxley, GA 31513 | |||
P. O. Box 1295 | P. O. Box 1295 | ||
Birmingham, AL 35201- | Birmingham, AL 35201-1295 Resident Manager | ||
Georgia Power Company | Oglethorpe Power Corporation | ||
Raymond D. Baker Edwin I. Hatch Nuclear Plant | |||
Manager Licensing - Hatch 11028 Hatch Parkway North | |||
Georgia Power Company Baxley, GA 31513 | |||
P. O. Box 1295 | P. O. Box 1295 | ||
Birmingham, AL | Birmingham, AL 35201 Senior Engineer - Power Supply | ||
Municipal Electric Authority | |||
Executive Vice President | cc w/o encl: of Georgia | ||
J. T. Gasser 1470 Riveredge Parkway NW | |||
Executive Vice President Atlanta, GA 30328-4684 | |||
Southern Nuclear Operating Company, Inc. | Southern Nuclear Operating Company, Inc. | ||
P. O. Box 1295 | P. O. Box 1295 Reece McAlister | ||
Birmingham, AL | Birmingham, AL 35201 Executive Secretary | ||
Georgia Public Service Commission | |||
Arthur H. Domby, Esq. 244 Washington Street, SW | |||
Troutman Sanders Atlanta, GA 30334 | |||
Nations Bank Plaza | Nations Bank Plaza | ||
600 Peachtree Street, NE, Suite 5200 | 600 Peachtree Street, NE, Suite 5200 Distribution w/encl: (See page 4) | ||
Atlanta, GA | Atlanta, GA 30308-2216 | ||
Laurence Bergen | |||
Oglethorpe Power Corporation | |||
2100 East Exchange Place | 2100 East Exchange Place | ||
P. | P. O. Box 1349 | ||
Tucker, GA | Tucker, GA 30085-1349 | ||
Director | |||
Department of Natural Resources | |||
205 Butler Street, SE, Suite 1252 | 205 Butler Street, SE, Suite 1252 | ||
Atlanta, GA | Atlanta, GA 30334 | ||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
SNC 4 | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
Letter to L. M. Stinson from Charles A. Casto dated November 20, 2006 | |||
SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC MATERIAL CONTROL AND | |||
ACCOUNTING PROGRAM INSPECTION REPORT NO. 05000321/2006-401 | |||
AND 05000366/2006-401 | |||
Distribution w/encl: | |||
B. Westreich, NSIR | |||
E. McNiel, NSIR | |||
Distribution w/o encl: | |||
R. Martin, NRR | |||
PUBLIC | |||
OFFICIAL USE ONLY - SECURITY-RELATED | OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | ||
AND 05000366/2006- | |||
E. McNiel, | |||
PUBLIC | |||
_ML063250191 | _ML063250191 | ||
E-MAIL COPY? YES NO | OFFICE RII:DFFI NSIR:DSO/MS RII:EICS NSIR:DSO/MS RII:DRP | ||
SIGNATURE DWF /RA/ MSW /RA/ CFE /RA/ BCW /RA/ SMS /RA/ | |||
NAME DJones MWilliams CEvans BWestreich S.Shaeffer | |||
DATE 11/15 /2006 11/14 /2006 11/14/2006 11/14/2006 11/15/2006 11/ /2006 | |||
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO | |||
}} | }} |
Latest revision as of 11:53, 23 November 2019
ML063250191 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 11/20/2006 |
From: | Casto C Division Reactor Projects II |
To: | Stinson L Southern Nuclear Operating Co |
References | |
EA-06-013 IR-06-401 | |
Download: ML063250191 (5) | |
See also: IR 05000321/2006401
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
November 20, 2006
Southern Nuclear Operating Company, Inc.
ATTN: Mr. L. M. Stinson
Vice President - Hatch Project
P. O. Box 1295
Birmingham, AL 35201-1295
SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC MATERIAL CONTROL AND
ACCOUNTING PROGRAM INSPECTION REPORT NO. 05000321/2006-401
Dear Mr. Stinson:
On August 18, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
of the material control and accounting program at the Edwin I. Hatch Nuclear Plant. The
purpose of the inspection was to review the circumstances pertaining to the reported discovery
of fragments of irradiated fuel rods in the Unit 1 Spent Fuel Pool which were not included in
your annual physical inventories of Special Nuclear Material (SNM) and the reported loss of
SNM in the form of approximately 18 inches (in the aggregate) of an irradiated fuel rod. The
enclosed inspection report documents the inspection findings, which were discussed during an
exit meeting on August 18, 2006, with Mr. Dennis Madison and other members of your staff.
The inspection results were further discussed with members of your staff during a telephone
conversation on September 27, 2006.
The inspection examined activities conducted under your license as they relate to safety and
compliance with the Commissions rules and regulations and with the conditions of your license.
