Line 81: |
Line 81: |
| No findings were identified. | | No findings were identified. |
| {{a|1R04}} | | {{a|1R04}} |
| ==1R04 Equipment Alignment== | | ==1R04 Equipment Alignment |
|
| |
|
| ===.1 Partial System Walkdowns=== | | ===.1 Partial System Walkdowns=== |
| {{IP sample|IP=IP 71111.04Q|count=4}} | | {{IP sample|IP=IP 71111.04Q|count=4}}== |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
Line 102: |
Line 102: |
| No findings were identified. | | No findings were identified. |
| {{a|1R05}} | | {{a|1R05}} |
| ==1R05 Fire Protection== | | ==1R05 Fire Protection |
|
| |
|
| ===.1 Resident Inspector Quarterly Walkdowns=== | | ===.1 Resident Inspector Quarterly Walkdowns=== |
| {{IP sample|IP=IP 71111.05Q|count=7}} | | {{IP sample|IP=IP 71111.05Q|count== |
| | =7}} |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
|
---|
Category:Inspection Report
MONTHYEARIR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 IR 05000220/20230012023-05-0505 May 2023 Integrated Inspection Report 05000220/2023001 and 05000410/2023001 IR 05000220/20233012023-03-29029 March 2023 Initial Operator Licensing Examination Report 05000220/2023301 IR 05000220/20220062023-03-0101 March 2023 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022006 and 05000410/2022006) IR 05000220/20220042023-01-23023 January 2023 Integrated Inspection Report 05000220/2022004 and 05000410/2022004 IR 05000220/20220102022-11-22022 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000220/2022010 and 05000410/2022010 IR 05000220/20220032022-11-0404 November 2022 Integrated Inspection Report 05000220/2022003 and 05000410/2022003 IR 05000220/20220052022-08-31031 August 2022 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022005 and 05000410/2022005) IR 05000220/20224012022-08-30030 August 2022 Security Baseline Inspection Report 05000220/2022401 and 05000410/2022401 IR 05000220/20220022022-08-0808 August 2022 Integrated Inspection Report 05000220/2022002 and 05000410/2022002 and Independent Spent Fuel Storage Installation Report 07201036/2022001 IR 05000220/20210042022-05-19019 May 2022 Reissued Integrated Inspection Report 05000220/2021004 and 05000410/2021004 IR 05000220/20220012022-04-29029 April 2022 Integrated Inspection Report 05000220/2022001 and 05000410/2022001 IR 05000220/20210062022-03-0202 March 2022 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021006 and 05000410/2021006) ML22026A3502022-01-26026 January 2022 Integrated Inspection Report 05000220/2021004 and 05000410/2021004 IR 05000220/20210122022-01-10010 January 2022 Biennial Problem Identification and Resolution Inspection Report 05000220/2021012 and 05000410/2021012 IR 05000220/20210032021-11-0909 November 2021 Integrated Inspection Report 05000220/2021003 and 05000410/2021003 and Independent Spent Fuel Storage Installation Report 07201036/2021001 IR 05000220/20215012021-10-14014 October 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2021501 and 05000410/2021501 IR 05000220/20214012021-09-0101 September 2021 Material Control and Accounting Program Inspection Report 05000220/2021401 and 05000410/2021401 (Letter Only) IR 05000220/20210052021-09-0101 September 2021 Updated Inspection Plan for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021005 and 05000410/2021005) IR 05000220/20210102021-08-24024 August 2021 Triennial Fire Protection Inspection Report 05000220/2021010 and 05000410/2021010 IR 05000220/20210022021-08-10010 August 2021 Integrated Inspection Report 05000220/2021002 and 05000410/2021002 and Independent Spent Fuel Storage Installation Report 07201036/2021002 IR 05000220/20214022021-06-22022 June 2021 Security Baseline Inspection Report 05000220/2021402 and 05000410/2021402 IR 05000410/20213022021-05-12012 May 2021 Initial Operator Licensing Examination Report 05000410/2021302 IR 05000220/20210012021-05-0505 May 2021 Integrated Inspection Report 05000220/2021001 and 05000410/2021001 IR 05000220/20210112021-05-0404 May 2021 Temporary Instruction 2515/194 Inspection Report 05000220/2021011 and 05000410/2021011 IR 05000220/20200062021-03-0303 March 2021 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2020006 and 05000410/2020006) IR 05000220/20200042021-02-11011 February 2021 Integrated Inspection Report 05000220/2020004 and 05000410/2020004 and Independent Spent Fuel Storage Installation Report 07201036/202004 IR 05000220/20203012021-01-25025 January 2021 Initial Operator Licensing Examination Report 05000220/2020301 IR 05000220/20204202020-12-0909 December 2020 Security Inspection Report 05000220/2020420 and 05000410/2020420 2020 Report ML20343A0112020-12-0909 December 2020 Security Inspection Report Cover Letter 05000220/2020420 and 05000410/2020420 IR 05000220/20200102020-11-24024 November 2020 Design Basis Assurance Inspection (Teams) Inspection Report 05000220/2020010 and 05000410/2020010 IR 05000220/20200032020-11-10010 November 2020 Integrated Inspection Report 05000220/2020003 and 05000410/2020003 IR 05000220/20200052020-08-31031 August 2020 Updated Inspection Plan for the Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2020005 and 05000410/2020005) IR 05000220/20204012020-07-29029 July 2020 Security Baseline Inspection Report 05000220/2020401 and 05000410/2020401 ML20149K4122020-05-29029 May 2020 Request for Information for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000220/2020010 and 05000410/2020010 IR 05000220/20200012020-05-0404 May 2020 Integrated Inspection Report 05000220/2020001 and 05000410/2020001 and Independent Spent Fuel Storage Installation Inspection Report 07201036/2020001 IR 05000220/20190062020-03-0303 March 2020 Annual Assessment Letter for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2019006 and 05000410/2019006) IR 05000410/20193012020-02-11011 February 2020 Initial Operator Licensing Examination Report 05000410/2019301 2024-02-01
[Table view] Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] |
Text
{{#Wiki_filter:UNITED STATES ber 13, 2013
SUBJECT:
NINE MILE POINT NUCLEAR STATION, LLC - NRC INTEGRATED INSPECTION REPORT 05000220/2013004 AND 05000410/2013004
Dear Mr. Costanzo:
On September 30, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Nine Mile Point Nuclear Station, LLC (NMPNS) Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on October 24, 2013, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Daniel L. Schroeder, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos: 50-220 and 50-410 License Nos: DPR-63 and NPF-69
Enclosure:
Inspection Report 05000220/2013004 and 05000410/2013004 w/ Attachment: Supplementary Information
REGION I==
Docket Nos: 50-220 and 50-410 License Nos: DPR-63 and NPF-69 Report Nos: 05000220/2013004 and 05000410/2013004 Licensee: Constellation Energy Nuclear Group, LLC (CENG)
Facility: Nine Mile Point Nuclear Station, LLC (NMPNS)
Units 1 and 2 Location: Oswego, NY Dates: July 1, 2013, through September 30, 2013 Inspectors: K. Kolaczyk, Senior Resident Inspector E. Miller, Resident Inspector J. Ambrosini, Senior Resident Inspector J. DeBoer, Project Engineer B. Dionne, Health Physicist S. Hammann, Senior Health Physicist P. Kaufman, Senior Reactor Inspector J. Krafty, Resident Inspector J. Laughlin, Emergency Preparedness Inspector Approved by: Daniel L. Schroeder, Chief Reactor Projects Branch 1 Division of Reactor Projects Enclosure
SUMMARY
IR 05000220/2013004, 05000410/2013004; 07/01/2013 - 09/30/2013; Nine Mile Point Nuclear
Station (NMPNS), Units 1 and 2; Routine Integrated Inspection Report.
The report covered a 3-month period of inspection by resident inspectors and announced inspections performed by regional inspectors. The inspectors identified no findings during this period. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4.
No findings were identified.
REPORT DETAILS
Summary of Plant Status
Unit 1 began the inspection period at 100 percent power. On July 3, 2013, power was decreased to 90 percent to start recirculation pump 15. Power was returned to 100 percent later that day. On July 8, Unit 1 was shut down due to elevated unidentified leakage in the primary containment. Following identification of the source of the leakage and the completion of repairs to the reactor water cleanup vent valve 33-61, Unit 1 returned to 100 percent power on July 12. On July 13, power was reduced to 75 percent for a rod pattern adjustment and later that day returned to 100 percent power. On September 9, Unit 1 decreased power to 90 percent to perform turbine stop valve testing and remove recirculation pump 13 from service.
Reactor power was returned to 100 percent later that day. Unit 1 remained at full power for the remainder for the inspection period.
Unit 2 began the inspection period at 100 percent power. On July 19, 2013, reactor power was decreased to 98 percent due to high condensate pump discharge header temperature. Power was returned to 100 percent later that day. On September 7, Unit 2 reduced power to 85 percent to conduct turbine stop valve testing, returning to full power that same day. On September 21, Unit 2 reduced power to 70 percent to perform a control rod pattern adjustment and scram time testing. Unit 2 returned to full power on September 22 and operated at full power for the remainder of the inspection period.
REACTOR SAFETY
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
1R01 Adverse Weather Protection
Main article: IP 71111.01
Readiness for Seasonal Extreme Weather Conditions
a. Inspection Scope
The inspectors performed a review of the stations readiness for the onset of seasonal high temperatures. The review focused on Unit 1 batteries 11 and 12 and emergency diesel generators (EDGs) 102 and 103 on July 17, 2013. The inspectors reviewed the Updated Final Safety Analysis Report (UFSAR), technical specifications (TSs), and the corrective action program (CAP) to determine what temperatures or other seasonal weather could challenge these systems, and to ensure CENG personnel had adequately prepared for these challenges. The inspectors reviewed station procedures including CENGs seasonal weather readiness procedure and applicable operating procedures.
The inspectors performed walkdowns of the selected systems to ensure station personnel identified issues that could challenge the operability of the systems during hot weather conditions. Documents reviewed for each section of this inspection report are listed in the Attachment.
b. Findings
No findings were identified.
==1R04 Equipment Alignment
.1 Partial System Walkdowns
Main article: IP 71111.04Q ==
a. Inspection Scope
The inspectors performed partial walkdowns of the following systems:
Unit 2 Division I standby gas treatment system (SGTS) following functional testing on July 18, 2013 Unit 1 uninterruptible power supply (UPS) system for the reactor protection system bus 11 following the trip of the alternating current (AC) breaker for UPS 162A and B on July 22, 2013 Unit 1 offsite power systems following testing on EDG 102 on July 25, 2013 Unit 2 high-pressure core spray (HPCS) system while the reactor core isolation cooling (RCIC) system was out of service (OOS) for planned maintenance on August 6, 2013 The inspectors selected these systems based on their risk significance relative to the reactor safety cornerstones at the time they were inspected. The inspectors reviewed applicable operating procedures, system diagrams, the UFSAR, TSs, work orders (WOs), condition reports (CRs), and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have impacted system performance of their intended safety functions. The inspectors also performed field walkdowns of accessible portions of the systems to verify system components and support equipment were aligned correctly and were operable. The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no deficiencies. The inspectors also reviewed whether CENG staff had properly identified equipment issues and entered them into the CAP for resolution with the appropriate significance characterization.
b. Findings
No findings were identified.
.2 Full System Walkdown
Main article: IP 71111.04S
a. Inspection Scope
On September 17, 2013, the inspectors performed a complete system walkdown of accessible portions of the Unit 1 primary containment isolation valves to verify the existing equipment lineup was correct. The inspectors reviewed operating procedures, drawings, completed surveillances, and the UFSAR to verify the system was aligned to perform its required safety functions. The inspectors performed field walkdowns of accessible portions of the system to verify system components and support equipment were aligned correctly and operable. The inspectors examined the material condition of components and observed operating parameters of equipment to verify that there were no deficiencies. Additionally, the inspectors reviewed a sample of related CRs and WOs to ensure CENG personnel appropriately evaluated and resolved any deficiencies.
b. Findings
No findings were identified.
==1R05 Fire Protection
.1 Resident Inspector Quarterly Walkdowns
Main article: IP 71111.05Q