Within these areas, the inspection consisted of a selected examination of procedures and
representative records, observations of activities, and interviews with personnel.
Based on the results of this inspection, an apparent violation of 10 CFR 74.19 was identified
and is being considered for escalated enforcement action in accordance with the NRC
Enforcement Policy. The current Enforcement Policy is included on the NRCs Web site at
www.nrc.gov; select What We Do, Enforcement, then Enforcement Policy. The
circumstances surrounding the apparent violation, the significance of the issues, and the need
for lasting and effective corrective action were discussed with members of your staff at the
inspection exit meeting. As a result, it may not be necessary to conduct a predecisional
enforcement conference in order to enable the NRC to make an enforcement decision.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
SNC 2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Before the NRC makes its enforcement decision, we are providing you an opportunity to either:
(1) respond to the apparent violation(s) addressed in this inspection report within 30 days of the
date of this letter or (2) request a predecisional enforcement conference. If a conference is
held, it will be open for public observation. Please contact Scott Shaeffer at (404)562-4521
within 7 days of the date of this letter to notify the NRC of your intended response.
If you choose to provide a written response, it should be clearly marked as a "Response to An
Apparent Violation in Inspection Report No. 50-321/2006-401, 50-366/2006-401; EA-06-013"
and should include for each apparent violation: (1) the reason for the apparent violation, or, if
contested, the basis for disputing the apparent violation; (2) the corrective steps that have been
taken and the results achieved; (3) the corrective steps that will be taken to avoid further
violations; and (4) the date when full compliance will be achieved. Your response may
reference or include previously docketed correspondence, if the correspondence adequately
addresses the required response. If an adequate response is not received within the time
specified or an extension of time has not been granted by the NRC, the NRC will proceed with
its enforcement decision or schedule a predecisional enforcement conference.
In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS
is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public
Electronic Reading Room). However, because of the security-related concerns contained in the
enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be
available for public inspection.
Should you have any questions concerning this letter, please contact Mr. Shaeffer.
Sincerely,
/RA/
Charles A. Casto, Director
Division of Reactor Projects
Docket Nos. 50-321, 50-366
Enclosure: Inspection Report No. 50-321/2006-401 and 50-366/2006-401
w/Attachment: Supplemental Information
(Official Use Only - Security-Related Information)
cc w/encl: (see page 3)
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
SNC 3
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
cc w/encl: Manager, Radioactive Materials Program
D. R. Madison Department of Natural Resources
General Manager, Plant Hatch 4244 International Parkway
Southern Nuclear Operating Company, Inc. Suite 114
11028 Hatch Parkway North Atlanta, GA 30354
Baxley, GA 31513
Chairman
Bentina C. Terry Appling County Commissioners
Southern Nuclear Operating Company, Inc. 69 Tippins St., Suite 201
Bin B-022 Baxley, GA 31513
P. O. Box 1295
Birmingham, AL 35201-1295 Resident Manager
Oglethorpe Power Corporation
Raymond D. Baker Edwin I. Hatch Nuclear Plant
Manager Licensing - Hatch 11028 Hatch Parkway North
Georgia Power Company Baxley, GA 31513
P. O. Box 1295
Birmingham, AL 35201 Senior Engineer - Power Supply
Municipal Electric Authority
cc w/o encl: of Georgia
J. T. Gasser 1470 Riveredge Parkway NW
Executive Vice President Atlanta, GA 30328-4684
Southern Nuclear Operating Company, Inc.
P. O. Box 1295 Reece McAlister
Birmingham, AL 35201 Executive Secretary
Georgia Public Service Commission
Arthur H. Domby, Esq. 244 Washington Street, SW
Troutman Sanders Atlanta, GA 30334
Nations Bank Plaza
600 Peachtree Street, NE, Suite 5200 Distribution w/encl: (See page 4)
Atlanta, GA 30308-2216
Laurence Bergen
Oglethorpe Power Corporation
2100 East Exchange Place
P. O. Box 1349
Tucker, GA 30085-1349
Director
Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
SNC 4
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Letter to L. M. Stinson from Charles A. Casto dated November 20, 2006
SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC MATERIAL CONTROL AND
ACCOUNTING PROGRAM INSPECTION REPORT NO. 05000321/2006-401
Distribution w/encl:
B. Westreich, NSIR
E. McNiel, NSIR
Distribution w/o encl:
R. Martin, NRR
PUBLIC
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
_ML063250191
OFFICE RII:DFFI NSIR:DSO/MS RII:EICS NSIR:DSO/MS RII:DRP
SIGNATURE DWF /RA/ MSW /RA/ CFE /RA/ BCW /RA/ SMS /RA/
NAME DJones MWilliams CEvans BWestreich S.Shaeffer
DATE 11/15 /2006 11/14 /2006 11/14/2006 11/14/2006 11/15/2006 11/ /2006
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO